Central Puerto SABCBA: CEPU

Investor presentation (CEPU 3Q26 Investor Presentation 1)

· Issued by Central Puerto SA
Investor Presentation

November 2026

Who we are

Established in 1992 as a privately owned company, Central Puerto (CEPU) is today the largest electricity generation company in Argentina, with 6,933 MW of installed capacity diversified across thermal and renewable technologies. We own and operate 16 generation plants strategically located throughout the country.

100% of our shares are publicly listed, both on the Buenos Aires Stock Exchange (BYMA), under the regulatory framework of the Argentine Securities and Exchange Commission (CNV), and on the New York Stock Exchange (NYSE), under U.S. SEC regulations, since February 2018. Our ticker is "CEPU".¹

Our key differentiator is our long-standing track record as Argentina's leading pure-play power generation company, combining unmatched scale, the country's largest generation market share, strong corporate governance as a dual-listed public company, and a robust capital structure. These strengths are reflected in our financial policies and underpin our strong credit profile and overall financial quality.

In 2026, we further strengthened and diversified our platform. We secured an additional 30-year concession for the Piedra del Águila hydroelectric asset, added the Brigadier López combined-cycle plant, and advanced the development of 205 MW of battery energy storage systems (BESS). We also expanded into Oil & Gas, securing a franchise to potentially develop resources in Vaca Muerta following a disciplined de-risking program, with development expected to commence in 2027.

Our strong operating performance, disciplined execution and robust financial position are the foundation of our competitive advantage. Together, they reinforce our long-term leadership in Argentina's energy market while providing a platform for sustainable growth and attractive risk-adjusted returns for our shareholders.

Our value proposition

Assess strategic optionality with flexibility, low exposure and potential high return.

Leadership

Sustain market leadership and seize the evolving economic landscape by adding

value-generating projects.

Disciplined growth

Maintain liquidity, strong free cash flow generation, and a net leverage ratio that allows us to grow while upholding resiliency.

Financial strength

Drive balanced return in a sustainable business model.

Investor return

3

(1) Our common shares are listed on the BYMA under the symbol "CEPU". During 2025, the volume traded on the BYMA amounted to 308,113,408 shares. The total number of shares subscribed and integrated on December 31, 2025, was 1,513,770,222, of which 100% were listed and available to trade on the Buenos Ares Stock Exchange. Since February 2018, our ADSs representing our common shares began to trade on the NYSE under the symbol "CEPU". In 2025, the volume of ADRs traded on the NYSE amounted to 85,605,051, equivalent to 856,050,510 common shares. Consequently, the total trading volume of our common shares during 2025 was 1,164,163,459.

Photo: Corporate headquarters.

Central Puerto at a glance

Generation 2025

18,603

GWh

Generation 3Q26 LTM

18,994

GWh

Revenues 2025

US$ 752 MM

Revenues 3Q26 LTM

US$ 1,412 MM

Includes Spot self-procured fuel.

Adj. EBITDA 2025

Adj. EBITDA 3Q26 LTM

US$ 323.7 US$ 480.3 MM MM

Capex 2025

Capex 3Q26 LTM

US$ 202.0 US$ 458.6 MM MM

Net financial leverage ratio 2025

0.30x

Net financial leverage ratio 3Q26 LTM

0.72x

Other business

Forestal Argentina

+160,000 ha in 8 fields

Interest in

FONINVEMEM

assets +2,500 MW CCs.

3C Lithium Pte. Ltd

We hold 35% stake

3

4

Piedra del Águila: 30-year concession retained

Awarded with a US$ 245 MM bid (fee paid in January 2026) and US$-denominated revenues.

Recent developments

BESS: 205 MW nearing commercial operation

Construction at 87% (Costanera) and 81% (Nuevo Puerto); 82% of project CAPEX executed. COD before year-end (Costanera) and January 2027 (Puerto), adding US$ 25-27 MM to 2027 Adj. EBITDA.

Oil & Gas: expanding in Vaca Muerta

Aguada del Chivato-Aguada Bocarey blocks acquired in April 2026. Corralera Noroeste block awarded in Neuquén's tender, with a US$ 78.7 MM exploratory investment commitment.

AbraSilver: minority stake sold

Sold for C$ 228.4 MM vs. a C$ 35.7 MM cost basis, a C$ 192.7 MM gain. Extraordinary cash dividend of AR$ 164.00 per share approved (payment date: Sept. 2026).

