Alkali Flats Project Update
Filed with ASX · · 6 pages · English
o Over 30 holes reverse circulation (RC) and core holes permitted. o Phase 3 drilling will test extensions of known mineralisation, infill drill the Phase 2 drilling and provide core for ongoing metallurgical studies. o Drill rigs have been contracted and preparations for mobilisation have commenced. • Further metallurgical testing has been initiated: o Samples from the Phase 2 drilling have been
Earlier from Fulcrum Lithium
- High Grade Surface Samples from New Nevada Lithium Project
- Alkali Flats Initial Metallurgy Results
- Geophysical survey expands Alkali Flats lithium target
- Alkali Flats Project Update Lithium Discovery
- Fairway Project Update
Later from Fulcrum Lithium
- Quarterly Activities/Appendix 5B Cash Flow Report
- Thick Continuous Lithium Mineralisation Confirmed at Alkali
- Alkali Flats Metallurgy Update
- Thickest and Highest Grade Lithium at Alkali Flats
- Dry Canyon geophysical results lead to claims expansion
Follow Fulcrum Lithium into a list and get an email when it puts out news.
Follow Fulcrum Lithium