Slide 1: Ireland Inc - Presentation for LD Micro Conference
IRELAND INC Presentation for LD Micro Conference December 2009

Slide 2: Forward Looking Statements
Forward Looking Statements This Presentation may contain, in addition to historical information, forward-looking statements. Statements in this Presentation that are forward-looking statements are subject to various risks and uncertainties concerning the specific factors disclosed under the heading

Slide 3: Company Vision
Company Vision Build Ireland (IRLD) into a significant mid-tier mining company • IRLD has two precious metal projects with significant potential • Columbus Project - Acquired 100% Gold / Silver mining rights Option to Expand • Red Mountain Project – Option to buy 100% Gold / Tungsten / Silver mining

Slide 4: Columbus Project - Opportunity
Columbus Project- Opportunity With permits already granted, the Columbus Project is expect to be in production in 2010. Prefeasibility work and drilling programs for the Columbus Project have been ongoing for the past several years and have: Identified an area containing approx. 200 million tons of

Slide 5: Overview Columbus Project
Overview Columbus Project • Gold and Silver Project • A “dry salt marsh” with drill indicated zones of surface mineable material • Mine site production permit has been granted • Short production horizon Columbus Project Mill-Site Facility 5

Slide 6: Location
Location The Project is located between Las Vegas & Reno in the Columbus Basin, in Esmeralda County, Nevada – a region with a proven history of major discoveries of gold and silver. 6

Slide 7: Rich Regional History
Rich Regional History Columbus Project is in a mineralized area: • Round Mountain (Gold)* • Owned by Barrick and Kinross • 20 M oz gold deposit • 16 M oz mined (12M oz extracted to 2008) • 97% “invisible” gold • Head Grade 0.018 opt Au • 2008 Production: +/-600k oz Au @125K tpd ore (cyanide) • ~ 60

Slide 8: Project Assets
Project Assets The Columbus Project consists of : • 19,680 acres of mineral claims on federal land administered by the BLM (Bureau of Land Management), with an option for an additional ~22,640 acres. • 380 acres permitted to 40 feet for extraction of gold, silver and production of Calcium Carbonate

Slide 9: Technical Program
Technical Program 2008 Exploratory Drill Program • 39-hole drill program conducted in “Area of Interest” (~5,000 acres / 8 sqr miles) • New Gold/Silver Discovery – Large Tonnage Potential • Three surface mineable areas: ~1,590 acres • Surface up to 200 foot depth • ~200MM tons potentially mineable m

Slide 10: Zone B – Mineralized Intercepts
Zone B – Mineralized Intercepts • Mineralized intercepts • Mineralization appears • Dredge mining method (identified to date) to be unbounded in all could cost effectively average grade of 0.045 directions mine up to 200 foot depth opt Au Equivalent or more 10

Slide 11: Project Prefeasibility
Project Prefeasibility Extraction Leach Test Results Parameter Test Size Au Equivalent % Recovered % Recovered as (lbs) Head Grade (opt) into Solution Metal-in-Hand Zone A – Permitted Mine Area 1,738 0.062 86.6% 69.4% Zone B – Hole (S7B) 2,000 0.070 94.4% 84.1% Zone B – Drill Composite (S1B) 5.5 0.0

Slide 12: Independent Confirmation
Independent Confirmation All reported work to date has been completed and performed by third party engineers/geologists under Chain of Custody (COC) Technical Team – Independent firms: Permitting Lumos & Associates – based in Reno, NV Project Resources McEwen Geological – Drill program management /

Slide 13: Project Pre-Feasibility
Project Pre-Feasibility Process Flow Diagram Estimated Operating Costs (similar to typical Tank Leach Operations) ~ $10/ton Current Production Permits: mine up to 792,000tpy in Zone A – Permitted Mine Area, a 320-acre area, to a depth of 40 ft. (estimated mine life 17+ years) 13

Slide 14: 2009 Completed Milestones
2009 Completed Milestones • Discovered mineralized areas; ~1,590 acres potential • Average Sample grade of 0.041 opt Au equivalent • Completed two ~2,000-lbs pilot scale leach tests • Extracted Au & Ag with simple direct leach process • Recovered ~70% to 83% of Au and Ag as metal-in-hand • Completed

Slide 15: Project Development – 2009/2010
Project Development – 2009/2010 Determine Increased Project Resources/Reserves • Expanded drilled area with completed 2009 drill program • Calculate increased project resources and reserves • Complete resources/reserves technical report Complete Project Feasibility • Complete additional bench/bulk l

Slide 16: Project Summary
Project Summary The Columbus Project represents a solid exploration and production opportunity: • Full permit for the extraction of Gold and Silver and the production of Calcium Carbonate • “Big Box Store” of mining operations: high volume and low cost • Near term production potential 16

Slide 17: Financial Information
Financial Information 17

Slide 18: Capitalization and Finances
Capitalization and Finances Capitalization (11/30/2009) Issued and Outstanding 110,899,442 Free Float ~54,000,000 Total Fully Diluted 137,722,430 Market Capitalization (current) ~$50 M Finances Cash (09/30/09) ~$592,000 Recent Financing ~$4,800,000 Budget (Oct 1 ‘09 to June 30 ‘10) $3,312,000 18

Slide 19: Expenses
Expenses Cash Expenses Budget (09/01/09 – 06/30/10) Columbus Project Property Payments $ 30,000 Drilling Program and Resource Estimates 395,000 Pilot Plant / Project Feasibility 1,887,000 Columbus Project Sub-Total 2,312,000 Red Mountain Project 60,000 General and Admin. 940,000 Cash Expenditure $3,

Slide 20: Investment Summary
Investment Summary Exploration company with goal of production in 2010 Columbus project has already identified approx. 200m tons of mineable material – avg. sample grade of 0.041 opt of gold equivalent Assembled Talented Technical Team Strong Mineral / Metal Prices 20

Slide 21: Ireland Inc.
Ireland Inc. Corporate Office: 2441 West Horizon Ridge Parkway, Suite 100 Henderson, NV, 89052 (702) 932-0353 info@irelandminerals. com http://www. irelandminerals.com InvestorRelations: Terri MacInnis R. Jerry Falkner, CFA Bibicoff + MacInnis, Inc. RJ Falkner & Company, Inc. Tel: 818-379-8500 Tel:
Source: SEC EDGAR · 8-K filed Dec 10, 2009
More decks from Ireland Inc
Corporate Update (November 2012)18 slides · Nov 29, 2012
LD Micro Conference (December 2011)10 slides · Dec 8, 2011
Rodman & Renshaw Conference September 201121 slides · Sep 9, 2011
Sidoti Micro Cap Conference June 201021 slides · Jun 30, 2010
Chicago Resource Expo April 201021 slides · Apr 21, 2010
Investor Presentation (April 2010)21 slides · Apr 15, 2010