Green River Advances with Successful Downstream Test Work
Filed with ASX · · 5 pages · English
Summary by 6ix AI
This test work validates the proposed process flowsheet and has exceeded original design expectations, marking a critical milestone in the project's development. The integrated downstream processing strategy aims to produce high-purity battery-grade lithium carbonate for the electric vehicle market.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Anson Resources Limited on 6ix
Earlier from Anson Resources
- Anson to Conduct Western Block Exploration at Yellow Cat
- Anson Seeks to Increase the Mineral Rights at Green River
- First Tranche Payment from POSCO Holdings
- Anson Applies for Additional SITLA Mineral Rights
- Approval for Small Scale Mining Operation Application at GR
Later from Anson Resources
- Anson Wins Bid for FFSL Mineral Rights at Green River
- Utah Backs Green River with Potential US$357.7 M Incentive
- Yellow Cat Drilling Confirms Mineralisation Along Strike
- Anson Exceeds EV Battery Grade Lithium Carbonate Standard
- Anson Applies for Patents for Removal of Fe in Li Rich Brine
Follow Anson Resources into a list and get an email when it puts out news.
Follow Anson Resources