0:00 Good afternoon, and welcome to the CENTRAL ASIA METALS PLC H1 twenty twenty six Results Investor Presentation. Throughout this recorded presentation, investors will be in listen only mode. Questions are encouraged and they can be submitted at any time using the q and a tab situated on the right hand corner of your screen. Simply type in your questions and press send. Before we begin, I would like to submit the following poll. And I would now like to hand you over to CEO Gavin Ferrar. Good afternoon.
0:27 Thank you. Good afternoon, and welcome to our CAML H1 twenty twenty six results. We're very pleased to announce our results today for the first half of the year, but let's just start with a brief overview of what these results are sort of being underpinned by, which are our two operating assets, one in Kazakhstan, the Kunrad copper operation, which we own a 100%, has been producing copper cathodes since 2012, has a life out to '20... Or license at least out to 2034. And the SAISR lead zinc mine in North Macedonia, again, a 100% owned since 2017 with a reserve life out to 2034. The Kazakhstan exploration companies, CAMLEX and CAMLEXD, again, are conducting exploration for base metals prospects in Kazakhstan.
1:21 And we have a minority stake in a company called Aberdeen Minerals, which is exploring for copper nickel mineralization around Arthrath in Scotland. So moving on to the results themselves. Today, we announced a... At 07:00 this morning, really excellent set of results for us, which really reflects a strong operational performance in an environment of good commodity prices, And that has resulted in revenue figure of $145,500,000 EBITDA of $75,500,000 and EBITDA margin of 52% and free cash flow of $46,800,000 All of these metrics are significantly up on the similar period last year.
2:07 The cash flow number I mentioned of, Shishai, dollars 47,000,000 has driven a dividend announcement of 8p and that 8p represents 40% of free cash flow, which is right in the middle of our dividend range. Now I mentioned the strong operations underpinning all of that. Kunrad operation, in spite of a very harsh winter, produced around about the same amount of copper, in fact, was about 1% up as we did in the first half of twenty twenty five. And pleasingly, in North Macedonia, we are seeing some improvements there with zinc up 5% versus h 01/2025 and lead up 6% versus h one twenty twenty five. This was done in a relatively safe manner. We unfortunately did have two LTIs. We obviously strive for a zero harm work for... Work... Workplace.
2:54 Challenge for the rest of the year is to keep that number at two and get the number of 1.73, which is the last time injury frequency rate back down below our target for the year.
3:08 Our investment case is evolving. We've got a highly highly cash generative business and we are starting to deliver on the growth aspects of that. And this is something we've been working on for a number of years. Those of you who've been following us will be aware that the exploration started about two, three years ago and we've also got a proposed acquisition of Cygnus and that is a key element to the business moving forward. But as I said, underlying this all is that cash generation driven by a CUNRAD and SASA free cash flow almost three times higher than it was this time last year. The returns, we've made consistent shareholder returns, dollars $437,000,000 since our IPO in 2010, that is almost double that what we raised from the market in that same period.
3:59 And the balance sheet of $97,200,000 of cash at the end of June, again, gives us that sort of financial strength to move the company forward in terms of both shareholder returns and growth.
4:17 We're talking about capital allocation and we're talking about balancing the capital allocation moving forward. So that is reflected in this AP dividend announced today, as I said, right in the middle of the policy range. It provides attractive returns to shareholders and also retains capital to finance our growth ambitions. So what we're really doing here is building on strong foundations for the future success of the business.
4:41 I'd like to hand over to Louise, our CFO, to run you through the financials themselves in a little more detail. Thanks, Louise. Thanks, Gavin. Yeah, if we just start by looking at the market conditions, are important to understand the strong results that we've delivered this morning. So obviously most notable in H1 twenty twenty six has been really strong commodity prices for the commodities that we produce. And you can see in the little table at the bottom there, we've got 39% higher copper price that we achieved for the first half of twenty twenty six versus the first half of twenty twenty five, 26% higher zinc price, the lead price relatively flat at just below by 4%. Important for our revenue and our costs equally, but not our profitability is the silver price. And so that does impact the the look and feel of the p and l, although as I say, doesn't affect profitability.