Pluspetrol: direct natural gas supply

First non-integrated companies in the sector to withdraw Plan Gas volumes from the centralized CAMMESA framework.

5

Power Generation & Operating Performance

13.6%

of total SADI generation in 3Q26

Generation volume

+5.6%

y/y

-5.2%

q/q

(in GWh)

409

578

4,453

5,056

4,791

469

3Q26

1,973

1,231

1,118

CEPU installed capacity remained stable in 3Q26

(in MW)

432

1,067

2,000

1,466

2,372

1,185

Spot thermal 51.0%

Contracted thermal

Hydro

Renewables

20.0%

20.8%

8.2%

3Q25 2Q26

Thermal availability

Renewables Hydro

Contracted thermal

Spot thermal

Total thermal* 85.3%

Combined cycles* 93.0%

ST / GT 72.0%

q/q generation volume drivers:

(-)

Central Puerto -32.0%

Central Costanera -14.4%

due to scheduled maintenance

at some plants' assets.

(+)

Piedra del Águila +4.8% Brigadier López +21.5%

San Lorenzo +20.5%

*Excludes Luján de Cuyo maintenance

3

6

Source: CAMMESA

Thermal availability is calculated as a weighted average of the declared availability to CAMMESA in the period. Market share excludes FONI plants volumes. Market share was 15.9% including FONI plants at WI.

Volumes refer to energy generated by all of the company's operating assets are based on CAMMESA's "Síntesis Mensual" publicly available files, which may be revised by CAMMESA in subsequent monthly reports. Accordingly, Central Puerto volumes originally reported for 1Q26 as 5,420 GWh and 2Q26 as 5,250 GWh have been restated to 5,185 GWh and 5,055 GWh, respectively. 3Q26 volumes may likewise be restated in future reports.

Delivering results through the years

Central Puerto's historical performance

Revenues (US$ MM)

(Revenue mix by type of sale)

Adjusted EBITDA (US$ MM)

and annual outstanding FONI credit collections

271.0

211.0

301.0

224.0

223.0

267.0

271.0

324.0

392.6

319.7

541.2

636.3

73.0

316.9

69.0

376.3

66.0

276.8

74.0

288.0

54.2

337.2

4433..44

451.0

1,620

5,174

2021 2022 2023 2024 2025 9M26

2021 2022 2023 2024 2025 9M26

Annual capex (US$ MM) Generation volumes (GWh/year)

1,568

2,565

463

4,849

458.6

14,419

1,610

3,283

1,775

17,484

20,773 21,605

4,348

2,359

9,284

3,839

18,598

1,926

2,683

7,040

3,468

2,646

1,422

15,280

67.4

176.4

78.6

159.7

202.4

4,979

5,525

2,087

3,185

8,690

2,105

2,900

7,825

3,264

4,973

2021 2022 2023 2024 2025 9M26

2021 2022 2023 2024 2025 9M26

Spot thermal ST/GT Spot thermal CC Thermal PPA

Hydro

Renewables

Adjusted EBITDA = Net income + Income tax expenses + Financial results, net + Depreciation and amortization − Non-recurring operating results.

(1) FONINVEMEM collections are monthly proceeds from an outstanding commercial credit with CAMMESA. 7

Availability rates of thermal units(1)

Combined Cycles (%)

91%

88%

92%

68%

79%

92%

58%

86% 86%

96%

93%

79%

90%

100%

94%

84%

91%

99% 99% 96%

90%

44%

Since 2023

Central Puerto complex Central Costanera complex Lujan de Cuyo San Lorenzo

2021

2022

2023

2024

2025

2026 9M

Steam & Gas turbines (%)

86%

70%

75% 76% 72%

67%

Since 2023

29%

44%

58%

65%

96% 95% 93% 97%

Central Puerto complex

Central Costanera complex

Brigadier Lopez

  1. Availability reported by CAMMESA, based on the total installed capacity of each power

    plant. 8

    Consistent growth of insta led capacity

    Installed capacity growth (in MW)

    (1992-2000)

    Central Puerto & Puerto Nuevo ⁽¹⁾

    (1994) Piedra del Águila ⁽²⁾

    (2017)

    Luján de Cuyo thermal facility + mini hydro.

