Replay available

Jai Balaji Industries (NSE:JAIBALAJI) Q2 2027 Earnings Call

Jai Balaji Industries (NSE:JAIBALAJI) Q2 2027 earnings call, held 2026-11-17. Watch the replay and read the transcript on 6ix.

Tue, November 17, 2026 at 8:28 AMendedReplay
Jai Balaji Industries (NSE:JAIBALAJI) Q2 2027 Earnings Call
Company
Jai Balaji Industries Limited (NSE:JAIBALAJI)
Period
Q2 2027 earnings call
Date
Tue, Nov 17, 2026, 8:28 AM ET
Replay
Watch the replay on this page · 41 min

On 6ix: 6ix.com/event/jai-balaji-industries-limited-jaibalaji-q2-2027-earnings-call

Replay

Transcript

Automated transcript · Written by software from the replay's audio. It can mishear names and figures; the replay is the record.

0:00 Ladies and gentlemen, good day, and welcome to Jai Balaji Industries Limited Q2 and H1 FY 'twenty seven Earnings Conference Call. As a reminder, all participant lines will be in the listen only mode, and there will be an opportunity for you to ask questions after the presentation concludes. Please note that this conference is being recorded. I now hand the conference over to miss from Go India Advisors. Thank you, and I'll take you, miss. You,. Good afternoon, everybody, and welcome to JAIBALAJI Industries Limited q two n h one FY twenty seven earnings call to discuss the results. We have on the call mister chairman and managing director mister Raj Kumar Sharma, joint chief financial officer Mr. Vijay Balaji, President Finance and Mr. Ajay Tantia, Company Secretary.

0:57 We must remind you that the discussion on today's call may include certain forward looking statements and must be therefore viewed in conjunction with the risks that the company faces. May I now request Mr. Aditi Rajodhya to take us through the company's business outlook and financial highlights, subsequent to which we will open the floor for Q and A. Thank you, and over to you, sir. Thank you, Sana. We also have Mr. Varun with us. Thank you, Sana. A very good afternoon to everyone, welcome to Jai Balaji Industries Limited Q2 and H1 'twenty seven Earnings Conference Call. Our investor presentation and financial results have already been uploaded with the stock exchanges, and I hope that you have had the opportunity to have reviewed that.

1:46 JAIBALAJI delivered a strong performance in Q2 FY 'twenty seven with revenue growth of 22% year over year and with EBITDA nearly doubling and PAT increasing threefold year over year. This performance was driven by higher volumes across key products, improved realizations and enhanced operational efficiencies. The improvement in profitability reflects the strength of our integrated manufacturing operations, disciplined cost management and favorable realization trends across our various product portfolios. For the first half of FY 'twenty seven, we continued to build on this momentum with healthy growth in revenue, EBITDA and profitability.

2:32 Coming to the industry environment, the total iron price industry continues to experience near term demand softness, which is primarily due to slower government spending, delayed fund releases and project executions. However, the underlying requirement for water and irrigation infrastructure remains strong, providing a favorable medium to long term demand outlook. Key initiatives such as Genzyme Vision 2.0, which has been extended till December 2028, Amur 2.0, this continued to provide structural support to the industry. Their focus on strengthening rural and urban water infrastructure, transmission and distribution networks and water treatment facilities is expected to support further demand for DI pipes over the medium to long term.

3:21 We remain constructive on a gradual recovery in government ordering and project execution as the fund releases improve. On the ferrole industry front, this segment continues to witness encouraging momentum, supported by the healthy steel demand and the growing requirement for specialized and high performance steels. Ferro alloys plays a crucial role in enhancing the strength, durability and performance characteristics of steel, making them an essential input for several high value applications. We are particularly positive on the specialized ferroleye segment where demand for higher grade products, consistent quality and customized specifications continue to create opportunities for established manufacturers. The improvement in realizations over the past few quarters also reflect favorable industry dynamics.