5:36 But what we've seen is very high silver prices and spikes of up to a $115 an ounce. So that's been a feature in higher revenue and also higher costs as well. It's worth me just pointing out that we did put a hedge contract in place of 50% of our zinc production. That was at $3,011.5 a ton. So in the p and l, we'll see we've reported a loss of 1,400,000 for that hedge to the June 30. Looking on the right hand column then, treatment charges has been very positive for us in the first half of this year, totaling $22,700,000 with treatment charges in h one twenty twenty six. That's down by 2,200,000 versus h one twenty twenty five. And actually at the moment from April 1 onwards till April 1 Next year on average, we've actually got negative lead treatment charges, are obviously very, very supportive for our revenue line where they are reported.
6:40 In terms of foreign exchange and inflation, it's the same sort of story at Sasser and at Kunrad where we've got a weaker US dollar versus both of our operating currencies. So, US dollar weakened by 70% versus the Dinar, which is pegged to the Euro, and by 5% versus the Kazakh tenge. Should also say as well, we put in a hedge contract for 50% of our... Approximately 50% of our expected SASSA on-site operating costs for the year, and we've reported a very small loss on that of $100,000. Just a final comment on this slide on inflation, still pretty high in Kazakhstan at 11%, but a little bit more reasonable at 4% in North Macedonia.
7:29 So if we look now in more detail at the income statement, we've got 46% higher revenue to a $146,000,000. As we've just said, that's driven by strong commodity prices, copper, zinc and also the silver and and also importantly, higher sales volumes. So it's a 5% higher zinc volume, 4% higher lead volume. And also while our production at CUNRAD was similar year on year, we actually had 9% higher sales in H1 twenty twenty six versus some stock that had built up in H1 twenty twenty five. If you look now at cost of sales, that's up by around about 10,000,000. That 10,000,000 would be more than explained by the increase in the cost of buying those silver purchases that we need to fulfill the royalty agreement with a Cisco, that's 8,800,000.
8:23 And also from an increase in depreciation from 14 to 15,900,000. That's increased because we sort of mathematically shortened the life of SASSA to 2034 as of the the full year period for the end of twenty twenty five. So that's brought the depreciation up. So those two both add up to 11,000,000. Within the cost of sales, we were helped quite significantly by a big reduction in META, which is the revenue royalty we pay in Kazakhstan. And there was a 90% reduction in the rate, which is specific for processing these kind of man made technogenic deposits they call them, which is which is Kunrab is one of those. And so our META reduced from 5,000,000 in the first half of last year to 800,000.
9:13 Adding back onto that with some cost increases, 2,400,000 from the operations due largely to US dollar weakening against the local currencies. And I'll explain the two sites in a little bit more detail. And also finally, within the mix of the cost of sales, we had about a million dollars higher concession fee, which is the revenue royalty we pay at SASSA. That's for the higher zinc prices effectively and the increased production that we saw for the first half versus the first half of twenty five. Admin expenses, they were up by naught 500,000. So, and of that nought 500,000, one could attribute BD costs which increased by nought 300,000. So actually, UK costs were flat all in all, so there were savings on UK admin costs elsewhere.
10:02 Also within that 500,000 looking at the ups and downs was about 100,000 up at CAMLRad and the rest was up at SASSA largely for the severance pay and the retrenchment program that we undertook. So all that taken into account leads us to a report today an EBITDA of just under 76,000,000, 89% higher than it was in h one twenty twenty five. And we've also got really good EBITDAs for both of the operations as well. So 78%
10:36 increase in EBITDA at CAML to 68,000,000 and a 62% increase in EBITDA to 19,000,000 at SASSA as well. Just another couple of bits and pieces of interest on the p and l. One of the large swings there of over a 100% is this fair value movement in share based payments liability. That's really related to the weakening of our share price up until the June 30 value in the LTIPs that we have in the business that typically can swing up and down. And so that's just a factor that's now notable on our P and L. Taxes, another one just to point out, that was up significantly by 10,800,000.
11:21 That's driven by higher profits at CUNRAL, which are taxed at 20%. And also there was an increase in the Kazakh withholding tax rate from 10% to 15%. That's the tax on the money when we bring our dividends back to The UK. And we brought all our money back to The UK in the first half, but we just put half of that through the P and L. We put the second half through the P and L of that money in H2 effectively. And then finally on this slide, just to point out, we've had effectively at over 300% increase in our earnings per share. And we've also presented an adjusted earnings per share. And all that does is strips out 1,500,000 of unrealized hedging losses for effectively for H two, which obviously haven't yet materialized.
