Replay available

Sterling and Wilson Renewable Energy (NSE:SWSOLAR) Q1 2027 Earnings Call

Sterling and Wilson Renewable Energy (NSE:SWSOLAR) Q1 2027 earnings call, held 2026-07-17. Watch the replay and read the transcript on 6ix.

Fri, July 17, 2026 at 10:40 AMendedReplay
Sterling and Wilson Renewable Energy (NSE:SWSOLAR) Q1 2027 Earnings Call
Company
Sterling and Wilson Renewable Energy Limited (NSE:SWSOLAR)
Period
Q1 2027 earnings call
Date
Fri, Jul 17, 2026, 10:40 AM ET
Replay
Watch the replay on this page · 1 h 3 min

On 6ix: 6ix.com/event/sterling-and-wilson-renewable-energy-limited-swsolar-q1-2027-earnings-call

Replay

Transcript

Automated transcript · Written by software from the replay's audio. It can mishear names and figures; the replay is the record.

0:00 Ladies and gentlemen, good day, and welcome to the Sterling and Wilson Renewable Energy Limited Q1 FY 'twenty seven Earnings Conference Call. This conference call may contain forward looking statements about the company, which are based on the beliefs, opinions and expectations of the company as on the date of this call. These statements do not guarantee the future performance of the company, and it may involve risks and uncertainties that are difficult to predict. As a reminder, all participant lines will be in the listen only mode, and there will be an opportunity for you to ask questions after the presentation concludes. Please note that this conference is being recorded.

0:50 Today on the call, we have Mr. C. K. Thakur, Global CEO and Mr. Ajith Pratap Singh, CFO from Sterling and Wilson Renewable Energy Limited and SGA, who are their IR partner. I now hand the conference over to Mr. C. K. Thakur for his opening remarks. Thank you and over to you sir. Thank you and good morning everyone. Let me begin with an update on our business operations and outlook. The most significant milestone of the quarter has been on the international front. In June this financial year, we received a letter of award for our fifty-fifty joint venture with Hassan Alam Construction, one of the leading construction company in Egypt and the wider MENA regions for the West Mina solar power project in the Mina government of Egypt.

1:51 This is a landmark mandate, a 1,000 megawatt AC solar PV plant integrated with 600 megawatt power battery energy storage system, valued at approximately US560 million dollars Once completed, it will rank among Egypt's largest utility scale renewables development. For us, it marks the third gigawatt scale order win in the space of nine months, a clear signal both of the rising ticket size of the projects and of the confidence that market developers place in our ability to execute complex storage integrated SOLAR at scale. The joint venture will undertake the full engineering procurement and construction scope spanning the photovoltaic general facilities, the battery storage infrastructures, grid connection, transmission work and all associated balance of the plant.

2:49 With this order win, we concluded Q1 FY twenty twenty seven with highest ever POV of INR13000 crores, driving a strong visibility for revenue growth for forthcoming quarters. At this point, I would like to draw your attention to the fact that current EUV comprises six turnkey projects, three each in India and international markets, which are yet to commence execution. The total value of these six projects is approximately INR9000 crore. These orders were owned during the second half of financial year twenty six and Q1 FY twenty seven.

3:34 We expect these orders to start contributing more meaningfully during the second half of the fiscal year. Since these are the large projects, we also expect the working capital cycle of the company to significantly improve as the customers' advances for these large projects start flowing through. Moving to the market outlook, the domestic solar EPC market remained a bit slow for a second consecutive quarters due to geographical tensions, volatile commodity prices and high domestic module prices, which deferred new projects awards. Activity on battery storage market has been increasing exponentially with both standalone DES projects getting awarded and hybrid solar projects with battery storage.

4:29 We believe there is significantly large market we remain patient to get profitable orders out of this. We continue to remain patient and are only pursuing margin accretive projects. The bid pipeline continues to remain extremely robust at 27.7 gigawatts of which almost 90% is in India focused. The current bid pipeline is purely focused on the solar PV market and also the best projects, which is another large opportunities in itself. In value terms, we expect the best market ordering activities to be almost equal to the size of the PV market.

5:17 We anticipate ordering activity to pick up from this quarter in the domestic market and we are confident of maintaining our market share, which in our view should enable us to deliver 10% to 15% growth in revenue this fiscal despite the high base of financial year 2026. On the international market outlook, we continue to remain very optimistic on the Africa And Middle East markets and certain geographies in Europe. We currently have three ongoing projects in Africa And Middle East, which should commence execution during this quarter. In all our international projects, we continue to judiciously evaluate the risk and rewards and are mindful of not being exposed to the commodities prices and equipment price increase risk.

6:16 As I have indicated in previous calls, all international solar projects undertaken thus far have been completed successfully within the projected margins. Moving to the Operations and Maintenance segments, we have now achieved our record 18.3 gigawatt peak of peak capacities under operations. We anticipate this full portfolio to start contributing fully from third quarter to this fiscal year. The O and M business provides us a steady annuity stream and good gross and EBITDA margin due to a very low overheads. Our engagement with the Reliance Group continues to be deeper. As you have seen, the Reliance Group articulated at its recent Annual General Board meeting an ambition to build one of the world's largest integrated renewable energy hubs in the Kutch region of Gujarat, a development spread across 5.5 lakhs acres designed to deliver round the clock power at gigawatt scale by integrating solar generation with battery storage and targeted to generate in excess of 40,000,000,000 units annually equivalent to close to 3% of India's current power demand.

