PFS workstreams determine Optimal Development Configuration
Filed with ASX · · 8 pages · English
Summary by 6ix AI
Antipa Minerals Limited has released an update on the Pre-Feasibility Study for its Minyari Dome Gold-Copper Development Project, detailing the completion of key technical workstreams and option studies to determine the optimal development configuration. The studies assessed various processing flowsheets and mining sequences to maximize project value and efficiency, with the preferred option now selected. The finalization of operating and capital costs for the selected processing configuration is underway, with the PFS report expected to be released in the near future.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Antipa Minerals Limited on 6ix
Earlier from Antipa Minerals
- Tims Dome Gold-Copper Mineralisation intersected over 2.2km
- Gold-Copper Mineralisation extended at Tims Dome AEM Target
- Phase 1 Drilling strengthens Telfer-style Reef Target
- Phase 1 Drill Results Extend Gold Mineralisation at Fiama
- PFS Test-work Confirms Gold-Copper Processing (Amended)
Later from Antipa Minerals
- Quarterly Activities/Appendix 5B Cash Flow Report
- Thick High-Grade Gold intercepts returned at Minyari Deposit
Follow Antipa Minerals into a list and get an email when it puts out news.
Follow Antipa Minerals