4:09 We believe the medium term outlook for this segment remains very encouraging. Moving to our strategic initiatives. Our broader objective under JAIBALAJI 2.0 remains focused on strengthening our position in specialized and value added products, enhancing integrated manufacturing capabilities and maintaining a strong balance sheet. We have successfully expanded our DAPA's capacity to more than 5.5 lakh tonnes per annum, positioning ourselves very well to capitalize on the recovery in demand as the market conditions improve. In parallel, our specialized ferroalloys capacity is being announced from 1.66 lakh tonnes to 1.9 lakh tonnes per annum. We are also expanding our blast furnace capacity from 6.3 lakh tons to 7.5 lakh tons per annum and our central capacity from nine lakh tons to around 12 lakh tons per annum.

5:03 These enhancements will strengthen our production capabilities and provide greater operating leverage. On the CapEx front, we have nearly completed our overall investment program of INR $11.12 crores, with the entire amount predominantly being funded through internal approvals. During Q2 FY 'twenty seven, we deployed the balance 36 crores towards the program with the CapEx completion targeted by the end of November to January 2027. The enhanced blast furnace, simpler and specialized ferroalloys capacities are progressing very quickly towards commissioning by the end of fiscal year twenty twenty. These investments aligned with our objective of improving operational efficiency, strengthening backward integration and increasing the contribution of higher margin products.

5:58 Our integrated operations are further supported by key dedicated railway sidings, which provide significant logistical advantages through efficient movement of raw materials and finished goods while helping reduce transportation and turnaround time. On the balance sheet front, we continue to maintain a disciplined approach towards debt management and strengthening our financial position. Our net term debt stood at INR 145 crores only at the end of FY 'twenty seven compared to INR 169 crores at the end of FY 'twenty six. Further, strengthening our liquidity position, we have secured sufficient working capital limits to the tune of $3.95 crores, along with an additional INR 137 crore facility sanctioned by HDFC Bank towards working capital and term loan requirements.

6:49 These enhanced banking facilities will strengthen our working capital limits, help optimize financing costs and support our growth operational requirements. We remain focused on sustained debt reduction while maintaining adequate financial flexibility to support our next phase of growth. Coming to our operational performances. Production improved across key commodity products, particularly pig iron, billets and TMT. Production across other product categories remained broadly stable. Sales obtained during the quarter was supported by all these products, reflecting the contribution of our diversified product portfolio. Specialized Ferroiloids continued to be an important growth driver for the company. Our high gear product portfolio established support presence across more than 40, 45 countries and long standing relationship with the domestic and international customers provide us with a strong competitive advantage.

7:45 Our specialized products command the premium over benchmark prices, reflecting the quality and customized specifications. We remain focused on improving the product mix, strengthening customer relationships and leveraging our enhanced capacities to capture the growth demand in this segment. Across our border steel and commodity portfolio, our integrated manufacturing model provides us with the flexibility to optimize production and manage costs effectively. With increased capacity and backward integration, we expect to derive further benefits from improving operation by improving operational efficiencies, better resource utilization and cost optimization. On the DI pipe front, while near term demand continues to remain subdued, our expanded capacity of 5.5 lakh tonnes per annum is readily available to support higher volumes as the market conditions improve gradually.

8:44 We will continue to monitor the pace of government ordering and project execution while maintaining operational and cost discipline. Coming to our financial performance. Q2 FY 'fifty seven witnessed a greater improvement with revenue from operations growing 22% year on year. Adjusted EBITDA nearly doubled, registering a growth of 93% year on year, and the adjusted EBITDA margin improved around 9% or 5% in the corresponding quarters of last year. Profit after tax also grew by 150 year on year, while PAT nearly tripled, resisting the growth of nearly 192%. The PAT margin also improved significantly from to 5% from 2%. For FY 'twenty seven, revenue from operations grew by 23% year on year. Adjusted EBITDA increased approximately 64%, with margins improving to 9% or 6%.

