Drilling confirms south-east extension to Tabakorole
Filed with ASX · · 9 pages · English
Hole 21TBKRC-001 intersected23m at 2.0 g/t goldfrom 178m and terminated in mineralisation. This hole is 150m to the south-east of previous resource drilling. Results from the two other holes on the same section remain outstanding. Other significant intercepts from recently completed drilling within the Tabakorole deposit’s existing strike length include: 24m at 1.2 g/t goldfrom 13m (hole 20T
Story so far
Earlier from Marvel Gold
- Marvel Assessing Options for Chilalo Graphite Project
- Mali Exploration Update
- Marvel finalises acquisition of South Mali Gold Projects
- Commencement of resource expansion drilling at Tabakorole
- $5.7M Capital Raising to Accelerate Exploration Program
Later from Marvel Gold
- Drilling results expected to upgrade Tabakorole resource
- Positive drill results continue at Tabakorole
- Drilling confirms further strike extensions at Tabakorole
- Marvel to spin out and IPO Chilalo Graphite Project
- Soils highlight numerous drill ready targets Tabakorole
Follow Marvel Gold into a list and get an email when it puts out news.
Follow Marvel Gold