Ireland — Investor Presentation (September 2009)
23 slides from Ireland's investor presentation, Sep 24, 2009

Slide 1: Ireland Inc Corporate Presentation
IRELAND INC Corporate Presentation September 2009 Confidential For complete information on Ireland Inc, its projects and risk factors, please review Ireland Inc.’s SEC filings at http://www.sec.gov.

Slide 2: Forward Looking Statements
Forward Looking Statements This Presentation may contain, in addition to historical information, forward-looking statements. Statements in this Presentation that are forward-looking statements are subject to various risks and uncertainties concerning the specific factors disclosed under the heading

Slide 3: Company Vision
Company Vision Build Ireland (IRLD) into a significant mid-tier mining company IRLD has two precious metal projects with significant potential Columbus Project - Acquired 100% Gold / Silver mining rights Option to Expand Red Mountain Project – Option to buy 100% Gold / Tungsten / Silver mining right

Slide 4: Columbus Project - Opportunity
Columbus Project- Opportunity With permits already granted, the Columbus Project will have a short time window to production. Prefeasibility work and drilling programs for the Columbus Project has been ongoing for the past several years and have: Identified an area containing approx. 200 million ton

Slide 5: Overview
Overview Columbus Project Gold and Silver Project A “dry salt marsh” with drill indicated zones of surface mineable material Mine site production permit has been granted Short production horizon Columbus Project Mill-Site Facility 5

Slide 6: Location
Location The Columbus Project is located~ halfway between Las Vegas and Reno, ~42 miles west of Tonopah, Nevada, USA. The Project is specifically located in the Columbus Basin, in Esmeralda County, Nevada– a region with a proven history of major discoveries of gold and silver.

Slide 7: Regional History
Regional History Columbus Project is in a mineralized area : Round Mountain (Gold)* Owned by Barrick and Kinross 20 M oz gold deposit 16 M oz mined (12M oz extracted to 2008) 97% “invisible” gold Head Grade 0.018 opt Au 2008 Production: +/-600k oz Au @125K tpd ore (cyanide) ~ 60 miles from Columbus

Slide 8: Project Assets
Project Assets The Columbus Project consists of : 19,680 acres of mineral claims on federal land administered by the BLM (Bureau of Land Management), with an option for an additional ~22,640 acres. 380 acres permitted to 40 feet for extraction of gold, silver and production of Calcium Carbonate (Zon

Slide 9: Independent Confirmation
Independent Confirmation All reported work to date has been completed and performed by third party engineers/geologists under Chain of Custody(COC) Technical Team – Independent firms: Permitting Lumos & Associates – based in Reno, NV Project Resources McEwen Geological – Drill program management / M

Slide 10: Geology
Geology Aeromagnetic Survey High resolution aeromagnetic survey completed October 2007 Mag Highs = Volcanics surrounding basin Mag Lows = Young sediments in basin and older sediments around basin A large NW-SE fault structure enters basin from the NW and could be main aquifer feed to basin Basin cou

Slide 11: Technical Program
Technical Program 2008 Exploratory Drill Program 39-hole drill program conducted in “Area of Interest” New Gold/Silver Discovery – Large Tonnage Potential Three surface mineable areas: ~1,590 acres Surface up to 200 foot depth ~200MM tons potentially mineable material Sample average 0.041 opt Au equ

Slide 12: Zone B – Mineralized Intercepts
Zone B – Mineralized Intercepts * Au Equivalent calculated at $900/ozAu and $12/oz Ag Mineralized intercepts (identified to Mineralization appears to be Dredge mining method could cost date) average grade of 0.045 opt Au unbounded in all directions effectively mine up to 200 foot depth Equivalent or

