Ireland Inc

Ireland — Investor Presentation (April 2010)

21 slides from Ireland's investor presentation, Apr 15, 2010

  1. Slide 1: Investor Relations Presentation

    Slide 1: Investor Relations Presentation

    IRELANDINC Investor Relations Presentation March 2010

  2. Slide 2: Forward Looking Statements

    Slide 2: Forward Looking Statements

    Forward Looking Statements This Presentation may contain, in addition to historical information, forward -looking statements. Statements in this Presentation that are forward -looking statements are subject to various risks and uncertainties concerning the specific factors disclosed under the headin

  3. Slide 3: Company Vision

    Slide 3: Company Vision

    Company Vision Build Ireland (IRLD) into a significant mid-tier mining company through the development to monetization of two precious metal projects. • Columbus Project – In active development Owns 100% of Gold / Silver mining rights Option to Expand • Red Mountain Project – Not in active developme

  4. Slide 4: Management Team

    Slide 4: Management Team

    Management Team Douglas Birnie– Chief Executive Officer, President and Director Mr. Birnie was a founder of Columbus Group Communications Inc., a privately -owned company that was acquired by TELUS Corp., one of Canada’s leading telecommunications companies Robert McDougal– Chief Financial Officer a

  5. Slide 5: Overview – Columbus Project

    Slide 5: Overview – Columbus Project

    Overview– Columbus Project • Gold and Silver Project • A “dry salt marsh” with drill indicated zones of surface mineable material • Located between Las Vegas and Reno in the Columbus Basin, in Esmeralda County, Nevada – a region with a proven history of major discoveries of gold and silver • Mine si

  6. Slide 6: Columbus Project - Opportunity

    Slide 6: Columbus Project - Opportunity

    Columbus Project- Opportunity With permits already granted, the Columbus Project is expected to be in production in 2010. Prefeasibility work and drilling programs are ongoing. As a result of the 2008 Drilling Program,we have: Identified an area containing approx. 200 million tons of mineable materi

  7. Slide 7: Columbus Project - Regional History

    Slide 7: Columbus Project - Regional History

    Columbus Project- Regional History • Round Mountain (Gold)* • Owned by Barrick and Kinross • 20 M oz gold deposit / 16 M oz mined • ~ 75% extraction rate • 97% “invisible” gold • Head Grade 0.018 opt Au • ~ 60 miles from Columbus Project • Candelaria (Silver)* • 151 M oz of silver identified • 68 M

  8. Slide 8: Columbus Project Assets

    Slide 8: Columbus Project Assets

    Columbus Project Assets • 19,680 acres of mineral claims on federal land administered by the BLM (Bureau of Land Management), with an option for an additional ~22,640 acres. • 380 acres permitted to 40 feet for extraction of gold and silver (Zone A – Permitted Area) - 320 acre mine site, 60 acre mil

  9. Slide 9: Exploratory Drill Program '08/09

    Slide 9: Exploratory Drill Program '08/09

    Exploratory Drill Program ’08/09 97-hole drill program conducted in “Area of Interest” (~5,000 acres / 8 sq. miles) New Gold/Silver Discovery – Large Tonnage Potential • Three surface mineable areas: ~1,590 acres • Surface to 200 foot depth • ~200MM tons potentially mineable material • Sample averag

  10. Slide 10: Project Prefeasibility

    Slide 10: Project Prefeasibility

    Project Prefeasibility Direct Solution Leach ExtractionTest Results Parameter Test Size Au Equivalent % Recovered % Recovered as (lbs) Head Grade (opt) into Solution Metal-in-Hand Zone A – Permitted Mine Area 1,738 0.062 86.6% 69.4% Zone B – Hole (S7B) 2,000 0.070 94.4% 84.1% Zone B – Drill Composit