12:08 So we've stripped those out to show you the underlying profitability of the business. You can look at the two... The costs for the two operations in a bit more detail. So at CAMLRad, our costs were up period on period by about 12¢. And that was on a consistent... Pretty consistent cathode production. And the biggest factor as I've already mentioned here was the weakening of the Kazakh tenge versus the dollar and that has the impact of increasing our our local tenge based costs. But interestingly, if we look at the processing cost in absolute terms increasing from 8,400,000 to 9,500,000, over 50% of that is related to the ten day cost. And actually the remaining increase of 6% is is obviously half of what inflation is.
13:00 So I think all in all, that's quite a good result given the the sort of macro environment in Kazakhstan. The biggest number there that that stands out a little bit is the payroll. We do give inflation based pay, pay rises to our workforce in January and obviously they're 10 gauge denominated as well. So the payroll, does stand out a little bit there. But all in all, taking the costs into account with the strong copper prices, we've delivered an EBITDA margin of 84% for CUNRAD from the first half of this year. At SASSA, if we first look at the site based operating costs there, they're more or less flat up by 2% or no point $4,000,000.
13:46 Again, this is a good result because the weaker, US dollar obviously lifts our site based costs there by 7% effectively. If we look at a couple of of the lines here, first processing, processing costs increased by just over a million dollars And that was pretty much all attributable to the tailings disposal costs because we now preferentially put our tailings in the dry stack tailings and also in the paste backfill. So we always budgeted and knew that our processing costs would be increasing as we make full use of the two facilities that we've spent the last few years constructing. The other point really to know is a significant decrease in mining based costs. So that's a naught 700,000 decrease. Within that cost is actually an increase of over naught 300,000 for fuel related to increased diesel costs, rates of Hormuz issues, etcetera.
14:39 And so actually, if we added that in and looked to, you know, a similar kind of exchange rate, we would have made savings even larger on the mining area, which is where since sort of the middle of last year that where our focus has been on optimization. So all in all, the site based costs are very positive and I suppose even more positive is that our C1 cost base in absolute terms has actually decreased period on period from 32,100,000 down to 30,800,000. And there we were really helped in terms of the realization costs by those lower treatment charges that I mentioned as well. And we've now got an EBITDA margin of 30%, again, up from the 26% in the first half of last year.
15:27 Very quick on CapEx. Group CapEx for the first half was 9,500,000. It... At SASSA, that was just over 8,000,000. Typical levels of underground development, also some underground equipment. And we also had a raised boring project where we spent 1,400,000 on in the first half and that's completed now as of July. I couldn't imagine we spent 1,400,000 there. And so taking all that into account, we're still reiterating our CapEx guidance of the 14,500,000 to 17,500,000 for both operations for the full year of 2026. Exploration, it's worth pointing out, we spent 1,600,000 on exploration at CAMLEX and CAMLEXD.
16:12 We did maiden drilling programs at two of the projects, Yuzhnoy and Ottiar, and we did a geophysics program at, Cheyandi. And we are expecting to do some more drilling. We're waiting for some ASIA results, but we're expecting to do some more drilling in Kazakhstan this year. So we do still expect to be spending around the 3 to 3,500,000 mark, on exploration in Kazakhstan this year as well. Just turning now to the balance sheet. Just looking quickly at PPE, the difference there between the $239,000,000 and the $226,000,000, obviously reflects depreciation deducted plus CapEx and there's also a little bit of adverse foreign exchange movements as well.
16:58 The investment in associate that represents the total of our investment to date in Aberdeen Minerals, which includes 1,200,000 of warrants, which we exercised in Q1. We've since agreed to exercise the remaining just under $1,600,000 worth in Q3. So that should hopefully be concluded the paperwork should hopefully be concluded in the next couple of weeks. Pleasingly on the balance sheet, can see that we've got a reduction in inventory of 3,000,000 and that's really due to a lot of pushing that we've been doing at SASSA and a lot of work to purposefully try to reduce the inventory there, which had built up somewhat. And from around about this time last year, our inventory is now down by approaching $5,000,000.