7:35 The Reliance Group has already commissioned its integrated new energy manufacturing ecosystems and the first phase of its 40 gigawatt, our battery Gigafactory is on track for commissioning this year with a stated pathway to 120 gigawatt hours. We are working very closely with Reliance Group on technical configurations and execution readiness. While the timing and quantum of specific orders will necessarily follow their rollout schedule, we remain confident of becoming a large shareholders of Reliance Initiative. I want to close my remarks with a point of philosophy because in this business the discipline that matters is not merely winning orders, but exiting projects without negative surprises.

8:29 We continue to protect ourselves through back to back pricing arrangements with our supply chain. We remain deliberately selective, staying away from the mandates that carry land, major right of way or resource risk outside our control and we run the business as we always have on the negative working capital model. That conservatism is in our considered view precisely what will separate the durable players from the rest as the cycle matures. With that, I'll hand over to Ajith to take you through the financials of the company. Thank you, CKD sir, and very good morning everyone. I'm pleased to report a significant milestone in our unexecuted order value exceeding INR13000 crores, which is a first in the company's operating history post COVID era on the back of strong order inflows.

9:30 While our first quarter performance may not be very exciting from a top line perspective, the unexecuted order value and expected execution time lines give us confidence to close this fiscal year with around 10 to 15% growth in overall top line. This implies a strong pickup in top line growth in the forthcoming quarters. For Q1 FY 'twenty seven, our revenue came in at INR1590 crores and it was lower both sequentially and year on year due to lower split of execution, primarily in the international EPC segment. Due to flag end of completion of four of our international projects in South Africa, Spain and Italy, we were mindful in new international business due to earlier challenges faced in international market.

10:23 Now with the success story of four successful international projects, we have bagged three new projects, two in South Africa and one in Egypt, where the execution and revenue flow is likely to start soon. So as CKD alluded during his opening remarks, a significant proportion of our UREs yet to commence execution, post which our top line growth is also expected to pick up. A bright spot in our Q1 results was the performance of O and M segment, where the top line grew around 40% year on year due to the significant increase in O and M portfolio size. We expect continued improvement in O and M top line as the complete portfolio is yet to contribute fully.

11:13 We anticipate full contribution of 18.3 gigawatt to commence from Q3 FY twenty twenty seven onwards. On the gross margin front, our Q1 FY twenty twenty seven gross margins were around 9.9% compared to 10.5% in FY twenty six. We expect the EPC gross margin to range between 8% to 10 depending on the project mix of turnkey and BOS. On the O and M side, we expect gross margins to stabilize at around 20% level. Our operational EBITDA, which is operating revenues less recurring overheads amounted to INR78 crores this quarter and the operational EBITDA margin was around 4.9%.

12:03 Our reported quarterly EBITDA was also positively impacted by ForEx gains and amounted to INR96 crore. Our Q1 PAT grew 36% year on year to INR 53 crore, aided by lower effective taxation rates. Now coming to the balance sheet. Our net debt levels have remained largely stable this quarter. Our gross borrowings declined by approximately INR130 crore this quarter due to scheduled repayments of term loans. Our net working capital was at negative INR260 crore compared to negative INR329 crore in previous quarter. As Sikheti mentioned earlier, with the improved collections from the new large projects, we anticipate the working capital cycle to continue to improve.

12:56 We continue to make good progress on fresh limits on non fund and fund based requirement. We have cumulative been able to obtain fresh trade lines to the tune of more than INR 3,200 crore to add the growth momentum in the business. With this, we can now open the floor to questions and answers. Thank you. We will now begin the question and answer on their touch tone telephone. If you wish to remove yourself from the question queue, you may press star and two. Participants are requested to use handsets while asking a question. Ladies and gentlemen, we will wait for a moment while the question queue assembles. The first question comes from the line of Kunal Shah with TAM Capital Advisors.

14:01 Now despite the order inflow momentum being strong, so the revenues has declined 10% Y o Y and you've not been able to achieve the targeted 20,000,000,000 to 25,000,000,000 run rate for revenues on a quarterly basis. Could you just explain what happened during the quarter? And versus the last quarter guidance of 15% growth for F27, now you're mentioning about 10% to 15%. So is there some bit of miss that we are seeing in terms of execution? We have given the guidance of growth of say around roughly $2,000,000,000 quarter on quarter basis or $2,500,000,000 quarter on quarter basis.

14:52 The assumption was that the revenue would be coming from the projects in hand and the new orders where we were announced L1 in Q3 and Q4. So, this the NTP dates or LOA for these projects were delayed for the specific reasons and the contributions from those new orders could not add to this quarter's revenue streams. Also, the revenue and the UOE from the existing orders that we had, all those projects were during the advanced stage of the execution and most of the supplies were taken into the previous quarters.