9:42 PAT also registered a growth of approximately 67%, while PAT margins improved to around 5%. Overall, the improvement in profitability reflects better realizations, particularly in ferroalloys and pig iron, improved production across our commodity portfolio and our continued focus on operational efficiencies and cost management. To conclude, we remain encouraged by the opportunities across our key business segments. Our focus will continue to be on sustaining the growth momentum in our specialized ferroalloys, strengthening our broader steel and commodity businesses and progressively improving the contribution of value added products. We remain committed to disciplined execution, strengthening of our core businesses and continued improving operational efficiencies.

10:32 With a standard balance sheet, enhanced capacity and a clear focus on operational excellence, Jai is very well positioned to unlock its next phase of growth, enhance profitability and create sustainable long term value for all stakeholders. I would like to thank all our investors and analysts for their continued trust and support. With this, we can now open the floor for the question and answer session. Thank you, and over to you, moderator. Thank you. Thank you. We will now begin the question and answer session. Participants are requested to use handsets while asking a question. Ladies and gentlemen, we will wait for a moment while the question reassembles.

11:23 The first question comes from the line of with Equity Research Analyst. Please go ahead. Good afternoon, sir. My question to you is with the twelve hundred dose data nearing completion, what is the expected timeline for the enhanced capacity to reach optimal utilization? And what is the incremental revenue and EBITDA that we are expecting over the next two to three years? See, in terms of in terms of the... Actually, two major models are pending completion. Other other activities are they are operational. The two key major models are there. One is the on the blast furnace where we expect that with that, the cost will be cut down substantially.

12:13 And EBITDA accretion, I don't want to make a much forward looking statement, will be enough substantially in that. Whatever EBITDA we are generating right now in the current flash furnace, that should improve around 25 to 30% with the enhanced module. And as far as the Perola module is concerned, it will not really add to some capacity. It will also it will also integrate some part of our operations such at the moment, likely not fully integrated. So there also we we we should see a reasonable, I would say, upside. Alright. Got it. And also now that the CapEx is almost over, how do we see free cash flow generation improving? What will be our strategy for that? Sorry. Your voice was not clear, ma'am. Can you please repeat?

12:59 Now that the CapEx is almost nearing completion, so now how do we see the free cash flow generation happening? Ma'am, the free cash flow generation will be acting only the... Already it is happening. So initially, whatever you are generating, this will be replaced for working capital purposes mainly. And also when we announce the next close of our growth plans, which will be coming out soon, it will it will increase for that purpose, madam. Alright. Thank you, and all the rest of your questions. You. Next question comes from the line of Revo Sumani with Systematics Group.

13:53 Yeah. Hi, sir. Thanks for the opportunity. So first question is, sir, can you provide This is. This is the operator. Sorry for interrupt... Sorry for interrupting. There's a lot of noise in your background. Can you just move to a place which is not noisy? Yeah. Is it better now? Yeah. Better. And can you speak a little louder? Thank you. Okay. Sir, I just wanted to understand on as the Board had mentioned that they are exploring investment opportunities in the state of West Bank. So just wanted to understand it, are we focusing on setting up a new facilities in specialized alloy and steel for railways? And can you please entail more details on this? That's the first question.

14:45 See the investment plans which have been which are being made, they are still on the drawing board. So we have support from investment in this one world. At the level of it at the group level, when not only JAIBALAJI Industries, but some of our other engineering companies also will be making investments. So the complete plans are still being made. And as I just mentioned in the first question and the first question was put to us is that the plans are being finalized. And now with this stage of tickets in computer, we will give a small, I would say, height of around one quarter from here on. And after that, maybe when we meet by that time, the next phase of the business that will be announced. Okay, sir. That sounds good. And sir, second question is on the demand and the pricing outlook of TI pipes over the next two to three years. So what are your expectation regarding order inflows of JJI JJI and ramp ups in advance?