17:48 So that's a real positive story in one of the areas that the finance team has been working on at SASSA. I should also point out in the equity and liability section, we had the share premium cancellation that was completed announced in April, and that really transferred that $2.00 6,000,000 from the share premium account to retained earnings. And that really helps us to distribute dividends for the future. So that shows that big swing in the equity and liability section of the balance sheet that we've shown then. And then just finally to highlight that we've ended the period with over $97,000,000 of cash and we also have nought 400,000 of restricted cash and we only have borrowings of 900,000 in a small Macedonian overdraft.
18:38 So we've got a very strong balance sheet. Final slide from me. I'm just looking at the waterfall of our free cash flow in the first half. So cash generated from operations of 71,400,000. The 17,300,000 dividend was a 7.5 p $20.25 final dividend. In terms of income tax and withholding tax, 19,800,000 there. That's less cash tax than you see on our, income statement. On the income statement, we reflect in the effective taxes of the period of profits, whereas in cash, we're paying, our taxes based on last year's profits. So we plan to catch that up from, August to December of this year. But that number does include the full amount of withholding tax of the 10,000,000 that we, brought back to The UK without... That we paid, sorry, to bring our dividends back to The UK.
19:37 And that compares 6,000,000 last year, higher because of the higher commodity prices and also because of the increase from 10 to 15%. CapEx exploration Aberdeen investment, we've already talked about. Just as a reminder, buyback of 4,800,000 was the last part of the 10,000,000 share buyback that we committed to do at the same time last year when we announced our interims and we completed that in March.
20:09 Adding all of that up, that brings us to cash of the 97,000,000, which excludes the 4,000,000 restricted cash, but does include that 900,000 overdraft facility. If we look at the free cash flow and our adjusted free cash flow, which is what we base our dividend calculations on, we've added back on half of that withholding tax just to split that evenly over the two six month periods of the year. So we've added that 5,100,000 back on. And so that gives us an adjusted free cash flow of just under 47,000,000 and that's an increase of a 189% versus h 01/2025.
20:48 So I will hand back to Gavin to run through the operations. Thanks, Therese. We'll start with CONRAD, which was sort of looks like it was steady as she goes with a very similar production of copper cathode to what we have experienced in 2025. But must commend the team there for, you know, producing this copper under extremely harsh winter circumstances. We had a lot of a lot of cold weather this year, so, you know, really fantastic effort from the from the people out there. We're on track to meet our full year 2026 guidance of between 12,013 tons. And with the copper price being where it is, we will continue to benefit in terms of achieving that guidance from those higher commodity prices that we've been enjoying for the last seven months or so. We did have one LTI, which I mentioned at the outset. We always try and learn from these things. Fortunately, in this case, it wasn't too serious, but we are... Know, we always change policies, procedures, and the operating procedures in order to mitigate against anything like that happening again.
21:52 And the last point I'll make here, you know, since we started producing in 2012, CUNRAD has now produced over a 185,000 tons of copper, which was a great achievement for what is quite a unique asset. If we turn to the outlook
22:08 for CAMLRad, the challenge here is to, as I said, continue taking advantage of these high copper prices and the strong operational performance in the first half. And operational focus going forward is really maximizing the efficiencies of the project. You will have noticed that our guidance has moved downwards from 2025 to 2026 and probably given the sort of remaining copper in there trend downwards as well. So we just gotta make sure that this asset is as efficient as possible moving forward. We have updated and made no reserve actually for for CAML that was that was published in in August, and that's in support of the Cygnus transaction, which is both chalk and forty three one zero one compliant, which has to do with the TSX.
22:56 And that chalk ore reserve effectively says that there's 407,900 tons of contained copper. You know, being a unique operation, we're not gonna ever extract that whole lot. And what we do say is that we're going to, on our original plans, extract a further 75,400 tons of copper, which will see us out to the end of the license in 2034. But looking at that graph that's in the center of your screens, we can see that the actual recoveries on the Western dumps in this case has outperformed our forecast recoveries and it certainly has outperformed on the Eastern dumps historically as well. So it's reasonable to assume that that 75,400 is a minimum amount of copper that we'll be extracting from those dumps out to that date. It does also suggest that there is potential to extend beyond that date should we achieve an extension to that license.
