Significant Mineral Resource Estimate upgrade at Si2
Filed with ASX · · 43 pages · English
Summary by 6ix AI
The updated estimate now categorizes a majority of the resource as Measured, highlighting the project's potential for long-term, low-strip mining operations. This upgrade will serve as the geological foundation for the ongoing Pre-Feasibility Study, which is nearing completion. The announcement emphasizes the project's alignment with growing global demand for high-purity silica, particularly for photovoltaic glass used in solar panels.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Diatreme Resources Limited on 6ix
Story so far
Earlier from Diatreme Resources
- Sale of CFS to DRX/Sibelco Silica J/V
- Favourable Si2, Casuarina drilling boosts silica pipeline
- Cyclone metallurgical testwork shows project upside
- Quarterly Activities/Appendix 5B Cash Flow Report
- NSP Draft EIS Submitted to Office of Coordinator-General
Later from Diatreme Resources
- Completion of Sale of CFS to DRX/Sibelco Silica J/V
- Maiden Mineral Resource Estimate at Casuarina Deposit
- Sibelco injects $4.4M in boost for silica sand joint venture
- PFS confirms NSP potential as new FNQ silica sand mine
Follow Diatreme Resources into a list and get an email when it puts out news.
Follow Diatreme Resources