10 slides from Ireland's conference presentation, Dec 8, 2011
Slide 1: Forward Looking Statements
Forward Looking Statements This Presentation may contain, in addition to historical information, forward -looking statements. Statements in this Presentation that are forward -looking statements are subject to various risks and uncertainties concerning the specific factors disclosed under the headin
Slide 2: Why Invest in Ireland?
1. Large Opportunity 2. Growing Opportunity 3. Low Cost Mining Process 4. Near Term Production Expected Why Invest in Ireland? • Large Opportunity – Current focus on North Sand Zone with Inferred Sand Resource of 145 million (MM) tons with an average sample grade of 0.038 ounces per ton gold equival
Slide 3: Management Team
– Gold/Silver leach extraction circuit installed at onsite pilot plant – Currently optimizing pilot plant operating parameters with onsite laboratory testing using caustic fusion analysis and cyanide and thiosulphate leaching Management Team Douglas Birnie – Chief Executive Officer, President and Di
Slide 4: Columbus Project Assets
• Gold and Silver Project • A “dry salt marsh” with drill-indicated zones of surface mineable material • Located between Las Vegas and Reno in the Columbus Basin (Esmeralda County, Nevada) – a region with a proven history of major gold and silver discoveries • Mine site production permit has been gr
Slide 5: 25,498 acres of mineral claims
• 25,498 acres of mineral claims on federal land administered by the BLM (Bureau of Land Management), with an option for an additional 23,440 acres • 378 acres permitted to 40-foot depth for extraction of gold and silver (Permitted Area) - 320 acre mine site, 58 acre mill site - 15,000 sq. ft. mill
Slide 6: Drill Program
Drill Program
Slide 7: Identified Two Mineralized Sand Zones
Identified Two Mineralized Sand Zones. North Sand Zone (0.67 sq miles) contains Inferred Resource of 145 million tons with 0.038 opt AuE to a depth of 200’. South Sand Zone contains Inferred Resource of 29MM tons with average sample grade of 0.037 AuE within the top 100’ Mineralized area is open in
Bulk Extraction Test Results Need to prove extraction process is economically viable as next step of Project Feasibility. Goal: 75% Au recovery. Sand Material Head Ore (HO) Caustic Fusion Cyanide Leach Extraction Thiosulphate Leach Extraction Test Au opt Ag opt Au % Ag % Au % Ag % 3747C 0.082 1.772