2nd Geotech Engineering Survey for Green River DFS Completed
Filed with ASX · · 12 pages · English
Summary by 6ix AI
The survey confirmed that subsurface conditions are suitable for the proposed Direct Lithium Extraction processing plant, providing essential data for engineering studies and construction recommendations. The report details the methods used, including boreholes and geophysical surveys, to assess the site for foundation design and construction options. This announcement highlights the company's ongoing efforts to advance its lithium production capabilities in Utah, USA.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Anson Resources Limited on 6ix
Earlier from Anson Resources
- Completion of Oversubscribed Share Purchase Plan
- New Approval for Resource Expansion Drilling at Paradox
- Anson Estimates a Zn-Pb-Ag Resource at the Surprise Deposit
- US$330M Letter of Interest from Export-Import Bank of the US
- Anson Granted SITLA Blocks at Green River Lithium Project
Later from Anson Resources
- Chemical Free Testwork Successfully Remove Iron from Brine
- Anson Receives Approval for Yellow Cat Exploration Drilling
- S&P DJI Announces March 2025 Quarterly Rebalance
- Anson Resources | A1 Lithium & KOCH Successfully Deliver Direct Lithium Extraction Industry Leading-Results
- Green River DLE Pilot Delivering Industry Leading Results
Follow Anson Resources into a list and get an email when it puts out news.
Follow Anson Resources