15:37 So and we were expecting that the revenue contribution from the new orders will come initially through the supply from here. And therefore, our assumptions was absolutely on the right track and you could have got it. Unfortunately, all new orders launched were delayed. And therefore, I mean, this is a seasonal phenomena that the revenue has dipped. So, I mean, in the subsequent quarters, we don't anticipate maybe the second quarters also would see the slight slow, but then third and second half of the year could be definitely very bright. Understood. Also secondly with this mega order from Egypt, could you just explain the life cycle of this particular project and when will the execution start?

16:27 Yes. So that's the landmark project for us and the project is for thirteen to fifteen months' time after NTP, the two months LNTP periods. And the NTP of this project we are expecting in September. With this September NTP, are expecting that the revenue contribution from this project will add to the last quarter of this financial year. Okay, understood. And just last bit on the orders from Adani or potential parent orders or the Egypt one, none of the company specific banking limits will be used for these three projects, right, I mean? No, yes. So for this Egypt order, there could be part amount which we'll use from existing credit lines and partly we can get the new credit lines for project specific requirement.

17:25 For Adani, there is no specific requirement for using credit lines because supplies are primarily from their side. From parent company, we have still not closed the terms. So, be speculative if you see anything in terms of requirement of credit lines. But broadly, anticipate that there may not be requirement of using any credit lines. Understood. This is helpful, sir. Thanks a lot. Thank you. The next question comes from the line of Yash Jorani with Code Advisors. Please go ahead. Hi, sir. So how much of our 13,000 crore UOV is exposed to, say, the ALMM list to sell? And with domestic sale being, like, at around 130,160% premium and a six month certification backlog, what is the risk of that our execution ramp slips off into say the next few quarters?

18:22 Yes, so basically it's the Coal India orders that we announced last time where we are L1, the NTP or LOA still we are expecting. This is a turnkey project. And here and you know that as per the policy guidelines, any project which were bidded after 09/01/2026, they are all under the this year category. So, the Coal India orders is one that is under this year category. Interestingly, we have already locked the price, the price at which we have, I mean, submitted our bids. So, despite the fact that the market is not stabilized, the DCR market, there are lot of speculations all around. But the coal India will be the first order, largely first orders, where the DCR models demonstration will come. And fortunately, we have locked the price and we don't anticipate any impact on to the model price increase because of the market upsets.

19:22 Understood, sir. Just a follow-up for that. So, for future orders and tenders that we will bid, the DTR cost tariff shock, will it break any project IRRs for you guys? Not really. Not really. I mean, say that our margins are I mean, as you have given the guidelines that it depends on the mix of the orders that we are getting. So, whether full turnkey or U. S. Some seasonal impact in one quarters could happen. But overall at the end of the year if you see then our margin will remain in basically 8% to 10%. And for BEST, it has its own say localization pressure. So how exposed is your BEST margin to the duty charges on the imported sales?

20:12 No. No, I could not really get your questions. Can you come back again, please? So the best projects have their own localization pressure in terms of the sales that are currently being imported. I just wanted to understand how exposed is our best project IRR or the order, say, on the duty charges which are put on the imported sales. What kind of margin do we expect from that segment if any say regulations come into place? Yes, absolutely. I got it. Yes. So this is basically you're talking about the best projects. So basically, we are currently executing one bus project, which is the best supply not in our scope, it is being supplied by the client fee of cost. So there is no impact of such regulatory changes and all. We are doing only this project.

21:01 In futures, if the best projects comes with the turnkey orders, including the best supply in our scope, So, whatever price we'll consider kilowatt hour price, we'll consider within the current market scenarios and all. As of now, in the existing orders, we are not exposed to any such risk. Okay. Thank you so much. Thank you. The next question comes from the line of Faisal Hawa with H. G. Hawa and Company. Please go ahead. Sir, are we going to work on any kind of projects over the sea in this financial year or any orders coming up for that? And secondly, sir, did you say that the second quarter will be also slow because of revenue not being recognized and acquisition being slow?

21:55 So the first question is your over the sea. Floating are you talking about the floating solar plants? Yes, yes. Yes, great. You mentioned in the presentation also. You may be aware that, I mean, we are doing one of the India's largest floating plants with NTPC and DBC joint venture as a client in their one of the biggest dam in Tel Aviat, Sarkhand. And after that I mean there was one more tender in the market that we lost to somebody, maybe KPI in Gujarat through SECI. These quarters, there are few tenders which are coming, right, and there are large size, including again the NTPC, DVC, Ventures and plus some of the state governments. And having executed on large projects, are well positioned to participate in these tenders and we are expecting here some of the I mean some portions of the orders definitely will come to us.