15:42 What is next two to three years, you said? No. Okay. As we know that the outlay of has been extended from 2024 to 2028, and there is a central offer spending is left. So the projects in the project... Pending projects and the slow disbursement of the last two years is expected to increase. So we can expect the next two, three years will be better than the current and the last year. There will be a growth of demand for that client pipes plus. There there is also with the pipes demand will be there. In irrigation and other they were leaking projects.

16:28 The demand has to be there Okay. That's it. Yeah. That's it. Thank you. Thank you. Next question comes from the line of Rishabh Bora with AB Advisers. Please go ahead. Good afternoon, sir. So my first question is trade payables and other liabilities and provisions resulted in a cash outflow of around INR $2.90 crore during H1 FY 'twenty seven. Could you explain the key reasons behind this movement? And how should we look at the working capital cycle going forward?

17:27 Hello? Hello? Can you repeat your question? Okay. So I'll repeat it. So trade payables, other liabilities and provisions resulted in a cash outflow of around $2.90 crore during H1 FY 'twenty seven. Could you explain the key reasons behind this movement? And how should we look at the working capital in the cycle going forward? You'd be also weighing that the inventory levels have increased. Okay. Was just looking at the trade payables and traders, and the thing did not... Approximately seventy... Sixty years of debt payment has been done.

18:15 Okay. Inventory levels have gone up by approximately 200 crores. I don't have the figure in front of me. So that is the problem with the reason. Okay. Okay. Got it. So my second question is, with the net term debt declining to 145 crore as of H1 FY 'twenty seven, what is the company's targeted net debt position over the next twelve to eighteen months? Do you expect further meaningful deleveraging following the completion of the CapEx program? Well, as per the repayment chart that we have, it should come down to the net the gross debt present in the second quarter was INR 188 crores. The net debt was INR 145 crores, that thing.

19:08 And going forward till March, the gross debt from $1.88, it should come down to $1.40. Okay. And depending on the cash surplus which is available in the system, it should come down to a 110, $100,100 110. Okay. Okay. That's good. And one last question. The company has sanctioned working capital facilities of INR $3.95 crore and an additional INR 137 crore from HDFC Bank. How will these facilities improve liquidity and reduce the overall cost of borrowing? Also also, what is the expected utilization of these limits?

19:58 The expected utilization previously was 70%. It should come down. Second, if we have started availing packing facilities from SDFC, that will reduce the cost from 12%. That... Whatever we were availing here, it will come down to 7%. And the the utilization level will also come down. Second, we also have to position ourselves once the... This ductile item production and this sales pickup. We have to position ourselves so that we are able to keep it cater to the working capital requirements for the announced this production sales. Okay. Okay. Got it. Got it. So second second, it was also an intention of the management that previously we had facilities.

20:53 If I'm talking about one, one and a half years ago, it was mainly NBFCs. Once we had come out of ERP, it was NBFCs. So we had best of NBFC startup capital and these things. Going forward, we have money later on the best of private sector banks, Kotak Bank and SDFC has joined. So the family is spreading. And whatever the working capital requirement, we are also talking talking to some of the PSU banks. Probably next quarter or something, you'll see one or two good PSU banks also joining into our lenders list.

21:38 Okay. Okay. Okay. That... So that's it from my side. Thank you very much for the opportunity. Thank you. Thank you. Next question comes from the line of Shyam Garg with Neon. Please go ahead. Hi. Thank you so much for the opportunity. Congratulations for a good set of number. So my first question is regarding with the ferroalloy capacity expected to increase to 1.9 lakhs CPA. What kind of utilization levels are you targeting over the next two years? And how much incremental revenue position can this expanded capacity unlock? For 1.9 lakh tonnes, the additional capacity will be 25,000 to 30,000 tonnes, which we are our current utilization will be about 90%.