Slide 13: Project Prefeasibility
Project Prefeasibility Extraction Leach Test Results Parameter Test Size Au Equivalent % Recovered % Recovered as (lbs) Head Grade (opt) into Solution Metal-in-Hand Zone A – Permitted Mine Area 1,738 0.062 86.6% 69.4% Zone B – Hole (S7B) 2,000 0.070 94.4% 84.1% Zone B – Drill Composite (S1B) 5.5 0.0

Slide 14: Project Pre-Feasibility
Project Pre-Feasibility Process Flow Diagram Estimated Operating Costs (similar to typical Tank Leach Operations) ~ $10/ton Current Production Permits: mine up to 792,000 tpy in Zone A – Permitted Mine Area, a 320-acre area, to a depth of 40 ft. (estimated mine life of over 17 years) 14

Slide 15: 2009 Milestones
2009 Milestones • Completed two ~2,000 -lbs pilot scale leach tests • Extracted Au & Ag with simple direct leach process • Recovered ~70% to 83% of Au and Ag as metal-in-hand • Completed eight bench scale tests (~5.5 lbs) • Extracted Au and Ag to show consistency in extraction • Used to define and r

Slide 16: Project Development- 2009
Project Development- 2009 Determine Increased Project Resources/Reserves • Expand drilled area with 2009 drill program • Calculate increased project resources and reserves • Complete resources/reserves technical report Complete Project Feasibility • Complete additional bench/bulk leach tests to refi

Slide 17: Summary
Summary The Columbus Project represents a solid exploration and production opportunity: Full permit for the extraction of Gold and Silver and the production of Calcium Carbonate “Big Box Store” of mining operations: high volume and low cost Near term production potential 17

Slide 18: Future Opportunity
Future Opportunity Red Mountain Option to acquire 100% by Dec 31, 2011 Longer term exploration project for Gold, Tungsten and Silver Over 25 years of sampling and testing Red Mountain,CA 137 miles northeast of Los Angeles 18

Slide 19: Financial Information
Financial Information 19

Slide 20: Capitalization and Finances
Capitalization and Finances Capitalization (06/30/2009) Issued and Outstanding 97,010,087 Free Float ~39,324,629 Total Fully Diluted 116,365,796 Market Capitalization (current) ~$40 M Finances Cash (06/30/09) $723,000 Long-Term Debt Financing $0 Stockholders Equity (06/30/09) $28,178,000 Burn Rate ~

Slide 21: Expenses
Expenses Cash Expenses Budget (08/01/09 – 09/30/10) Columbus Project Property Payments $ 80,000 Drilling and Analysis 1,060,000 Pilot Plant / Project Feasibility 1,900,000 Permitting 30,000 Prod. Plant Engineering 1,250,000 Columbus Project Sub-Total 4,320,000 Red Mountain Project 110,000 General an

Slide 22: Ireland Inc. Overall Summary
Ireland Inc. Overall Summary Exploration company with goal of production Two projects with significant potential Columbus: Gold/Silver Red Mountain: Gold/Tungsten/Silver Good Fundamentals Assembled Talented Technical Team Strong Mineral / Metal Prices 22

Slide 23: Ireland Inc.
Ireland Inc. Corporate Office: 2441 West Horizon Ridge Parkway, Suite 100 Henderson, NV, 89052 (702) 932-0353 [email protected] http://www.irelandminerals.com Investor Relations Contacts: R. Jerry Falkner, CFA Terri MacInnis RJ Falkner & Company, Inc. Bibicoff + MacInnis, Inc. Tel: 800-377-98
Source: SEC EDGAR · 8-K filed Sep 24, 2009
More decks from Ireland Inc
Corporate Update (November 2012)18 slides · Nov 29, 2012
LD Micro Conference (December 2011)10 slides · Dec 8, 2011
Rodman & Renshaw Conference September 201121 slides · Sep 9, 2011
Sidoti Micro Cap Conference June 201021 slides · Jun 30, 2010
Chicago Resource Expo April 201021 slides · Apr 21, 2010
Investor Presentation (April 2010)21 slides · Apr 15, 2010