200-metre-wide gold intersection in North Pipe at Colosseum
Filed with ASX · · 15 pages · English
• Assay grades are generally higher than Mineral Resource Estimate (MRE) block grades from historical drilling. • The North Pipe contains 603,000 oz out of the total 1.1 million ounces MRE at the Colosseum • Results to be incorporated into the Colosseum Scoping Study that is underway Dateline Resources Limited (Dateline or the Company) is pleased to announce diamond drill results from two holes dr
Dateline Resources Limited on 6ix
Story so far
Earlier from Dateline Resources
- Security Class Reinstatement to Quotation
- Security Class Suspension from Quotation
- Results of Renounceable Rights Issue
- Corporate Presentation
- Prospectus to Renounceable Rights Issue
Later from Dateline Resources
- $1.66 million Rights Issue Shortfall Placed
- Colosseum Project Scoping Study
- Monthly Activities/Appendix 5B Cash Flow Report
- Waste Dump's Lab Results for Aggregate Use
- Quarterly Appendix 5B Cash Flow Report
Follow Dateline Resources into a list and get an email when it puts out news.
Follow Dateline Resources