23:47 Now I just want to mention the solar
23:48 plant here. I think Louise was talking about some of the cost pressures in Kazakhstan. We are going to see electricity prices going up slightly from $06 to $07 a kilowatt hour. So it makes our solar plant ever more valuable. It's already produced 18% electricity consumption for the first half of the year. And the second half of the year is generally higher given that through the summer months there as well. So pleased to that performance. Moving on to SASSA. We're beginning to see some of the benefits of the full review of the business that we conducted in 2025. We've seen ore mined going up by around 8,000 tonnes for the period, which is a good result. But more importantly, we're actually seeing the grades that we're achieving out of that ore higher as well, which has led to that 5% extra zinc and 6% extra lead versus the corresponding period in 2025.
24:40 What that's telling us is that the miners and a lot of these initiatives we're putting in place are sort of coming into effect. The miners are mining more efficiently. We are getting more kind of bang for our buck almost literally out of the explosions that we do underground and less over break, which means less dilution and therefore that's why you see in those grade lines on the table on the right hand side, those are moving upwards to what we would more reasonably expect versus what we achieved in 2025. Again, we put mineral resource and ore reserve statements out in August this year, again in support of the Cygnus transaction in both Jawke and 40 Three-one Hundred 1. There's no change actually from the resources and reserves that we published in March this year for Sassa. The improvement program is continuing. We're to emphasize mining and cost control moving forward. If we go to the next slide, we can talk in a little bit more detail about that.
25:33 So, you know, we continue to strive for this improvement at SASSA basis. And what we've done so far has really been around productivity, staffing levels and costs. I think we reported in March that we'd lost around 11% of our colleagues at SASSA under a sort of staff sort of reduction program there. They agreed to leave the business. And we're going to continue with a number of these initiatives as we move forward. But in H1, we're really concentrated on the mining. As I said, increase in advance per blast there. We've gone from 2.1 meter average to 2.8 meter average in the lateral development, which is really good results. Grade control that's around understanding the geology better and planning and allowing our miners to plan their activities better without the surprises that were confronting us last year.
26:27 And then importantly, we've gone through part of the cost control and inventory reduction program and that's on the balance sheet is the $3,000,000 reduction in inventory there as well. So moving forward, we're to continue with these initiatives mainly around executing on the life of mine plan that we published in March this year as well. And also, you know, making sure we hit budget. We've got some improvements we're chasing on maintenance, mainly around data capture and planning there as well. And again, bolstering the team to make sure that we've got you know sufficient planning, production and drilling blast expertise just to assist with the execution of the underground mining and ensure that it continues the upward trend that we've seen here. So overall, we're very pleased that we started to see some of the results of the reviews that we did in 2025 at SASSA, but still a long way to go. We're certainly not taking our focus off of that just yet.
27:20 Sustainability remains a core part of our business. The license to operate is really crucial to any mining company. I'll just run you through a few of the highlights from the period rather than going through the slide in much detail. 2025 on the health and safety side, we conducted a full review of the health and safety culture within the business and started implementing that into 2026. Was workshopped amongst the sites, a lot of input from site there and some consulting there as well. That'll hopefully continue the good safety trend that we hope to continue with. Community investment continues mainly in education infrastructure. And importantly, SASSA Foundations Business Acceleration Program that we've been talking about for a while is now up and running, we've got four businesses that we're backing in the local region there as well.
28:08 The environment obviously is crucial that we care for that. We've completed a biodiversity management and climate resilience review across both operations. We're updating our closure plans now that we've completed all the capital projects at SASSA and they're also about five years out of date. And then importantly in terms of tailings at SASSA, we've managed to put 77% of our tailings either back underground onto the dry stack tailings landform which preserves TSF for the wet tailings facility through to 2034 and beyond.
28:42 So in terms of outlook and capital allocation, we've made good advances across the entire exploration portfolio. In Kazakhstan, we have two companies there, CAML XD and CAML X, both of which are targeting high grade base metals prospects in the region. CAML XD is 100% owned and very importantly, we've just signed an option agreement or in the first half signed an option agreement over a very attractive exploration project, which is really an elephant country in in Kazakhstan, which is a host to a lot of these sediment hosted copper mines that has made Kazakhstan a famous copper producer really. So option is for three years, that extension for one year. It's also adjacent to one of our current projects that we have in CAMLEX and the field work has started.