22:51 Second question that the revenue in the second quarter. Yes, what I said that in second quarter there were two factors. One that the new orders that I have mentioned, even if it I'm expecting the LOI to come in this quarter, yes, this quarter. But then the revenue realization will happen in subsequent quarters only. So, on the existing UV in the hands to that extent it will be impacted and plus rainy seasons, the monsoons, right. So that also will slightly attain. But nevertheless, the number that we have achieved in this quarter, I'm confident of achieving, I mean, in the similar range for the next quarter as Quarter three and quarter four would be definitely be very, very high because by that time all the new orders will come into the execution stage and I'm expecting that the significant contributions from those orders will come to revenue.

23:50 Just to add what are the efforts that we are making to reduce the central office expenses and the overall fixed costs that we are having? And secondly, sir, is there any way that we can mitigate the risks of this international order that we have also got? So, no, the first part of the question again, just missed the fixed cost. Yes, fixed cost, particularly our center office expenses because that is what all these order increase, see whatever manpower strengths and the other things are augmented to take up these kind of the new orders, they are all clustered into the project.

24:36 And municipal augmentations happens at the head office. And if you see our energy manpower strength and other things, so and the number also, so this quarter's overhead is also mean lesser than the last quarter in fact. So we are pretty well on to the managing the overhead of at the company levels. On the international side, the risk I don't foresee because all the market surge and everything and few of the items which we believe that could be getting impacted were all tied up back to back. So, is no risk of and having executed the four projects in terms of market as we have been telling in the previous calls also.

25:26 So, the team is well positioned to understand the market risk before times and position themselves to take care of all those. So, both the projects in Africa, Europe, I mean successfully have completed within the prescribed burns and above or I can say above the targeted margins. So, are pretty confident that there should not be any miss on the new projects that has come to us now. And sir, what is the hit rate in this quarter for us out of total amount of projects that have been vetted out in India? How much have we won? And what is the kind of bid pipeline we see for the coming year in India in terms of INR crores? So unfortunately, so this quarter we were expecting that the order in the tune of over INR 20,000 crore could have been finalized, right.

26:18 But and then those were the spill over order from the Q4. Unfortunately, the total orders that were concluded was only INR6400 crores including both the PSU and the IPP. Some of the new entrants have gone aggressive and we remain patient to see the profitable orders. And since we had already very great visibility of the revenue streams out of the new orders that we got and UOB that we had from the existing one. So, we definitely we have not gone that aggressive and that's basically we decided not to go that aggressive. But since these two quarters have been sluggish, the projects that have been announced in the quarter three and the projects that are anticipated to be announced in quarter four, overall value if you say that is still I can clearly see that the order worth of around INR45000 to INR50000 crores, right. So let's say around 35 gigawatt orders on 25 gigawatt on the utility scale and around 35 gigawatt hour on the best side.

27:31 So those kind of orders pipeline is clearly seen. So I'm expecting that this quarter's and the next quarter's our shortfall will be definitely catching up. With the huge pipeline, significant orders we've seen and we are anticipating our share to remain intact. Okay. Thank you very much for answering my questions. You. The next question comes from the line of Jayesh Rav with Kask Capital. Please go ahead. Hi. Thanks for taking my question. My question is now that you have already reduced the top line guidance from more than 15% to 10% to 15%.

28:20 And you are also alluding to the fact that second quarter, of course, because of monsoon and other factors, also going to be as low as the first one. That means that your execution in H2 will need to be greater than maybe INR2600 crores, INR2700 crores or maybe around INR2600 crores. And on top of it, you will have Reliance starting their projects, which will also demand faster execution. So are we geared up for such kind of execution scale? I mean, won't that be a bottleneck going ahead? No, absolutely not. So, in fact, as per our guidance, we were geared up to achieve over INR 2,000 crores of revenue in this quarter's cycle.

29:10 Unfortunately, the market scenario, I mean, came into the play and we could not get the support from the orders that we had, right, but then the team was absolutely in place and we are completely geared up for even reliance initiatives also we are in the process of augmenting the team. We have more than the core team strength that we have in place. So, are absolutely, I mean, fine tuned to take up this kind of and we have no other options also. We have to achieve, I mean, the kind of revenues in the second half of the year as you have explained. So, have no other option. We have to. Okay. Just one more clarification. This order, I mean, top line guidance of 10% to 15% is ex Reliance. Right?

30:00 Yeah. That's right. Yeah. Okay. So that means that we'll have to do maybe around INR 3,000 crores around quarter four times. So that's what I'm saying. See, you you you guided for execution of more than 2,000 crores, but here we are talking of close to 3,000 crores. So that is why I asked that question that will that not become a bottleneck in execution? No, our point is well noted and we are mindful of this point that our target for quarter three and quarter four is going to be heavy. We are mindful of this. We are well prepared for that. Okay. So that I mean management is confident and reassuring on that, that will not come as an excuse or whatever, I mean a bottleneck to downgrade the top line growth any further?

30:57 First, we have no option. I mean, we have to perform at that level. In Q4 of FY twenty twenty five, I think we did more than INR 2,500 crores. Yes. We have the We merger have the merger We have merger have in FY twenty twenty five, Q4. And then the significant contribution will come in Q3 and Q4 from international orders also. So, with the domestic and international mix, so achieving the target of over INR2500 I don't foresee any challenge in that. Okay. You I mean, we've at least stabilized on the operational front and our gross margin is also closer to 9.5%, 10%. Now we are talking of the guidance between 8% to 10%. So is there some downgrade there? Or why we are talking of 8% to 10%?

