Anson Commences Geotechnical Study at Green River
Filed with ASX · · 10 pages · English
Summary by 6ix AI
The study will involve core drilling, shallow trenching, and geophysical surveys to gather data on subsurface conditions and provide construction recommendations. The results of this study will inform engineering studies for the proposed lithium plant.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Anson Resources Limited on 6ix
In the deck
Story so far
Earlier from Anson Resources
- Paradox Lithium Plant Front End Engineering & Design Study
- Anson to Acquire Land for Green River Li Processing Plant
- Strategic Expansion of Paradox Lithium Project
- Positive Federal State from Site Inspection of Drill Sites
- Site Works Underway for Western Strategy Drilling at Paradox
Later from Anson Resources
- Anson to Acquire Strategic Lithium Project in Paradox Basin
- Anson Completes 3D Geological Model at Paradox Basin
- Anson Receives Key Air Quality Approval for Paradox Lithium
- First Lithium Carbonate Produced from Brines from Paradox
- Groundwater Flow Model Confirms Pressure Remain Constant
Follow Anson Resources into a list and get an email when it puts out news.
Follow Anson Resources