22:34 And what was the second part of your question, please? What kind of utilization are you targeting over the next two years? And what is the incremental revenue potential? 90%. And what how much incremental revenue potential can this expanded capacity unlock? Revenue potential will be four at a half percent. It's at 27% of the rate. Should go around 32%, 33%, but it depends on what will be the ductile iron pipe sales.. 27 of the sales I'm talking about. 20 to 500 course of the new facility.

23:26 Okay. Okay. So my second question regarding the specialized ferroalloy currently contributes to around 2028% of the Q2 FY 'twenty seven revenue. Going forward, do you expect this segment contribution to increase further? And what EBITDA margins can the business sustain as a volume scales up? See, the Ferrolei percentage of share, it will increase definitely from 28 if we move to thirty thirty one. But we must keep in mind also that we are announcing our blast furnace capacity also. So there also, we will be increasing. So as a percentage of total turnover, there will be a proportionate increase. The absolute numbers will be 400 crores approximately, but in terms of percentage, it will be around 30%, 31%.

24:12 Because other products production is also increasing gradually. As far as the margin is concerned, we are doing a margin of 50% to 60% in several ways, which we expect to continue to carry on this. Okay. On our overall business basis, what kind of sustainable EBITDA margin can we expect? See, whatever they have achieved so far, this is a very normative margin. Now the next upside will come with the new blast furnace coming in. That should completely increase. Also, marginally from 9%, we should should be around 10% to 10.5% in terms of EBITDA margin, number one. Number two, production numbers of EBITDA will be increasing because of the enhanced volumes.

24:59 Number two is that the next kicker will definitely be coming. Currently, the pipeline market is very, very subdued. So we are expecting that over the next one or two quarters, three quarters, the demand should keep on increasing. So the moment this starts to improve, automatically, there'll be a jump in the margins also and the absolute numbers also. Okay. Sir, DI five capacity has been expanded to 5.5 lakh tonnes per annum, but the segment continues to face near term demand softness. What is the current inquiry in the pipeline? And by when do you expect a meaningful recovery in order in fuel and capacity utilization? I missed your question because the volume was too slow. You please repeat your question, please? Yes, sir. DI pipe's capacity has been expanded to 5.5 tPA, but the segment continues to face near term demand softness.

25:52 What is the current inquiry pipeline? And by when do you expect a meaningful recovery in the order inflows and CapEx utilization? See, what we see right now is that in the next one quarter or two quarter, we do not see a very huge or humongous jump because the government spending is still very low. But by... At the same time, the resulting emissions scheme that it has outlined of March 2028 to finish. So naturally, the funds will have to be utilized by them. So we expect that in the next financial year or just prior to that, we should be seeing that uptick in the demand. Okay. And then what is the expected order inflow or the CapEx utilization for the next year? Inquiry pipeline is still there only.

26:39 As far as the inquiry pattern is concerned, there is there are still inquiries of more than 2,000,000, sir. So what is happening is that this is a nonbelieving of funds at the right place by the government. Most of the contractors who are executing the contracts, they are right now not not really willing to put in more money to execute the contracts in the time the funds are actually fully released. Okay. Okay. And, sir, another BI pipe production declined from 41,000 in q one FY twenty seven to around 37 tonnes in q two. This was primarily due to subdued market demand or there was planned production adjustment or any other operational factors or maintenance likewise? No. This particular this particular quarter was going to be nonsense.

27:26 Demand, whatever was a new was had only been subdued around since the last four quarters, five quarters. There is no further there is no further left in the demand. But in the monsoons, naturally, because of the... The people were not being able to carry it out on the open area or the rural area. That is why we want to go over this one period. Okay. Okay. This answers my question. Thank you so much for answering my question. All the very best for the next quarter. Next question comes from the line of Junaid Modiwala, an individual investor. Please go ahead.

