Winchester Energy Ltd has released a press release.
First oil produced from newly acquired Group Prospect
Filed with ASX ·
6ix hasn’t read this filing yet.
Story so far
Earlier from Winchester Energy
- Oil production to rise sharply as new projects come online
- Permit received to commence operations at Varn Oil Field
- Farm-in to fast-track increased oil production
- White Hat 2106 Oil Production up 36% after Workover
- Gross revenue of AUD$1.25M for March 2022
Later from Winchester Energy
- 2nd Group Prospect Workover Produces Oil and Significant Gas
- Drilling commences at Varn Oil Field
- Deep Drilling commences at Varn Oil Field
- Third Group Prospect Well Flows Oil
- First of three Group Prospect wells connected to sales
Follow Winchester Energy into a list and get an email when it puts out news.
Follow Winchester Energy