Ireland — Rodman & Renshaw Conference September 2011
21 slides from Ireland's conference presentation, Sep 9, 2011

Slide 1: Rodman & Renshaw Conference September 2011
IRELANDINC Rodman & Renshaw Conference September 2011

Slide 2: Forward Looking Statements
Forward Looking Statements This Presentation may contain, in addition to historical information, forward-looking statements. Statements in this Presentation that are forward-looking statements are subject to various risks and uncertainties concerning the specific factors disclosed under the heading

Slide 3: Cautionary Note Regarding Estimates
Cautionary Note Regarding Estimates This presentation uses the terms “inferred,” “indicated,” and “measured resources”. The United States Securities and Exchange Commission (the “SEC”) does not normally permit issuers to disclose resource estimates in their filings with the SEC. SEC guidelines norma

Slide 4: Company Vision
Company Vision Create value for shareholders by the development through to monetization of two precious metal projects. • Columbus Project – In active development (surface mining) Owns 100% of Gold / Silver mining rights Option to Expand • Red Mountain Project – Not in active development Option to a

Slide 5: Why Invest in Ireland? Columbus Project
Why Invest in Ireland? Columbus Project 1. Large Opportunity 2. Growing Opportunity 3. Low Cost Process 4. Near Term Production Potential 5

Slide 6: Why Invest in Ireland? Large Opportunity
Why Invest in Ireland? Large Opportunity -- ‘08 and ‘09 drill programs outlined seven mineralized zones (2-Sand zones; 5- Clay zones) within 5,000 acre “area of interest” -- Current focus on Sand zones of 110+ million tons inferred with an average grade of 0.040 ounces per ton gold equivalent (AuE)

Slide 7: Why Invest in Ireland? Growing Opportunity
Why Invest in Ireland? Growing Opportunity -- Mineralized area is still open in all directions -- Results from 2010 drill program are expected shortly -- 2010 drill program was designed to both expand and further delineate the Sand Resources by in-fill drilling Goal is to increase the tonnage and to

Slide 8: Why Invest in Ireland? Lower Cost Process
Why Invest in Ireland? Lower Cost Process Process Cost Estimates ~ $12/ton of Sand Material Goal: 75% extraction of 0.040 opt AuE (current test results exceeding goal) If achieved: Operating Costs ~ $400/oz Au Hard Rock Mining Comparison ~$450 - $550/oz Au Expect to be Low Cost Operation: Strong pos

Slide 9: Why Invest in Ireland? Near Term Production Potential
Why Invest in Ireland? • Near Term Production Potential -- Gold/Silver leach extraction circuit installed at onsite pilot plant in Q3 2011 -- Currently optimizing precious metals extraction circuit for Sand Material -- Pilot Plant operations expected to determine feasibility of Project in 2012 9

Slide 10: Management Team
Management Team Douglas Birnie – Chief Executive Officer, President and Director Mr. Birnie was a founder of Columbus Group Communications Inc., a privately-owned company that was acquired by TELUS Corp., one of Canada’s leading telecommunications companies. Robert McDougal – Chief Financial Officer

Slide 11: Overview – Columbus Project
Overview – Columbus Project • Gold and Silver Project • A “dry salt marsh” with drill indicated zones of surface mineable material • Located between Las Vegas and Reno in the Columbus Basin, in Esmeralda County, Nevada – a region with a proven history of major discoveries of gold and silver • Mine s

Slide 12: Columbus Project Assets
Columbus Project Assets 19,738 acres of mineral claims on federal land administered by the BLM (Bureau of Land Management), with an option for an additional 23,440 acres 378 acres permitted to 40 feet for extraction of gold and silver (Permitted Area) - 320 acre mine site, 58 acre mill site - 15,000

Slide 13: Drill Program 2008 and 2009
Drill Program 2008 and 2009 Identified Seven Mineralized Zones with Inferred Resource of 343MM tons with 0.040 opt AuE, including 110+MM tons of Sand Material. All reported drill results are by Caustic Fusion Assay and analysis of extracted metal-in-hand for Gold and Silver. The Caustic Fusion proto

Slide 14: Bulk Extraction Test Results
Bulk Extraction Test Results Need to prove extraction process is economically viable as next step of Project Feasibility. Goal: 75% Au recovery. Sand Material Head Ore (HO) Cyanide Leach Thiosulphate Caustic Fusion Extraction Leach Extraction Test Au opt Ag opt Au % Ag % Au % Ag % 3747C 0.082 1.772

Slide 15: Independent Confirmation
Independent Confirmation All reported work to date has been completed and performed by third party engineers/geologists under Chain of Custody (COC) Technical Team – independent firms: Permitting Lumos & Associates – based in Reno, NV Project Resources McEwen Geological – Drilling Management / Resou

Slide 16: Project Goals 2011 - 2012
Project Goals 2011 - 2012 1. Confirm we have excess of 250 million tons of Sand Resources Define by Drilling and Bulk Sampling (1.5 sq. miles by 200 foot depth) Report Drilling and Bulk Sample Results 2. Confirm Commercial Process for Extracting Au/Ag Process up to 2,000 tons at pilot plant Determin

Slide 17: Financial Information
Financial Information 17

Slide 18: Capitalization and Finances
Capitalization and Finances Capitalization (6/30/2011) Issued and Outstanding 127,452,641 Free Float ~ 59,000,000 Total Fully Diluted 167,595,795 Market Capitalization (6/30/2011) ~ $65 MM Finances Cash(06/30/11) ~ $2,714,000 Budget (July 1 ‘11 to Jun 31 ‘12) ~ $5,830,000 Expected Cash Position (06/

Slide 19: Expenses
Expenses Cash Expenses Budget (07/01/11 – 06/30/12) Columbus Project Property Payments $ 280,000 Drilling Program and Resource Estimates 1,836,000 Pilot Plant / Project Feasibility 1,799,000 Columbus Project Sub-Total 3,915,000 Red Mountain Project 90,000 General and Admin. 1,825,000 Cash Expenditur

Slide 20: Investment Summary
Investment Summary Pilot Plant Operating – Optimizing Leach Circuit Inferred Sand Resource of 110+MM tons grading 0.040 opt AuE identified by 2008/2009 Drilling – Potential to increase resources by 2010/2011 Drilling and Bulk Sampling Environmentally neutral Leach Process. Goal: Produce Au for <$400

Slide 21: Ireland Inc.
Ireland Inc. Corporate Office: 2441 West Horizon Ridge Parkway, Suite 100 Henderson, NV, 89052 (702) 932-0353 [email protected] http://www.irelandminerals.com Investor Relations: Terri MacInnis R. Jerry Falkner, CFA Bibicoff + MacInnis, Inc. RJ Falkner & Company, Inc. Tel: 818-379-8500 Tel: 8
Source: SEC EDGAR · 8-K filed Sep 9, 2011
More decks from Ireland Inc
Corporate Update (November 2012)18 slides · Nov 29, 2012
LD Micro Conference (December 2011)10 slides · Dec 8, 2011
Sidoti Micro Cap Conference June 201021 slides · Jun 30, 2010
Chicago Resource Expo April 201021 slides · Apr 21, 2010
Investor Presentation (April 2010)21 slides · Apr 15, 2010
Investor Presentation (February 2010)21 slides · Feb 3, 2010