    3,948

    (2018)

    Luján de Cuyo CC (+95 MW)

    (2019)

    Brigadier Lopez (291 MW)

    Wind farms: La Castellana I, La Castellana II, La Genoveva II, Achiras (206 MW).

    4,250

    (2020)

    Wind farms: La Genoveva I, Manque, Los Olivos (total 168 MW).

    (2021)

    San Lorenzo (391 MW)

    4,809

    (2023)

    Central Costanera (1,789 MW)

    Guañizuil II solar farm (100 MW)

    6,698

    374

    1,440

    967

    1,926

    1,891

    100

    (2025)

    Closing of B. Lopez CC (140 MW)

    San Carlos (15 MW)

    Cafayate (80 MW)

    6,933

    2025

    Installed capacity breakdown by

    technology mix and revenue model:

    6,933 MW

    21%

    8%

    20%

    23%

    28%

    7 wind &

    3 solar farms

71% thermal

in 5 plants

Spot ST/GT Thermal Spot CC Thermal

195

374

1,440

1,388

1,926

1,610

374

1,440

576

798

1,621

206

1,440

576

798

1,230

1,440

480

798

1,230

PPA Thermal

Spot Hydro

PPA Renewables

Thermal spot ST/GT

Thermal spot CC Thermal PPA Hydro spot

Wind PPA

Solar PPA

9

  1. Our Nuevo Puerto and Puerto Nuevo thermal generation plants are equipped with five steam turbine-generator units in the aggregate and have an installed capacity of 360 MW and 589 MW, respectively. The third plant, the Puerto combined cycle plant has two gas turbines, two heat recovery steam generators and a steam turbine, and it has a total installed capacity of 798 MW. Total installed capacity of 1,747 MW.

  2. In January 2026, Central Puerto was awarded Piedra del Aguila concession extension, until 2056.

Leading portfolio, consistent growth

# Plant Technology MW Location (province) CEPU op. date Spot, contracts & PPA exp. date

Asset overview · geographic footprint

15 · 16

11

5 · 6

4

12-14

1 · 2

7-10

3

Thermal Hydro Wind

Solar

1

Central Costanera

Thermal (2 CC + 4 ST)

1,789

City of Buenos Aires

Feb. 23

Spot Res. 400/25 / Contracts

2

Central Puerto

Thermal (1 CC + 5 ST)

1,747

City of Buenos Aires

1992 & 2000

Spot Res. 400/25 / Contracts

3

Piedra del Águila

Hydro

1,440

Río Negro

1994

Spot Comahue terms / Contracts

4

Luján de Cuyo

Thermal

576

Mendoza

2019

PPA 2034 / Spot

5

San Lorenzo

Thermal

391

Santa Fe

2021

PPA 2035

6

Brigadier López

Thermal CC

421

Santa Fe

2019 & 2026

PPA 2035 / Spot

7

Genoveva I

Wind

88.2

Buenos Aires

2020

PPA RenovAr

8

Genoveva II

Wind

41.8

Buenos Aires

2020

MATER contracts

9

La Castellana I

Wind

100.8

Buenos Aires

2019

PPA RenovAr

10

La Castellana II

Wind

15.2

Buenos Aires

2020

MATER contracts

11

Guañizuil II

Solar

100

San Juan

Oct. 23

PPA RenovAr

12

Manque

Wind

57

Córdoba

2020

MATER contracts

13

Achiras I

Wind

48

Córdoba

2020

PPA RenovAr

14

Los Olivos

Wind

22.8

Córdoba

2020

MATER contracts

15

San Carlos

Solar

15

Salta

2025

MATER contracts

16

Cafayate

Solar

80

Salta

Aug. 25

PPA RenovAr

16 plants

6,933

MW installed

10

(1) Nuevo Puerto and Puerto Nuevo thermal plants have five steam turbine-generator units in the aggregate (360 MW and 589 MW, respectively). The third plant, Puerto combined cycle, has two gas turbines, two heat recovery steam generators and a steam turbine (798 MW). Total installed capacity of 1,747 MW. (2) In January 2026, Central Puerto was awarded the Piedra del Águila concession extension, until 2056. (3) Regime by plant per the portfolio table: PPA includes RenovAr and thermal PPAs (some with spot exposure); MATER = renewables under MATER contracts; MAT = thermal spot plants under Res. 400/25 with term-contract optionality; Spot = hydro (Comahue terms).

