POSCO Approves Agreement for DLE Demo Plant at Green River
Filed with ASX · · 4 pages · English
Summary by 6ix AI
POSCO will lead the project, covering all costs related to the design, construction, and operation of the plant, while Anson will provide access to necessary resources. The agreement includes a facilitation fee to Anson and aims to validate POSCO's proprietary technology for lithium extraction from brines.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Anson Resources Limited on 6ix
Story so far
Earlier from Anson Resources
- A1 Lithium Admitted to US Defense Industrial Base Consortium
- Anson Upgrades Green River JORC Resource Estimate by 650%
- Updated Notice of Intent for Small Mining Operations for GR
- Diamond Core Records Higher Effective Porosity at GR
- Drilling Fluid from Mt Fuel-Skyline Tested Significant Li
Later from Anson Resources
- Anson Resources Engineering Study Confirms Green River as a Future Low-Cost Producer
- Engineering Study Confirms Green River as Low-Cost Producer
- Anson and POSCO Sign Binding Agreement for DLE Demo Plant
- Appoints Baker Hughes to Complete Green River Engineering
- Secures Strong Support from US Congress Reps for DoE Grants
Follow Anson Resources into a list and get an email when it puts out news.
Follow Anson Resources