31:50 No. So why we are talking is basically, I mean, in the beginning I have told you, so the margin basically comes from the mix of orders that we get. So, the turnkey orders gap in terms of absolute numbers for turnkey hours, while the percentage margin will remain low, but then absolute numbers will be high, right? Whereas we have the best projects that was for BOS project. On the BOS project side, we have margin of let's say around 10%, correct? This all depends on the in the next few quarters, the kind of orders, the opportunity is huge for even both the turnkey and the BOS. But at this moment, I can't tell you that I mean all are through the RA process and all. So it all depends on the kind of order mix that you will have and that would be between 810%.

32:43 That's what you have I mean, I'm sorry for asking this may be a very dumb question, but will it have any bearing on our EBITDA margins also, I mean, because of maybe a lower gross margin? So, in terms of absolute number will not increase. In terms of percentage, it should come down a little bit from the current number, because we are growing in terms of revenue. Of course, if the gross margin is getting impacted negatively, there will be some impact on EBITDA margin as well. Marginal impact, yes, so yes. Okay. All right. Otherwise, in case of stable margin, your operating leverage scenario should play out?

33:29 Absolutely right. That's right. All right. All right. Thank you so much. That's all. Thank you. The next question comes from the line of with Equipoice Capital Management. Please go ahead. Yes. Thank you. Thank you for taking my question. So now you explained that revenue was impacted due to delays in the projects. So do these delays increase the risk of bank guarantee invocation or contract termination? If yes, what is the maximum financial impact in the worst case scenario? No, not really. So, since the new orders that we said that have been delayed, so those orders contract date itself has not started, because we are anticipating the LOA to come.

34:14 Now the project timelines will start from the date of LOA. So there is no question of the bank guarantee, no cash funds or any further risk on such orders. Okay. And the second question is, there are total claims are around 1,800 crores. So realistically, when do you expect a meaningful portion of these claims to be resolved or recovered? Indemnity? No, as the question... Not indemnity. Basically, claim some you have done some claims. So basically, like there are some claims related to arbitration, then some INR $50.08 crores of wrongful in both bank guarantee claims.

35:04 And there are two international customer claims. So at what time you are expecting that this will be recovered? Yes. So basically, you see the out of this claim, so last claims are from The U. S. Two projects, right, two orders. And they are in court. The settlement of this case in the court will take, let's say, two to three years' times. Mean, conservatively, can say minimum two years. It's going go up to three years' time. So then and the rest others are basically, I mean, could be settled much earlier either through settlement or through arbitration process being concluded, but the two claims will go longer.

35:53 Yes. Okay. Okay. Thank you. Thanks. The next question comes from the line of Sukharev Patil with EyeSight Fintrade. I have two forward looking questions. Maybe these questions would have been answered back also. Just want to have a clarity on this. The first question to Mr. Thakur is beyond the headline order book beyond the headline order book growth, how are you planning to structurally reposition the company's EPC and OEM portfolio over 2528 financial year to defend margins in a rising input cost kind of a scenario while ensuring the performance against execution and battling the competition also in the space. That's the first question.

36:44 I'll ask the second question after. So basically, I mean, as you have been telling you that from the project side, we are anticipating the margin in the range of 8% to 10%. And on O and M business, so this time on the top line in the O and M has been the massive addition. That is largely from the gigawatt levels of the project that we completed in the last couple of the quarters. So, those have come into the operation stage and their revenue streams will start from the subsequent quarter. So, on an average, 30% margin on the O and M side will continue to be there. So that would be the kind of scenario. Because of any uncertainty at this stage, either in the O and M or in the project, I'm not anticipating the margin to dip down from the level that we have now explained to you earlier and now explaining you in this call.

37:42 Thank you. My second question to Mr. Ajith Singh is, again along the same line, just want to understand with working capital intensity rising and financing costs also being volatile, what frameworks are you putting into place to sustain the profits and fund global expansion and maintain your regular dividend commitment. Just in case if any project delays or regulation increase comes in this quarter. I don't understand your view on this. Thank you. Yes. Thank you. So in terms of credit lines, we have diversified base of lenders.

38:30 We have added few new lenders recently in a couple of few quarters in India as well as globally. So for example, in South African project that we brought over there, we have taken trade lines locally from the banks in South Africa. So now we have a very diversified pool of lenders supporting our growth initiatives. In fact, the lead bank also has increased the limit from existing lenders also we are seeing good response and they are increasing the limit. So that's on the credit line side. In terms of term loans, we have significant term loan, which will get repaid during the current year and next year and post that will be almost de leveraged in terms of fund raise requirement.

39:19 Working capital, we likely foresee that we continue to operate in negative working capital cycle considering the advances what we received from the customers and overall payment portfolio from customers and supplies under LCs, which is basically from ninety to one hundred twenty, one hundred eighty days up to one hundred eighty days also in certain cases. So we will continue to leverage that position in terms of managing working capital going forward. Thank you and best wishes. Thank you. The next question comes from the line of Anirud Singh Ji with Dharal and Brocia PMS. Please go ahead. Hi, good morning. So the season arbitration that we entered in Australia, is that covered under indemnity?