2026 Capex plan

& 205 MW BESS projects progress

3Q26 total CAPEX US$ 36.7 MM

BESS execution milestones achieved

YTD 2026 total CAPEX US$ 458.6 MM(1)

YTD 2026 total CAPEX

9 months (in US$ MM)

245.0

55.3

108.9

49.4

Piedra del Aguila concession Oil & Gas BESS Maintenance & other

Central Costanera BESS project

55 MW. Lithium (LFP). Contemporary Amperex Technology Co., Limited (CATL)

Offtaker: Edesur

Revenues:

10,161 US$/MW-month per hour (RTE up to 5 hours).

10 US$/MWh variable (energy discharged). Energy fuel cost 20 US$/MWh (approx. 15%).

Central Puerto BESS project

150 MW. Lithium (LFP). Contemporary Amperex Technology Co., Limited (CATL)

Offtaker: Edenor

Revenues:

11,147 US$/MW-month per hour (RTE up to 5 hours).

10 US$/MWh variable (energy discharged). Energy fuel cost 20 US$/MWh (approx. 15%)

Contract details:

Contract term: 15 years.

Estimated capex: US$ 130-140 MM (both projects).

Energy nominated and supplied by CAMMESA (at no additional cost and with no energy price arbitrage).

BESS project update

Construction progress: 81% (Nuevo Puerto) and 87% (Central Costanera).

82% of project CAPEX executed.

Commercial operation expected before year end for BESS Costanera and January 2027 for BESS Puerto.

Expected total contribution to consolidated Adj. EBITDA 2027 US$ 25-27 MM.

11

Strong balance sheet and financial flexibility

3Q26 Financing Developments

Financial debt maturity profile and ratios

337.8

Financial debt maturity profile As of September 30, 2026

Category/ Instrument

Action/ Event

Amount (USD)

Execution / Maturity date

Comments

Class E

New Issuance

US$94.3 MM

July 27, 2026

3-yr bullet, 5.5% p.a., semi-annual

IFC Loan

2nd Disbursement

US$117.0 MM

August 12, 2026

Funding for debt prepayments

Achiras (IFC & IADB)

Full prepayment

US$22.8 MM

August 18, 2026

Project Finance debt

La Castellana (IFC & IADB)

Full prepayment

US$43.3 MM

August 18, 2026

Project Finance debt

La Genoveva I (IFC)

Full prepayment

US$52.9 MM

August 18, 2026

Project Finance debt

Class F

New Issuance

US$50.0 MM

October 6, 2026

3-yr bullet (2029), 6.00% p.a., semi-annual

Galicia Bridge Loan

Extension

US$69.9 MM

October 27, 2026

Extended to Nov25, 2026.

(in US$ MM)

220.2 219.0

82.8

14.3

36.9

62.2

46.2

Cash & eq. 4Q2026 2027 2028 2029 2030 2031 >2032

Local Notes

Corporate Loan

Project finance

Financial ratios as of September 30, 2026 (US$ MM)

Total outstanding financial debt

681.5

Cash & cash equivalent and financial current assets

337.8

Financial debt net from cash (Net debt)

343.7

3Q 2026 LTM Adj. EBITDA

480.3

Net Leverage ratio

0.72 x

FONINVEMEM 3Q26 collections from CAMMESA

In 3Q26 were US$ 11.4 MM & credit outstanding balance of US$ 85.7 MM.

3

12

Power market normalization initiated

Resolution 400/25 (Oct 21, 2025) outlined a gradual roadmap liberalizing Argentina's Wholesale Electricity Market (WEM), and progressively reintroduced value creation, contracts and competitive dynamics.

ENERGY FORMULA

Hourly remuneration = CVP + RMA

RMA = CVP + (CMOh × node loss factor - CVP) × FRA × FRC · CVP published by CAMMESA biweekly RMA (US$/MWh): 2 if CVP < 60; 7 if CVP ≥ 60 · FRA = 0 without own fuel management

P50 2026 hourly marginal cost (CMOh) averages ~US$55.5/MWh vs. ~68.7 (2025), 67.1 (2024)

CAPACITY FORMULA

PPAD × KP × capacity remuneration hours + reliability reserve

KP: gas-only 1.1 winter/summer, 0.9 other · dual-fuel 1.5 winter/summer, 1.0 other

Theoretical average (US$/MW-month): gas-only 5,680 · dual-fuel 6,850 · new dual-fuel 14,850 · dual-fuel + Res. 294/94 (ST, GT) 8,100

Resolution 400/25 key aspects

Contract market optionality for spot thermal: Thermal generators gain significant flexibility to add contracts in the new Thermal Term Market (MAT) for up to 20% of their production to Large Users (GUDIs) and the remaining up to 100% to Distribution Companies (Distcos) or the spot market.

