Mt Cannindah Hole 6 81m at 1.31 % CuEq,
Filed with ASX · · 33 pages · English
• A copper oxide zone 16m @ 0.45% Cu from surface 0m-16m. • Primary Gold Zone (sulphide): 11m @ 1.11% Cu, 1.04g/t Au ,21g/t Ag from 46m to 57m • Total mineralised intercept from hole 6 including above results and primary zone aggregates to 81m @ 0.83% Cu, 0.36g/t Au, 32.2 g/t Ag converts to 1.31 % Copper Equivalent. • Drilling of CAE hole #6 confirmed the continuity of high grade copper-gold-silve
Cannindah Resources Limited on 6ix
Story so far
Earlier from Cannindah Resources
- CAE Quarterly Activities Report
- Appendix 5B Quarterly Cashflow Report
- Mt Cannindah Returns High Grade Cu in Hole 4
- Near Surface High Grade Cu in Hole 4
- Impressive gold results from lower section of hole 3
Later from Cannindah Resources
- Mt Cannindah project continues to impress Holes 7 and 8
- CAE Executes Placement Agreement
- Hole 9 Assay Results 400m @ 0.91% CuEq
- Exceptional Width and Grade at Hole 10
- Hole 11 Delivers Exceptional Width and Grade of Cu and AU
Follow Cannindah Resources into a list and get an email when it puts out news.
Follow Cannindah Resources