40:07 So this there are two portion. One is liquid damage under this contract. It's a contract with a part in Shell and that is covered under indemnity. We are expecting the amount to get realized in the current fiscal from the promoters. And the balance amount, have very strong case because for the same customer in cash to bank guarantees. They leave it LD also and then cash bank guarantee as well. So there can't be two claims and they will there are receivables and payments. So we have a strong position in that case as per the legal advice we opted, and that's why we are going ahead with the litigation. Okay. So the total arbitration amount is about INR 200 crores. Of that, how much is covered by the indemnity?

40:59 Around INR 110 crores is covered under LT. Okay. And in our annual report, we mentioned certain cases, which we think are not tenable, but the amount about INR 3,800 crores. How much of that would be covered? Hello? Yes, I will get back to you on this. So basically, these are frivolous kind of claims loss from our customers. And there is no cash out as of now. So it is difficult to quantify the amount at this stage. Okay. But I just want to understand if any of it is covered by the indemnity or not? So one large claim is covered that is from a customer where we have not taken the project. We the project, but later on that was canceled.

42:01 So that's covered. To quantify the exact amount because this kind of frivolous claims and without any basis as of now. So to quantify the amount is difficult, but we don't foresee any likely impact on the company because of these claims. Okay. Thank you so much. Thank you. The next question comes from the line of Balasubramaniam with Arihant Capital. Please go ahead. Good morning, Thank you so much for the opportunity. Sir, on the battery side, the opportunity side, earlier mentioned about 50 to 60 gigawatt hours. But our order backlog is around INR 300 crores INR 100 crores range. I'm trying to understand what are the big pipeline in the debt segment and what are that government target or tender pipeline over next two to three years?

42:57 And when we can expect sizable revenue contribution in the debt segment? So, I mean, you know the Government of India target of achieving this 500 megawatt by 2030 is well on track. And contribution from SOLARS is close to 200 megawatt as of now. So, I'm expecting that in the next two to three years, the opportunities to be made available in the market will be in the tune of let's say 35 to 40 gigawatt, right. And enough opportunities are there. So, when you say that, so how our business philosophy operates is that whatever you have from the projects that we have in hand that we commit to the market that from there we will be getting the revenue.

43:52 And any orders new orders coming before the quarter one let's say 20% to 30% would be coming as a part of revenue in the subsequent quarters. Any orders which will come in the quarter three, particularly quarter four and all that will spill over to the next quarter. So that's how basically we I mean forecast the revenue streams and accordingly the other financials on that. Which are the battery can trade you are currently pursuing, whether it's a SLS, NMC, ODM, I mean?

44:41 And what is the current trend? And what is our coaching strategy? Because in Indian market, it's not that much matured. Right now, it's at an evolving stage. So if you could explain your sourcing strategy and what kind of battery exchange we are looking on? Is that any changes in technology whether it will improve on the margin side? Firstly, the base side, if you see the margin in the BOS is same as the EV plant, 10%, around 10%. And on the battery side, in fact, market could be turbulent and that also can go sometimes even lower than the TV models margin that in the turnkey pullet you consider.

45:33 But more or less you can consider in the similar amount. On the technology side, yes, we are also geared up. We know that having executed around 28 gigawatt around the globe. So, are well positioned to take care of any kind of technological development that is happening in the industries. So, we can see much ahead of the times and the market pressures is also I mean basically leading us towards the more innovations and innovations and innovations and optimizations in the I mean area. So, you are right that pressure will come from the other uncertainties in terms of technological development and in terms of other things, but we are well positioned to handle all those kind of things, right.

46:23 And the sourcing strategy for battery? Strategy from Sourcing strategy, yes. So, sourcing strategy, see currently, I mean, we don't have Indian market matured enough to get the battery in India. And now the government I mean, the criteria for the tender is that it should be make in India program. So, most of the peoples there is there could be mushroom growth in time to come. But currently all those players they are getting the sale, the containers, the rack, all other components from outside and they are just assembling in India and they are ready to make in India product.

47:13 So, are very, very carefully evaluating that who all could be our partners in the future, particularly looking at their performance and all, because as a company, the performance criteria comes in our on our head. So with all these, I mean, these kind of uncertainties, if we have I mean, we were just trying to understand, that's right, it is there. But then we've been leader in the industries, we are trying to evaluate all those kind of things and then accordingly we'll go for the tires. So we are evaluating. We are still in the process of evaluating. I mean from the markets all those who are trying to integrate the battery supply from India. For international projects, whatever the best will come, they are all from the liquid suppliers. I mean, their project product is proven. There is no such conditions of making specific country programs and all. So there we don't foresee any problem, but for India to sustain the market will be getting matured.

