Slide 1: Investor Update Conference Call
IRELANDINC Investor Update Conference Call November 16, 2012

Slide 2: Forward Looking Statements; Cautionary Note Regarding Estimates
Forward Looking Statements This Presentation may contain, in addition to historical information, forward-looking statements. Statements in this Presentation that are forward-looking statements are subject to various risks and uncertainties concerning the specific factors disclosed under the heading

Slide 3: Company Vision
Company Vision Create value for shareholders through the exploration, development and monetization of two precious metal projects in the U.S. Columbus Project – In active development (surface mining) Own 100% of Gold / Silver mining rights Option to Expand Red Mountain Project – Not in active develo

Slide 4: Overview – Columbus Project
Overview – Columbus Project Gold and Silver Project A “dry salt marsh” with drill-indicated zones of surface mineable material Located between Las Vegas and Reno in the Columbus Basin (Esmeralda County, Nevada) – a region with a proven history of major gold and silver discoveries Mine site productio

Slide 5: Why Invest in Ireland?
Why Invest in Ireland? Columbus Project 1. Large Opportunity 2. Growing Opportunity 3. Low Cost Mining Process 4. Near-Term Production Expected 5

Slide 6: Why Invest in Ireland? Large Opportunity
Why Invest in Ireland? Large Opportunity Resource Potential North Sand Zone Drilled Area: 0.67 square miles Drilled Depth: 200 feet Mineralization: 145 million tons at 0.038 opt AuE (0.034 opt Au, 0.179 opt Ag) South Sand Zone Drilled Area: 0.48 square miles Drilled Depth: 100 feet Mineralization: 2

Slide 7: Why Invest in Ireland? Growing Opportunity
Why Invest in Ireland? Growing Opportunity Gold and Silver: Exploration to Date Established total Inferred Mineral Resource of 174 Million tons at 0.038 opt AuE Future exploration planned to expand mineralized zone. Phase 4 Drill Program Permitted to drill area of ~0.5 sq miles adjacent to North San

Slide 8: Why Invest in Ireland? Low Cost Mining Operation
Why Invest in Ireland? Low Cost Mining Operation Operating Cost Estimates and Goals Processing: ~ $12/ton of Sand Material Extraction: 0.029 opt AuE (75% of 0.038 opt AuE) Gold Cost: $400/oz AuE Produced Project Potential Strong positioning for production or acquisition (Hard Rock Mining Comparison

Slide 9: Why Invest in Ireland? Near-Term Production Potential
Why Invest in Ireland? Near-Term Production Potential On-Site Pilot Plant Installed: Gold/Silver Concentrating & Leach Circuits and Resin Extraction Circuit. Start Up: Optimizing Underway 1st Gold Pour: Expected to start in Q4 Feasibility: Expect processing of multi-ton samples to determine feasibil

Slide 10: Columbus Project Assets
Columbus Project Assets 25,498 acres of mineral claims on federal land administered by the BLM (Bureau of Land Management), with an option for an additional 23,280 acres 380 acres permitted to 40-foot depth for extraction of gold and silver (Permitted Area) 266 acre mine site, 60 acre mill site with

Slide 11: Drill Program
Drill Program 11

Slide 12: Drill Program
Drill Program Identified Two Mineralized Sand Zones. Initial drill results in North Sand Zone (0.67 sq. miles) contains Inferred Resource of 145 million tons with 0.038 opt AuE to a depth of 200’ Initial drill results in South Sand Zone show Inferred Resource of 29 million tons with average sample g

Slide 13: Project Feasibility
Project Feasibility 13

Slide 14: Process Flow Diagram
Process Flow Diagram Mine Wet Mix Gravity Leach Au/Ag Screen Screen Concentrate Filter Solution -1/4 inch -50 Mesh Au/Ag Cons Resin Extract (90% Head Ore) (50% HO) (20% HO) Gold/Silver + Excavate/Screen + Delaminates Clays + Removes Silt, + Dissolves Au/Ag . Clays, Organics Coatings * Convey to Plan

Slide 15: Independent Confirmation
Independent Confirmation All reported work to date has been completed and performed by third party engineers/geologists under Chain of Custody (COC) Technical Team – independent firms: Permitting Lumos & Associates Telesto Nevada, Inc Project Resources AuRIC Metallurgical Labs – Sample Assaying/Bulk

Slide 16: Project Goals 2012 & 2013
Project Goals 2012 & 2013 1. Confirm Commercial Process for Extracting Au/Ag Optimizing pilot plant operating parameters with onsite laboratory testing using CF and CN / STS leaching Bulk Sampling through Pilot Plant (up to 2,000 tons) Determine Extraction Rates and Operating Costs Confirm Extractio

Slide 17: Investment Summary
Investment Summary Pilot Plant Operating – Optimizing Leach Circuit Inferred Sand Resource of 145 million tons with sample grade of 0.038 opt AuE identified in the North Sand Zone Drill program to resume in Q1 ’13. Environmentally neutral Leach Process Goal: Produce Au for $400/oz Talented technical

Slide 18: Ireland Inc.
Ireland Inc. Corporate Office: 2441 West Horizon Ridge Parkway, Suite 100 Henderson, NV, 89052 (702) 932-0353 [email protected] http://www.irelandminerals.com Investor Relations: Terri MacInnis R. Jerry Falkner, CFA Bibicoff + MacInnis, Inc. RJ Falkner & Company, Inc. Tel: 818-379-8500 Tel: 8
Source: SEC EDGAR · 8-K filed Nov 29, 2012
More decks from Ireland Inc
LD Micro Conference (December 2011)10 slides · Dec 8, 2011
Rodman & Renshaw Conference September 201121 slides · Sep 9, 2011
Sidoti Micro Cap Conference June 201021 slides · Jun 30, 2010
Chicago Resource Expo April 201021 slides · Apr 21, 2010
Investor Presentation (April 2010)21 slides · Apr 15, 2010
Investor Presentation (February 2010)21 slides · Feb 3, 2010