Initial MRE of 4.5Moz AuEq at El Guayabo Project, Ecuador
Filed with ASX · · 78 pages · English
1 ▪ Initial Inferred Mineral Resource Estimate (MRE) of 270 mt at 0.52 g/t AuEq1 for 4.5 Moz AuEq at CEL's 100% owned El Guayabo Project in Ecuador (refer Table 1). ▪ The 4.5 Moz1 MRE contains a significant higher-grade core of mineralisation (refer Table 2): ▪ 1.45 Moz at 1.0 g/t AuEq1 (0.65 g/t AuEq cut-off) including; ▪ 1.01 Moz at 1.2 g/t AuEq1 (0.8 g/t AuEq cut-off)) including; ▪ 0.63 Moz at
Challenger Gold Limited on 6ix
Story so far
Earlier from Challenger Gold
- Continued Drilling Success at El Guayabo - Ecuador
- CEL Signs MOU for Renewable Energy to Power Hualilan
- Regional Exploration - High Grade Gold 10km from Hualilan
- Latest Results for Ecuador Yield 1.2 Kilometre Intersection
- Upgraded MRE of 1.6Moz at 5g/t AuEq within 2.8Moz AuEq
Later from Challenger Gold
- Hualilan Regional Exploration Identifies Additional Targets
- Met Testing Opens Door to Simplify Hualilan Flowsheet
- Potential to Increase High-Grade Core of El Guayabo MRE
- Challenger Commences Trading on the OTCQB Venture Market
- Challenger Gold announces company is now trading on the OTCQB with ticker CLLEF
Follow Challenger Gold into a list and get an email when it puts out news.
Follow Challenger Gold