Spot remuneration restored: The new spot remuneration mechanism establishes a margin on top of Variable Production Costs (CVP), supporting long-term value creation for generators.

US$-denominated revenues, reducing currency and inflation risk.

Fuel management: The responsibility for fuel management is transferred from CAMMESA to generators. In the transition, existing Plan Gas remains until 2028.

Phased Implementation: The transition will be managed through a phased approach. Importantly, all existing power contracts will remain in force until their natural expiration, ensuring market continuity and stability during the shift.

CEPU Check list

Allowed capacity and energy for B2B nearly fully contracted plus Distcos sales, positioned CEPU as top MAT player.

Added natural gas transportation firm capacity from TGS

Procured LNG and liquids in 1H 2Q26.

ENERGY (SPOT)

Nov 2025

2026

15%

2025-2026

2027

25%

2027

2028

2029

35%

from 2028

2030

New generation (commercial operation from 1/1/2025)

or existing thermal with new firm gas transport · no RMA floor or cap

0.8

first two years

0.6

2027

0.5

from 2028

No cap

from 1/1/2030

80%

of PPAD in non-dispatched HRP

40%

2027

Plan Gas ends (Dec 2028)

0%

only if dispatched

USD 12/MW per remuneration hour (HRP)

90 HRP per week · KP factor by fuel and season

USD 1,000/MW-month

with or without own fuel management

USD 9,000/MW-month for up to 10 years

Thermal, hydro, nuclear or storage (from 1/1/2025) · SE approval and CAMMESA-assigned node

100% with Distcos, up to 20% with GUDIs

New generation: free contracting since 2025

Own management

mandatory from 1/1/2029

Plan Gas (CAMMESA) or own management

CAMMESA as supplier of last resort

USD 16/MW per HRP × KP

KP 1.1 in winter and summer · 0.9 rest of year

FRA

Existing thermal

FRA = 1

Uncapped margin

FRC

With Plan Gas

Fuel

Gas management

MAT energy

Existing thermal

CAPACITY PAYMENT

Capacity

No own fuel mgmt.

PPAD

Own fuel mgmt.

SRC Base

Existing thermal

SRC Additional

New generation

Demand charge

Capacity price

Theoretical capacity prices: internal estimates based on 390 capacity-payment hours in a typical month; self-managed fuel supply. 13

Concession extension

Piedra del Águila hydro plant

Central Puerto was awarded the Piedra del Águila concession for 30 years, with a bid of US$ 245 million.

New energy and capacity prices: 1,733 US$/MW-month affected by maintenance hours and available capacity. Energy: 3.5 US$/MWh (when dispatched), 1.39 US$/MWh (available). The price doubles between 18:00 and 23:00 hours in December, January, February, June, July, and August.

Optionality for sales under contract: Gradual increase in the capacity allowed for sales under contracts: 5% in 2026/2027, increasing by 5% every two years (10% in 2028/2029, etc.).

Revenues denominated in U.S. dollars, reducing FX and inflation risk.

US Inflation indexes adjustment: Annual revisions.

Maintenance plan: Asset preservation plan

14

Concession Fee of US$ 245 MM paid in January 2026

Central Puerto will operate the plant for an additional 30 years, after having operated it for 32 years.

Appendix

Argentina Power Market ESG & Sustainability data Non-core asset details

2025 Argentina power market summary

30,257 MW

Historic peak capacity in 2025

142,789 GWh

Total electricity generation, 2025

+16.5%

Renewable generation y/y, aprox. 19% of total demand

38.6%

Renewable share incl. hydro in the energy mix

Generation by source

Total 2025: 142,789 GWh

Thermal

75,225 · 52.7%

Hydro

30,144 · 21.1%

Renewable

26,659 · 18.7%

Nuclear

10,761 · 7.5%

Renewable mix

Wind 70%

Solar 19%

Small hydro 5%

Biomass 4%

Biogas 2%

Thermal fuel consumption

2025 volume and change vs 2024

Natural gas

42.2 Mm³/d

▲ 1.1%

Gas oil

439.3 Mil m³

▼ 53.5%

Fuel oil

91.4 Mil Ton

▼ 60.9%

Coal

266.0 Mil Ton

▲ 5.2%

Total fuel consumption fell 2.6% y/y: liquid fuels were partially replaced by natural gas.