48:10 We have to work carefully and we have to evaluate all these things and then we have to take a call. Okay, Sir, when we can expect improvement in Nigeria side, I think currently it's going through slow phase. And what is our current exposure and is there any big pipeline in Nigeria market? So, Nigeria market, I'll say the, I mean, it's slow procedural delay, I mean, delayed on to the procedure side. Again, elections becoming due and all, it's going to get further delayed. But frankly speaking, sir, in all our business plans, we are not considering as of now in this particular year for any revenue coming from the Nigeria and all.

49:03 Other than that, there could be some opportunities in Nigeria, smaller ones, but we are not following that. The next question comes from the line of Kenil Mehta with Omkara Capital. Sir, any reason for increasing in our O and M capacity drastically from 13.5 gigawatts to 18.3 gigawatts within one quarter? And where do you see the O and M capacity going to 25 gigawatts by FY 'twenty eight? And as we have scaled up our O and M capacity, our revenue should shoot up in next few quarters of O and M from INR90 crores quarterly to INR120 crores, INR130 crores.

49:52 So, thanks. Basically, it's very simple. So, basically our O and M business model is that order additions comes from the EPC orders. So, that's the integrated O and M contract basically. When the project is completed, it comes to the O and M phase and equivalent to the O and M orders this goes to the O and M. So that is from the our own EPC addition. So if you see the last year, we completed around 5.8 gigawatt DC commissioning. So in all those projects which were commissioned, I mean, yesterday they have come to the O and M stage because those orders were for two to three years of O and M in our scope. And the third one is basically the orders from the third party.

50:41 So there has been a significant improvement in the orders from third party as well in the last quarters around 1.2 gigawatt were the one single orders that we concluded and then there were many few in the range of 200 to 300. What we say that if you have seen the market how it is surging, the financial year two point four, two point five, let's say it was 17 gigawatt of additions. I mean, I'm talking about only utility scale, not the rooftop and the other. The 2526 was around 25 gigawatt. This year, it could be around, let's say, 30, 35 gigawatt. So all those projects when it is commissioned, it comes to the O and M stage. And subsequently, we are also raising our limit for the project execution. So those will come to the O and M stage. And the remaining from the third parties, I mean our efforts will grab some more orders from there.

51:33 So basically putting together, so this kind of growth is seen which is I mean quite logical and justified. We expect the revenue of more than INR400 crores will be in the range of INR400 crores to INR450 crores in the current year from O and M business vis a vis around INR268 crores in the last year. Will be significant. Should we see increase in margin from 18% to 25%, which we have seen in FY 'twenty two? O and M margin, we expect to be stabilized at around 20%. Understood. And sir, what was the reason for increasing in our total employee base over one year because technically it's double based on an annual So basically, as the project, I mean, this is the executions capacity you have to augment, right. So earlier, let's say, we are doing three gigawatt kind of thing. This year we have around 10.5 gigawatt under execution. So on the project specific manpower we have to increase.

52:39 And also to and then the large portions of the projects have come to the O and M. So, the O and M manpower also getting added. Also to see the market sees the manpower at least once and the I mean the market is volatile, there are lot of infrastructure projects coming in. So, we also create the pipeline of our, I mean, GETs and all. So, this year we have had around 100 GETs to be trained in next couple of years to take their positions and all. So, they are all futuristic plan. And because of that, I mean, we have to take some call, right? So then that's probably 33, but they are all on to the project specific. They are not adding to the overhead. Okay. So based on your comment with the H2 FY 'twenty seven, EPC revenue will be way more higher than the H1, and it will cover the 15% growth we are expecting.

53:31 That's what I have told. Yes, you are right. And sir, I mean, on the Reliance order, there will be as we book bill for the order and there is a delay in LOA. On Reliance side, due to the parent charge, there could be a quicker LOA acceptance given to you. Is that correct? The time to bid and win dollars and the time to execute will be way lower than the other dollars? Yes. So, project the execution plan would be very, very intensive. So, the time would be definitely lower than the markets because the kind of then accordingly, the Reliance is also preparing that kind of readiness.

54:17 And we as a EPC company also are gearing up to cope up that with this kind of thing. And sir, in the all the raw material will be provided by Reliance, new energy only, we have to only execute on the EPC side? At this stage, it's difficult to reveal all these informations because the contract, the kind of contract that will be formulated with some supply in our scope, majorly being supplied by them. But then what would be the composition of the contracting in terms of pricing and all is difficult to I mean, for the real at this stage. But it will happen, mean, with some supply in our scope maybe mainly by them and then of course the executions. But then exactly revealing the exact, I mean, the fundamentals on the executors, the orders compositions is difficult at this stage.

55:12 And both the companies being or being a reset companies, all those projections will be on arm's length basis. Yes. That's what we can't comment at this point in time. Okay. Understood. But do you think your O and M order book sorting up to as we execute more orders, OMM orders sorting up to 30, 35 gigawatts order book size under May and FY 'twenty eight, which will be more sticky revenue and EBITDA margin for our company. Yes. So you can I mean, our business plan is, of course, if you see the five years business plan, then from '18 to we have seen we have started 1.8 gigawatt of O and M orders in 2018?

