Quarterly Activities and Cashflow Reports 31 March 2019
Filed with ASX · · 21 pages · English
Story so far
Earlier from Winchester Energy
- Frack Completed at White Hat 39-1L, Permian Basin, Texas
- Update- Testing of the Strawn Sand, White Hat 20-3
- Testing of the Strawn Sand, White Hat 20-3, Mustang Prospect
- Oil Shows Observed in Ellenburger Formation, White Hat 20-3
- Wireline Logs Confirm Oil Pay in Strawn Sand, White Hat 20-3
Later from Winchester Energy
- Operations Update
- White Hat 20-3 Produces 306 BOPD, Mustang Prospect
- New Well to Spud at Mustang Prospect, Permian Basin, Texas
- Mustang Prospect Development, Permian Basin, Texas
- Oil and Gas Production, successful frack, Thomas 119-1H
Follow Winchester Energy into a list and get an email when it puts out news.
Follow Winchester Energy