Balance

GWh

vs 2024

Local demand

141,249

▲ 0.7%

Generation

147,093

▲ 0.2%

Exports

509

▼ 47.6%

Imports

4,304

▼ 7.5%

Electricity demand

Local demand breakdown, GWh

Residential

66,388 · 47%

Commercial

38,498 · 27%

Industrial

36,363 · 26%

Source: CAMMESA

16

ESG & Sustainability data

Strong corporate governance

Corporate governance framework Ownership composition (Sept. 2026)

Our corporate governance framework is built on internationally recognized best practices and guided by strict standards of transparency, efficiency, ethics, investor protection, and equal treatment of shareholders.

Our Corporate Governance Code aligns with the principles set forth by the CNV (Comisión Nacional de Valores).

We have implemented a robust Code of Ethics and an Internal Code of Conduct, which define clear expectations for professional conduct, integrity, and employee performance. These frameworks support a culture of accountability across all levels of the organization.

Corporate Management & Board highlights

According to our bylaws, the Board of Directors consists of nine members, appointed for three-year terms, with one-third of its composition renewed periodically.

45% (4 members) of our Board of Directors qualifies as independent, based on CNV criteria (may differ from those defined by the NYSE and NASDAQ standard of independence), 1 member (11% of total Board members) is a woman.

No controlling shareholder group, supporting fair and transparent decision-making.

Internal Oversight Committees: Audit Committee and Supervisory Commission.

Experienced management with extensive industry expertise and strongly aligned with Central Puerto's corporate governance principles.

100% of our shares are publicly listed in BYMA (Arg) and NYSE (US).

25.4%

74.6%

Our common shares are listed on the BYMA under the symbol "CEPU". During 2025, the volume traded on the BYMA amounted to 308,113,408 shares. The total number of shares subscribed and integrated on September 30, 2026, was 1,513,770,222, of which 100% were listed and available to trade on the Buenos Ares Stock Exchange. Since February 2018, our ADSs representing our common shares began to trade on the NYSE under the symbol "CEPU". As of September 30 2026, the volume of ADRs outstanding in the NYSE amounted to 38,463,856, equivalent to 384,638,560 common shares.

17

Sustainability is present in every stage of our activities and, together with environmental management, constitutes one of the pillars of our business.

Biodiversity protection

Conservation of Pampas Meadowlark

(leistes defilippii)

Site

Quality ISO 9001:2015

Environmental

ISO 14001:2015

Health & Safety

ISO 45001:2018

Piedra del Águila (hydro)

Brigadier Lopez (thermal)

Achiras (wind)

Manque (wind)

Los Olivos (wind)

La Genoveva I (wind)

La Genoveva II (wind)

La Castellana I (wind)

La Castellana II (wind)

Luján de Cuyo (thermal)

C. Puerto complex (thermal)

C. Costanera complex (thermal)

Sustainable grassland management practice

Avoid

natural grazing from turning into grain crops or winter grass pasture.

Dispense

with the use of herbicide and, above all, insecticide.

Handle

the livestock load depending on the season.

Conduct

controlled grazing fires, except during the reproduction period.

Minimizing emissions: Next-to-zero GHG intensity in thermal generation and steam production

Absolute emissiones (Tn CO2e)

Scope 1 & 2 Emissions intensity (Tn CO2e/Thermal MWh)

0.46

0.33

0.47

0.52

7,037,022

0.51

5,160,925

6,450,681 6,395,399

6,056,014

35,171

58,243

64,562

64,392

63,616

2021

2022

2023

2024

2025

18

ESG & Sustainability data

ESG in the center of our business

Environment, Quality, Health & Safety Integrated Management System

We have an Integrated Management System (SIG) that identifies sustainable and participatory processes, which allows us to implement, in our daily activities, the principles established by the Board in the Integrated Policy of Environment, Quality, Health & Safety. Our SIG is ISO 9001, 14001 and 45001 certified.

Non-core asset details Non-contro ling interest in 3 thermal plants

We hold interest in three ENARSA's combined cycle plants.

The plants total 2,554 MW and total annual generation of 10,514 GWh in 2025.