28:13 Thank you for your opportunity, sir. So with all this geopolitical uncertainty around, how are we seeing the raw material costs shaping up in the second half? And how are the realizations holding up against that? See, the raw material cost in terms of cost of thermal coal and cooking coal, they're already gone up. So the negative impact of that will be visible in the product portfolio. For for us, they're all the time for the contractor, what revenue or whatever. Most of the Speakers, sorry for interrupting.

29:18 Speakers, your voice is breaking. Yep. My voice is breaking. Yeah. Your voice was breaking. So can you just speak once again? Alright. Thank you. As far as the commodities are concerned, they're they're passing through the price where the time line is only fifteen days or twenty days because they're selling us. And as far as the value of the price are concerned, there it takes around two to three months to pass the price, but already the process has started. And even from last month onwards, we are seeing that we have been able to successfully hike the prices and pass it to the customers. Okay. Got it. And on the realization front only, so this specialized ferroalloys have seen a quite a significant jump in their realization.

30:04 So do we see this pertaining or how is it? We see the the... We don't see the realization improving further. Already, the demand scenario, what we are seeing, is very robust. So we'll be hoping that with this particular prices and this particular margin sustain. We are not looking at the expanding the margins, so we have to say five points or 10 points more. If we are able to maintain this, we'll be pretty happy. Only volume, sir, what led to the decline in this quarter? And, like, how do we expect the second half to go? Like, should we expect any pickup or something? No. There been there has been a decline. Is only 3% to 4% decline, which normally happen in the months of month because we also undertake some capital depends on the units in this particular month only.

30:59 H2 should be better relative to the The decline is only 4% to 5%. So as I mentioned is that we took a temporary repair in the in the monsoon period. Got it, sir. Thank you so much. Thank you. Thank you. Next question comes from the line of Rajesh Agarwal from Maniore. Please go ahead. Sir, what is the current DI order book? DI Vipes?

31:47 The current DI order book is around 80 to 90,000 tonnes. Okay. Out of which around 50% of the orders are in dense waste with the PV cost. Okay. Are we exporting DIP also, sir? We are exporting a little of DIP, not much. Not much. Okay. And how was the export market outlook? Due to the geopolitical situations and all, currently, the rates have been increased a lot. Okay. The difference got that good to export currently. But in the near future, the period started coming down. And once the geopolitical situation hit by, the export market for start once again.

32:33 And cooking coal, may... Are we fitting any cost escalation? Yes. Cooking coal has a. Cooking coal Uh-huh. There will be a cost escalation, but this cost escalation, I think, answering the last question is that we... With the majority of the. They are already cashed in the. And then the and then the also the process of passing on this enhanced cost to the customers, they are already there. So the... In the, also, DI price will be required. So any tender or any activity there? See, they will be required, but so far, is happening is that the the details have been made, what for couple of projects have started. So initially, they will have to first have to make the the tunnels and they will have to make the, I will say, parcels ready water.

33:26 Right now, no bigger tender that has no big tender that we have. Ordered. So how much time it will take? Okay. Because project has kicked off out of the 5060. Now they are... We have started the. We expected the inquiries to come maybe from the next quarter or some... Somewhere. And once the fund are tied up and the contractor get their own payments, I think they'll only... They'll be starting to work on the ground. So the requirement will be huge like or it will be lesser lesser than the only thing? Probably be nothing like. Smaller. Smaller. Smaller. Okay. Okay, sir. Thank you. Thank you. Thank you, sir. Sir. Thank you. Next question comes from the line of Shriya, an individual investor. Please go ahead.

34:23 Hello. Hi. Am I audible? Yes. Yeah. I just kind of, you know, expanding on the question that the previous participant said. Like, you know, the company has sort of established export presence in 40 plus countries. Right? So, like, are you witnessing any changes in the demand from the key international markets that you are present, especially, you know, since the global trade uncertainties pertaining. And are there any other opportunities the company is exploring to expand the export piece of the customer? On the export business, we are we are seeing a couple of... In the last two, three years, as India is becoming one of the good options for the customers, and they're relying more on us.

