Gold System Expands in NE North Pipe at Colosseum
Filed with ASX · · 14 pages · English
• Diamond hole CM25-41 returns 149.65m @ 1.39 g/t Au from surface, including 55.2m @ 2.83 g/t Au, confirming high-grade gold in the North Pipe northeast extension. • Hole ended in mineralisation (~1 g/t Au), confirming the system remains open at depth. • Results build on wide RC intercepts including RC25-035: 295.64m @ 1.04 g/t Au and RC25- 034: 297.17m @ 0.68 g/t Au reported previously, demonstra
Dateline Resources Limited on 6ix
Story so far
Earlier from Dateline Resources
- Geophysics Converge Ahead of Colosseum Deeper Drill Program
- Quarterly Activities/Appendix 5B Cash Flow Report
- IP Survey Completed Ahead of Diamond Drilling
- Rare Earth Targets Refined as IP, MT, Radiometric and Geological Data Converge at Colosseum Project
- Dateline Resources Completes $35M Institutional Placement to Expand Drilling and Advance Colosseum Towards Production
Later from Dateline Resources
- Diamond Drilling Confirms Wide Gold Intercept in Northeast Extension of North Pipe at Colosseum
- Geophysics Points to Large Intact Carbonatite Targets
- Colosseum Geophysics Points to Large Intact Carbonatite Targets
- Dateline Acquires U.S. High-Grade Heavy Rare Earths Project
- Dateline Commences Music Valley Exploration Program
Follow Dateline Resources into a list and get an email when it puts out news.
Follow Dateline Resources