VHM Metallurgical Results and Drilling Commencement
Filed with ASX · · 25 pages · English
o Total Heavy Mineral (“THM”) grade of 11.1% in upper mineralised zone of Area 4 (2.8 times higher in THM grade compared to Goschen Project Ore Reserve average THM grade of 4%) o Mineralisation is amenable for processing through the flowsheet proposed for the Goschen Project o High value zircon and titania products, are consistent with previous Area 1 testwork outcomes • Drilling to commence at th
Earlier from VHM
Later from VHM
- Goschen Project DFS Refresh
- Presentation - Goschen Project DFS Refresh
- Cannie Interim Drilling Results
- New Cannie Critical Mineral Project
- Pilot Hydromet Plant Delivers Exceptional Recoveries of MREC
Follow VHM into a list and get an email when it puts out news.
Follow VHM