31.75m of Spodumene-Bearing Pegmatite Intersected Mavis Lake
Filed with ASX · · 18 pages · English
• SGS have concluded their site visit to perform customary due diligence checks and data correlation in support of JORC Code (2012) compliant resource modelling • Over 16,500 drill meters completed in 2022, with drilling ongoing • Assays from 42 drill holes, with confirmed spodumene mineralization are pending • Maiden Mineral Resource Estimate on track for Q1 2023 Critical Resources Limited (ASX:C
Story so far
Earlier from Critical Resources
- Assays Confirm Continuous High-Grade Lithium Mineralisation
- Exceptional Intercept with 18.45m @ 2.06% Li2O at Mavis Lake
- Further high-grade results, up to 3.36% Li2O at Mavis Lake
- Appointment of Experienced Lithium Executive MD
- Exceptional Assay Results, up to 4.32% Li2O at Mavis Lake
Later from Critical Resources
- $6.7m funding secured at a significant premium
- Critical Resources fully funded for 2023 Canadian drilling plans
- High-grade Lithium over 1,300m Strike length at Mavis Lake
- Reinstatement to Official Quotation
- Possible New Zone following 30m Intercepts at Mavis Lake
Follow Critical Resources into a list and get an email when it puts out news.
Follow Critical Resources