NorNickel GMKRUS: GMKN

Nornickel launches five unique wells at the Pelyatka gas field

· Issued by NorNickel GMK

Summary by 6ix AI

Norilskgazprom, part of the Nornickel Group, has drilled and commissioned five new production wells at the Pelyatka gas condensate field in Taimyr. Nornickel says it is the first large-scale project at the field in the past 10 years and is designed to meet the growing needs of its Norilsk operations and the social infrastructure of Norilsk and Dudinka.

Key details

  • The new wells raised the field's operating well stock from 41 to 46 and added total production capacity of 2 million cubic meters of gas per day.
  • According to Nornickel, the field, 170 km northwest of Dudinka, is the main source of gas for the Norilsk Industrial District and supplies 80% of all gas output in Taimyr.
  • The company's investment in the project totaled 10 billion rubles.
  • Norilskgazprom drilled the first three wells in 2024 and the other two in the first half of 2025. In 2026 all five were connected to the field's existing infrastructure, including pipelines to the existing gas gathering line.
  • The five wells have a total drilling length of more than 15 kilometers. Two have horizontal sections longer than 600 meters, which the company says is a record for the field.

6ix AI wrote this summary from the release below and checked it against the release.

Norilskgazprom (part of the Nornickel Group) has drilled and commissioned five new production wells at the Pelyatka gas condensate field. This is the first large-scale project at Taimyr's key gas asset in the past 10 years, designed to meet the growing needs of the company's Norilsk operations as well as the social infrastructure of Norilsk and Dudinka.

The Pelyatka field, located 170 km northwest of Dudinka, is the main source of gas for the Norilsk Industrial District, supplying 80% of all "blue fuel" output in Taimyr. Bringing the new wells online increased the field's operating well stock from 41 to 46 units. The additional total production capacity amounted to 2 million cubic meters of gas per day.

01 / 03
01 / 03

Evgeny Fedorov, First Vice President - Chief Operating Officer of Nornickel, commented: "We managed to complete this project on time and within the targeted parameters in terms of confirmed production volumes. The five new wells will let us supply the gas volumes needed both for growing metallurgical production capacity and for new mining development projects, including the construction of the third production line at the Talnakh Concentrator. We will also be able to guarantee gas supply to the social infrastructure of Norilsk and Dudinka - this is one of our key priorities."

The design of the new wells accounts for the field's complex geological structure. The total drilling length of all five wells exceeded 15 kilometers. Two of them, with horizontal well completions, have horizontal sections longer than 600 meters - a record for the Pelyatka field, enabling maximum gas inflow rates.

The wells were drilled using a Russian-made 1,200-ton wheel-mounted rig, comparable in height to a 20-story building. It moved along guide rails, like a train, from well to well fully assembled with drill pipes.

Norilskgazprom drilled the first three wells in 2024, and the remaining two in the first half of 2025. In 2026, all five wells were connected to the field's existing infrastructure: piping was installed, pipe racks and service platforms were built, and pipelines were laid to the tie-in point on the existing gas gathering line. The company's investment in the project totaled 10 billion rubles.

NorNickel GMK on 6ix

Earlier from NorNickel GMK

Later from NorNickel GMK

All NorNickel GMK news releases