Bulk Brine Production Commences at Utah Lithium Project
Filed with ASX · · 4 pages · English
Summary by 6ix AI
The company will supply lithium brine to several Direct Lithium Extraction providers, including Electroflow Technologies Inc, for testing and assessment. This initiative is partially funded by a federal grant awarded to the Paradox Basin Lithium Group. The brine production aims to gather data essential for future commercial modeling and Scoping Studies.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Story so far
Earlier from Mandrake Resources
- Tenure optimisation at Utah Lithium ahead of well re-entry
- Bulk Brine Production at Utah Lithium Project
- Drilling contract signed for Berinka Pine Creek AuCu Project
- Utah Lithium Project - Competing Tenure
- US Department of Energy Funding Received
Later from Mandrake Resources
- Bulk Brine Production Complete at Utah Lithium Project
- Berinka Drill Permit Approved
- Drilling commenced at Berinka Pine Creek Gold-Copper Project
- Quarterly Activities/Appendix 5B Cash Flow Report
- Drilling completed at Berinka Pine Creek Gold-Copper Project
Follow Mandrake Resources into a list and get an email when it puts out news.
Follow Mandrake Resources