  11. Slide 11: Process Flow Diagram

    Slide 11: Process Flow Diagram

    Process Flow Diagram • Dredge Mining • Leach in Agitated • Evaluating • Tails returned to Unit Tanks Solid/Liquid basin (natural Separation tailings pond) Methods: • Material Processed • Environmentally • Decantation • Metal extracted as a slurry Neutral Process • Flocculation from solution to • Fil

  12. Slide 12: Independent Confirmation

    Slide 12: Independent Confirmation

    Independent Confirmation All reported work to date has been completed and performed by third party engineers/geologists under Chain of Custody(COC) Technical Team– Independent firms: Permitting Lumos & Associates – based in Reno, NV Project Resources McEwen Geological – Drill program management / Mo

  13. Slide 13: 2009 Accomplishments

    Slide 13: 2009 Accomplishments

    2009 Accomplishments • Discovered mineralized areas; ~1,590 acres potential • 200 MM tons of mineable material with an average sample grade of 0.041 opt Au equivalent • Defined simple direct leach extraction process • Showed consistency in extraction • Defined and refined extraction process • Comple

  14. Slide 14: Project Development 2010

    Slide 14: Project Development 2010

    Project Development 2010 Determine IncreasedProject Resources/Reserves • Expanded drilled area with completed 2009 drill program • Calculate increased project resources and reserves • Complete resources/reserves technical report Complete Project Feasibility • Operate on-site pilot plant to optimize/

  15. Slide 15: Columbus Project Summary

    Slide 15: Columbus Project Summary

    Columbus Project Summary A solid exploration and production opportunity with: • Full permit for the extraction of Gold and Silver • High volume and low cost mining operation • Surface mining with environmentally neutral process • Near term production expected 15

  16. Slide 16: Red Mountain Project

    Slide 16: Red Mountain Project

    Red Mountain Project • Option to acquire 100% by Dec 31, 2011 • Longer term exploration project for Gold, Tungsten and Silver • Over 25 years of sampling and testing • Drilling and Sampling planned for 2010 Red Mountain, CA 137 miles northeast of Los Angeles 16

  17. Slide 17: Financial Information

    Slide 17: Financial Information

    Financial Information 17

  18. Slide 18: Capitalization and Finances

    Slide 18: Capitalization and Finances

    Capitalization and Finances Capitalization (3/18/2010) Issued and Outstanding 121,934,442 Free Float ~54,000,000 Total Fully Diluted 158,648,126 Market Capitalization (3/18/2010) ~$120 MM Finances Cash (12/31/09) ~$3,650,000 January Financing ~$4,965,000 Budget (Jan 1 ‘10 to Dec 31 ‘10) $6,450,000 1

  19. Slide 19: Expenses

    Slide 19: Expenses

    Expenses Cash Expenses Budget (01/01/10 – 12/31/10) Columbus Project Property Payments $ 130,000 Drilling Program and Resource Estimates 1,255,000 Pilot Plant / Project Feasibility 2,765,000 Columbus Project Sub-Total 4,150,000 Red Mountain Project 550,000 General and Admin. 1,750,000 Cash Expenditu

  20. Slide 20: Investment Summary

    Slide 20: Investment Summary

    Investment Summary Exploration company with production expected by mid-2010 Anticipate increase in total mineable material with 2009 and 2010 Drilling Program results Simple, environmentally neutral leaching extraction process indicates ~75% extraction Assembled Talented Technical Team 20

  21. Slide 21: Ireland Inc.

    Slide 21: Ireland Inc.

    Ireland Inc. Corporate Office: 2441 West Horizon Ridge Parkway, Suite 100 Henderson, NV, 89052 (702) 932-0353 info@irelandminerals. com http://www. irelandminerals. com Investor Relations: Terri MacInnis R. Jerry Falkner, CFA Bibicoff + MacInnis, Inc. RJ Falkner & Company, Inc. Tel: 818-379-8500 Tel

Source: SEC EDGAR · 8-K filed Apr 15, 2010

More decks from Ireland Inc