San Martín

Manuel Belgrano

Vuelta de Obligado

Company

Termoeléctrica José de San Martín S.A. (TJSM)

Installed capacity: 865 MW

Termoeléctrica Manuel Belgrano S.A. (TMB)

Company

Installed capacity: 873 MW

Central Vuelta de Obligado

Company

S.A. (CVOSA)

Installed capacity: 816 MW

Technology Location

Commercial

Thermal Combined Cycle located in Timbúes, Santa Fé province

Technology Location:

Commercial

Thermal Combined Cycle located in Campana, Buenos Aires province

2010

Technology: Commercial

Thermal Combined Cycle located in Timbúes, Santa Fé province

2018

operation year: 2010

Ownership transfer: 2020 to ENARSA

operation year:

Ownership transfer: 2020 to ENARSA

operation year:

Ownership transfer year: 2028

Operator: Central Puerto

44%

56%

Ownership structure

%

Energía Argentina S.A.

68.83

Central Puerto S.A.

9.63

AES Argentina Generación S.A.

6.37

ENEL Generación El Chocón S.A.

5.60

Pampa Energía S.A.

2.84

Central Costanera S.A.

1.68

Orazul Energy Cerros Colorados S.A.

2.01

Hidroeléctrica los Nihuiles S.A.

1.42

Hidroeléctrica Diamante S.A.

0.76

Hidroeléctrica Ameghino S.A.

0.43

Central Dock Sud S.A.

0.42

Generación Mediterránea S.A.

0.01

Ownership structure

%

Energía Argentina S.A.

65.00

Central Puerto S.A.

10.83

AES Argentina Generación S.A.

7.17

ENEL Generación El Chocón S.A.

6.23

Pampa Energía S.A.

3.19

Central Costanera S.A.

1.89

Orazul Energy Cerros Colorados S.A.

2.26

Hidroeléctrica los Nihuiles S.A.

1.60

Hidroeléctrica Diamante S.A.

0.85

Hidroeléctrica Ameghino S.A.

0.48

Central Dock Sud S.A.

0.47

Generación Mediterránea S.A.

0.01

Outstanding credit for CEPU:

Other

19

FONINVEMEM is a 2004 financing scheme, created by Argentina's Secretariat of Energy and administered by CAMMESA, under which private generators' investments in new power plants are recognized and repaid through future energy-dispatch payments, adjusted by an agreed interest rate (e.g., SOFR + spread).

TJSM and TMB Ownership structure according to companies' websites Sept. 2026. https://www.tmbsa.com.ar/empresa/ and https://www.tsm.com.ar/autoridades/ .

As of Jun 30, 2026, US$ 104.8 MM.

Non-core asset details

Forestry assets across +160,000 hectares.

Lithium project located at the core of Argentina

Our forestry platform is held via Proener S.A.U., wholly controlled by Central Puerto, and spans approximately 160,400 hectares in total, anchored by two key subsidiaries:

Forestal Argentina S.A., with a land base of

~141,000 hectares across Entre Ríos and

Saladas

San Miguel Concepción

Catamarca (Lithium)

The "3 Cruces" lithium project is located in Catamarca, Argentina, within the Lithium Triangle, a region recognized for its world-class lithium deposits, favorable geology and business environment.

Central Puerto participates in the project

Corrientes, including ~67,000 hectares of established eucalyptus and pine plantations, within a total plantable capacity of ~77,500 hectares.

Loma Alta Forestal S.A., adding a further

~19,400 hectares in Corrientes, with ~10,400 hectares already under pine.

Together, these assets position the Group among the leading forestry landholders in the region, with a diversified plantation base and substantial untapped growth potential.

Annual production capacity covers 1.8 million m3 for over 50 customers through 4 forest-industrial regional hubs. The business delivered US$ 13.1 MM in revenue in 2025 and US$ 9.4 in the first six months of 2026. Ongoing expansion includes planting over 3,000 hectares annually, entirely financed by own operating cash flow.

San Roque Virasoro

La Cruz

Paso de los Libres

Concordia

through Minera Cordillera S.A., the leading partner of the venture, and currently holds a 35% interest. The investment is consolidated in the Company's FFSS under the "share of profit of an associate" line.

The project remains in the exploratory phase, providing exposure to the long-term development potential of one of the world's most prospective lithium regions.