35:13 And we are being a old player in this specialty per segment. The customers are willing to give us a long term orders and come into an agreement. And we are also keeping stocks around in the in the different continents like Europe and The US and maintaining our market leadership there for these products. And the same 40% we have reported customer base and will connect... Connected logistics to give just in time service to all our customers. So this this number of countries and the volumes will be expanding in near future as we are increasing our perilux capacity from 1.6 lakh tonnes to 1.9 lakh tonnes. So surely, the export will be increased further.

35:59 Okay. Okay. Got it. Okay. So my next question is, given the current softness in the DI pipe market, how is the company balancing their production with demand, you know, to avoid the inventory buildups and also, obviously, to protecting the margins? And the second part of the question is, what utilization level would make the expanded DI pipes capacity economically attractive? See, one of the two parts to your question. Number one Yes. Currently, whatever property we are producing, which we are not able to sell as the pipes, we are selling as we are... Where there is a... Where where there is a reasonable margin, number one. But then to be economically very attractive, we will be looking at a capacity position of more than 60% to 70%.

36:53 Currently, we are not near that. But if the demand improves, then we are very well positioned to do that. But Okay. You have been around a bit of 40. So so with a little uptick in demand, there will probably be challenge to do this. Right. Right. Understood. Okay. My next question is how how much of the anticipated BI five demand recovery is, you know, dependent on these government led initiatives? You know? Example, like, Jazi one mission two point o and Amrut 2.22 o. Like, you know, are you ready... Already seeing an improvement in tender activities or auto visibility? Can you just give some more color to it?

37:39 This is AI product is basically a government only, where the dollar spending is a is a major role. And the tenders are there. There are already old tenders which are still pending from the contractors that we placed. They have they have a well well inquiries and placed tenders already there with them already. They don't want any new tenders footing in for this supply. What the contractors... And we wanted that to start getting their old dues and the JGM, whatever promise, they start spending. As per this year's budget, annual budget, out of 67,000 crores in H1, there's now only INR 16,500 crores have been spent. So as soon as this one starts coming in from the government, I believe the rotation will be much faster and whatever the tender the inquiries, which has already been awarded to contractors, this will be coming into procurement.

38:31 Okay. Okay. Understood. Got it. And my last question would be, DI pipes realization have remained relatively soft compared with the other product categories. What is the outlook for pricing and margins in these segments over the next There were a lot of stocks in the industry earlier this year. So now the stocks have been liquidated. And I believe as soon as the demands starts coming up, the prices will also improve a bit since this coking coal prices and other raw material prices are increasing. So there is not a... So the cost push will also support to increase the prices of the plant pipes. So I understand. Sorry, I didn't catch you. Sorry.

39:20 See, madam, the plant in the pricing has already happened for the last quarter of quarter sixteen because there was too much of inventory and demand has stopped very suddenly. So that part is over and most of the manufacturers, they have now rationalized their capacities and cost of sales, keeping in view that we have to be more, I would say, demand elastic. So keeping that in view, we don't see any further bloodbath and prices. In fact, we see marginal prices improving. And most of the manufacturers will now actually recalibrate their production plans and not to operate at 90 or 100% or 80% and be realistic at 60% to 70%. You. Ladies and gentlemen, that was the last question for today. We have reached the end of question and answer session. I now hand the conference over to the management for closing comments.

40:19 Thank you, everyone, for joining the call today. We trust that we have addressed all your inquiries to your satisfaction. In case you have any other remaining unanswered questions, please do not hesitate to contact our Investor Relations agencies, Go and D advisers. They will be more than happy to assist you further. Thank you once again. Thank you. On behalf of Go India Advisors, this concludes this conference. Thank you for joining us. You may now disconnect your lines.

Follow Jai Balaji Industries Limited into a list and get an email when it puts out news.

Latest news releases

Companies on this call

More from Jai Balaji Industries Limited