Auger Results Extend Gold Corridor of Kollo Gold Project
Filed with ASX · · 10 pages · English
Gold explorer Vital Metals Limited (ASX: VML) is pleased to announce the latest results from an auger drilling program from its 100%-owned Kollo Gold Project in Burkina Faso, West Africa. The permits are located on the highly prospective Markoye Fault Corridor which also hosts West African Resources’ high grade 2.2Moz Sanbrado Gold Project. Commenting on the auger results, Vitals’ Managing Directo
Story so far
Earlier from Vital Metals
- $5M raised to accelerate gold exploration in Burkina Faso
- Auger drilling results in Burkina Faso exceed expectations
- Vital hits wide high-grade gold zone at Kollo
- Vital hits more gold in RC drilling at Elephant Creek
- Drilling Update
Later from Vital Metals
- Commencement of Drilling at Kollo Gold Project, Burkina Faso
- Director Appointment and Market Update
- 17m at 6.0g/t Au incl. 2m at 30.5g/t Au at Kollo South
- 13m at 9 g/t Au including 2m at 46 g/t Au from 174m at Kollo
- Shallow high grade intercepts at Boungou South
Follow Vital Metals into a list and get an email when it puts out news.
Follow Vital Metals