55:59 And from there today, are at 18 gigawatt in last four years, right, five years, you can say, right, '18 to '26 no, eight years, eight or nine years. So, means we have got multi fold, right. So, adding even five gigawatt, four to five gigawatt per annum from our own EPC projects and two gigawatts from the outside, the ramp up rate would be pretty high. I mean, we don't foresee the O and M business and see that we add value to the customer. So having seen the kind of the operational maintenance we do for the customer that also stress. So some of the customer who have tried with the other agencies, O and M agencies and seeing the performance of the plant that we operate and we add value to them during this stage, they come to us for the operation. So this market is a pretty robust, I think, in our opinion. So I can't tell you that, I mean, five gigawatts, but then the CAGR for the O and M growth definitely will be going to at the much higher at this speed.

57:10 Understood. And sir, on the arbitration side, if we lose, we have two arbitration, one in U. S, one in other geography. If we lose, then are there any chances of losing on the 1,800 crore and INR 1,300 crore counterclaims by the party? No. As you know, in some of the questions, our CFO has already addressed these questions. So, there are two parts of any claim. One is the LD, right? Other is the operational frivolous claims or whatever it is from the client side and some of our genuine claims, so those are under arbitration. So, while The U. S. Claims, the cases are under the court, which will take pretty longer times, maybe two to three years.

57:57 So, LV size is indemnified, like the others would depends on the court cases. In our opinion, all our cases are very strong. So, we are not anticipating any impact And because shall we take a lower level I'm sorry to interrupt, Karel. I would request you to join back the queue. Thank you. The next question comes from the line of Suresh Wazee with Alembic Pharmaceutical Limited. Please go ahead. Yeah. Hi. Am I audible? Yes. Yes. Yes. Hi. Good morning. Yeah. Yeah. Good morning. My question is regarding... You had mentioned that other receivables related to LCMDG notation were around INR 1,054 crores from your annual report.

58:45 So just wanted to understand how much of these are covered under indemnity? We are cash out and covered under indemnity for around INR800 crores, which is likely to fortify over next couple of years. Currently, we are expecting in the range of INR120 crores to INR130 crores to get realized under indemnity. And based on the outcome of the litigations, amount will get realized from indemnity or from the customer based on the final outcome. We believe that based on the legal opinions, whatever we have obtained that all those litigations, we have very strong case to recover the money either from the customer or from the promoters.

59:38 Got it. Second question is regarding your trade receivables. So if I look at your disputed trade receivables, more than three years, they were at around 145 crores as of FY 2016. And if I take more than one year of trade receivables, they are around 392 crores. So are you expecting any credit impairment loss from these trade receivables? Not exactly. So this trade receivables, you can see in three parts. One is normal trade receivables, second is retention money, which is being logged post completion of the project and get released from the customer as per the contractual terms through completion of defect liability period.

1:00:26 And third is under litigation, which outcome of final litigation will give the final cash flow to the company either from the promoter or from the customer. So this undisputed that you mentioned in the annual report, so these would largely be pertaining to the retention money related to the project? This is our component, that's what I mentioned. It has retention money also, it has a litigated receivables as well as some... Yeah. Okay. Got it. My final question is regarding your... In the last one call, you have said that the order book as of FY twenty seven end will also generate 15%.

1:01:16 So considering that you already achieved a $3,013,000 crores of order book, so would you still maintain that guidance of 15% of order book growth as of FY 2020? Yes. So, that's why. So, basically, last year, our progress run rate on the order achievement was more than the, I mean, the guided number. The base was really high. So, from that base, we are expecting the growth at least at 10% to 15%. So, yes, I mean, you can anticipate the additions of 10 to 15% over the last year number. Mike, I'm asking, what about revenue, but what is the size of FY 'twenty seven, would you have the number in mind, what that you can achieve?

1:02:13 So, order, that's what I'm just trying to say that, so you can say that the order book could be definitely more than INR 10,000 crores in this financial year. We'll start with in the first quarter of next financial year at maybe slightly higher numbers than this financial year we had at the UAV. Got it. Thank you. That's all. Thank you, sir. Ladies and gentlemen, due to time constraints, that was the last question. With that, we conclude today's teleconference. On behalf of Sterling and Wilson Renewable Energy Limited, that concludes this conference. Thank you for joining us. You may now disconnect your lines.

Follow Sterling and Wilson Renewable Energy Limited into a list and get an email when it puts out news.

Latest news releases

Companies on this call

Speakers

C. K. Thakur

Global CEO at Sterling and Wilson Renewable Energy Limited

Ajith Pratap Singh

CFO at Sterling and Wilson Renewable Energy Limited

Kunal Shah

at TAM Capital Advisors

Yash Jorani

at Code Advisors

Faisal Hawa

at H

Jayesh Rav

at Kask Capital

Sukharev Patil

at EyeSight Fintrade

Anirud Singh Ji

at Dharal and Brocia PMS

Kenil Mehta

at Omkara Capital

Suresh Wazee

at Alembic Pharmaceutical Limited

More from Sterling and Wilson Renewable Energy Limited