Additional resources: Website: Forestal Argentina and section "Foray into the Forestry Business" of our 2025 20-F report.

(1)Through the acquisition of share capital and voting rights of 3C Lithium Pte. Ltd. ("3C"), (a company incorporated under the laws of Singapore), which holds 100% of the share capital of MCSA..

20

Terms and abbreviations

Abbreviation / Term

1Q26 / 2Q26 / 3Q26 / 4Q26

1H26 /6M26 FY25 / FY26 LTM

q/q y/y

Adj. EBITDA

Art. 9 BCRA BESS BYMA CAMMESA CAPEX CENCH CMO

COD CVP

FONINVEMEM

Gas Acuerdo GNL / LNG

Gross Income GT

IAS 29 IFRS MAT MATER

MEM / WEM MM

MW

MWh GWh NYSE ON

Piedra del Águila concession PPA

R400 RMA

Resolution No. 400/2025 SADI

SEC SE

Self-procured fuel SG&A

Spot Market ST

US$ WI

Definition

First, second, third and fourth quarters of 2026, respectively Six-month period ended June 30, 2026

Fiscal year ended December 31, 2025 and 2026, respectively Last Twelve Months

Quarter-over-quarter comparison Year-over-year comparison

Adj. Earnings Before Interest, Taxes, Depreciation and Amortization (Non-IFRS measure). New Adjusted EBITDA formula: Gross Income - Administrative & Selling Expenses + Depreciation & Amortization - Non-recurring operating results

Article 9 of the Piedra del Águila Concession Terms, establishing the remuneration mechanism applicable to the hydroelectric complex. Central Bank of Argentina (Banco Central de la República Argentina)

Battery Energy Storage System

Bolsas y Mercados Argentinos S.A., Argentina´s stock exchange

Wholesale Electricity Market Administrator (Compañía Administradora del Mercado Mayorista Eléctrico S.A.) Capital Expenditures

Non-Conventional Hydrocarbon Concession granted by the Province of Neuquén for the exploration and exploitation of unconventional hydrocarbon resources Marginal Operating Cost (Costo marginal Operativo)

Commercial Operating Date

Variable Production Cost (Costo Variable de Producción)

Fund for Investments Required to Increase Electricity Supply in the Wholesale Electricity Market (Fondo para inversiones necesarias que permitan incrementar la oferta de eléctrica en el MEM) Natural gas supply program under which CAMMESA procures and allocates natural gas to eligible thermal generating units under regulated conditions

Liquefied Natural Gas Gross profit

Gas Turbine

International Accounting Standard 29 - Financial Reporting in Hyperinflationary Economies International Financial Reporting Standards

Term Electricity Market (Mercado a Término)

Renewable Energy Term Market established under SE Resolution No. 281-E/2017 Argentine Wholesale Electricity Market (Mercado Eléctrico Mayorista)

Million Megawatt Megawatt-hour Gigawatt-hour

New York Stock Exchange

Corporate Bonds (Obligaciones Negociables)

Concession agreement governing the operation and remuneration framework of the Piedra del Águila hydroelectric complex since 2026, following the expiration of the original concession. Power Purchase Agreement

Secretariat of Energy Resolution No. 400/2025 Spot Market Remuneration Adjustment Factor

Resolution issued by Argentina´s SE establishing the remuneration framework for conventional generation, including seasonal capacity remuneration and energy pricing mechanism applicable in the MEM Argentine Interconnection System (Sistema Argentino de Interconexión)

U.S. Securities and Exchange Commission Argentina´s Secretariat of Energy

Fuel purchased directly by the Company for spot generation and subsequently reimbursed by CAMMESA under the applicable regulatory framework Selling, General and Administrative Expenses

Electricity sold into the Argentine Wholesale Electricity Market and remunerated under the applicable regulatory framework Steam turbine

U.S. Dollar Working Interest

21

Contact

Contact us or to subscribe to our Distribution List:

[email protected]

Investor Presentation

November 2026

LinkedIn

Central Puerto

Web

https://www.centralpuerto.com

Phone

+ 54 11 4317 5000

Headquarters

Av. Tomas Alva Edison 2701, Dock E, City of Buenos Aires Port.

Attention: This is an excerpt of the original content. To continue reading it, access the original document here.

Central Puerto SA on 6ix

Story so far

Earlier from Central Puerto

Later from Central Puerto

All Central Puerto news releases