Bulk Brine Production Complete at Utah Lithium Project
Filed with ASX · · 4 pages · English
Summary by 6ix AI
The operation was largely funded by a federal grant from the US Department of Energy awarded to the Paradox Basin Lithium Group. This announcement highlights Mandrake's focus on advancing its lithium project in a favorable regulatory environment in Utah.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Story so far
Earlier from Mandrake Resources
- Bulk Brine Production Commences at Utah Lithium Project
- Tenure optimisation at Utah Lithium ahead of well re-entry
- Bulk Brine Production at Utah Lithium Project
- Drilling contract signed for Berinka Pine Creek AuCu Project
- Utah Lithium Project - Competing Tenure
Later from Mandrake Resources
- Berinka Drill Permit Approved
- Drilling commenced at Berinka Pine Creek Gold-Copper Project
- Quarterly Activities/Appendix 5B Cash Flow Report
- Drilling completed at Berinka Pine Creek Gold-Copper Project
Follow Mandrake Resources into a list and get an email when it puts out news.
Follow Mandrake Resources