Barrambie Gold - Wide High-Grade RC Drill Intercepts
Filed with ASX · · 27 pages · English
• All gold assays have been received for Neometals’ RC drilling programme1 completed at the Ironclad deposit and the historic Mystery gold mine area located at Neometals’ 100% owned Barrambie Gold Project. Processing of remaining Barrambie Ranges RC drill assay data is continuing; • Significant intervals returned for Ironclad deposit include: • 25ICRC013 – 19m at 4.16g/t Au from 106m (Incl. 9m at
Earlier from Neometals
- Collaboration with De Nora for ELi Process
- EIT RawMaterials Invests Additional 1.5M Euro into VRP
- Neometals Secures Development Partner for Ironclad Project
- First Gold Assays for Barrambie Ranges Drilling
- Exclusive Option to Evaluate US Oilfield Brine Opportunity
Later from Neometals
- Barrambie Gold - Final Assays for Barrambie Ranges Drilling
- Quarterly Activities/Appendix 5B Cash Flow Report
- ELi Process - MOU with Rio Tinto Extended
- Settlement of Legal Proceedings
- Barrambie Exploration Update - Historic Rinaldi Copper Mine
Follow Neometals into a list and get an email when it puts out news.
Follow Neometals