13m at 9 g/t Au including 2m at 46 g/t Au from 174m at Kollo
Filed with ASX · · 15 pages · English
Ø High-grade thick gold mineralisation now extended over 100m on the contact of an intensely sheared graphitic marker unit that strikes at least 400m in an eastwest orientation Ø Mineralisation remains open at depth with drilling in progress to test depth and strike extensions KRC 353 was drilled to extend the strike length from previous results including: Ø KRC352: 17m at 6.0 g/t Au from 114m inc
Story so far
Earlier from Vital Metals
- 17m at 6.0g/t Au incl. 2m at 30.5g/t Au at Kollo South
- Director Appointment and Market Update
- Commencement of Drilling at Kollo Gold Project, Burkina Faso
- Auger Results Extend Gold Corridor of Kollo Gold Project
- $5M raised to accelerate gold exploration in Burkina Faso
Later from Vital Metals
- Shallow high grade intercepts at Boungou South
- New Gold and Zinc Targets
- Watershed Tungsten Project Optimisation Studies Boost Value
- $2m Raised to Progress Watershed Tungsten Project
- Vital Grows West African Portfolio
Follow Vital Metals into a list and get an email when it puts out news.
Follow Vital Metals