29:27 We've delineated drill targets and we've got a drilling program of 4,600 meters set up that'll start at the second half of this year and go over into 2027. So very excited about that prospect. CAMLEX, slightly longer journey there, but we've got to the point in the last six months that we've actually drilled two of our prospects. It took a couple of years to get to that point, which is actually pretty quick for greenfields exploration. We've drilled 4,300 meters across 15 holes at Ochoa and Usnoyar. At Ochoa, we've identified polymetallic mineralization, which looks like it's got visible lead and zinc mineralization there. And at Usenoya, we've confirmed that there's a copper molybdenum mineralization occurring over quite a long strike length of 1.2 kilometers. So that's pretty exciting as well.
30:13 Unfortunately, we sit here without the assay results, which is really the proof of pudding. We're all waiting for those to come in during quarter three this year. So keep an eye out for the news releases on that. So if they are successful, then we'll be looking at more drilling at both of those prospects. Last but not least, Cheyandi in Kazakhstan, where geophysical surveys that we completed, that data has been interpreted with drill targets being generated and drilling will decide whether or to drill those in the second half of this year as well. Aberdeen Minerals is the minority shareholding that we have in the copper nickel exploration up in Scotland. They completed their phase three drilling program in the first half of twenty twenty six and on the basis of the results there, we've elected to exercise the balance of our warrant instrument.
30:58 That's £1,150,000 It'll take our shareholding up to just shy of 39% and that'll finance phase four of drilling. So best of luck to Fraser and his team up in Scotland with that for the rest of the year. The other key element to our growth is the proposed transaction of Cygnus Metals. We've made a lot of progress since we last spoke and we announced that in June. There's a rather large document called the Scheme booklet that was published by Cygnus on the August 13 and is accessible via our website as well, which sets out a lot of detail of the Cygnus business and also prospectus level disclosure on CAML as well. And that CAML disclosure has also been published separately into a UK circular that came out on the August 14. Both of those documents are there to inform shareholders for their votes that will be coming up in the CAML case on the September 2.
31:52 So please, if you haven't voted, please consider doing so. And on the September 18 for Cygnus shareholders. Those are the two main approvals that we require in order to go ahead. And if all does go ahead, the ownership will transfer to CAML on the 10/05/2026. So what Cygnus will do will add a super asset to to CAML's portfolio. It is high grade copper gold. It adds more copper exposure to to CAML in a tier one jurisdiction and provides significant geographical diversification as well. And also and importantly has a lot of exploration potential attached to it too. We'll be bringing our own underground and operational expertise to bear here plus also our construction expertise and advancing the project towards its final investment decision as fast as we can. So just to remind you what we've bought there.
32:43 It's a sequence of copper gold deposits located in Northern Quebec, which is as I said really good jurisdiction. Measured and indicated mineral resource of 6,400,000 tonnes at really good grades 2.3% copper, 0.8 gram a tonne gold and 7.6 gram a tonne silver and a similar $8,500,000 of inferred mineral resource. There is a PEA that was done in 2022. Cygnus has started another PEA, but has basically been focused on drilling so it can get more and more of the resource into the indicated category so that it satisfies Australian regulations for the publication of a PEA. And CAML will effectively be taking ownership and authorship of that PEA once we once we secure the project, hopefully, in in October.
33:32 The... Because it's located quite near a town of Shapurguma, there's a lot of existing infrastructure in place. There's roads. There's power. There's water. And also importantly, it's a brownfield site to that little photograph on the top right showing you what used to be a 900,000 ton per annum copper processing facility, which will require quite a lot of refurbishment, but it does accelerate the permitting timetable because we've already got a brownfield site there. And adjacent to that, you can't see that in the photograph, is actually a tailings facility, which is which is actually a live tailings facility right now as well. So it'll also assist us with our permitting efforts for Chibugamo. We talk about the sort of resource upside or the the exploration upside here now. The region has got a really rich mining legacy behind it, and it's produced over a million tons of copper and three and a half million ounces of gold historically. So we are again in elephant country here. If you look at that little schematic map, that little long section map there, you can see the five primary deposits that we're talking about acquiring here, plus the copper and mill in the middle of that.
34:40 And then there's an 18 kilometer strike length trend that Cygnus has secured all of the land package along that which provides us with a lot of drill targets. So all of those little red arrows you can see is where we've got the known deposits open at depth, also along strike plus also targets in between these deposits that we'll be testing with the drill rig over the next few years and increasing the size of that resource inventory there as well. So you know, very transformative transaction for CAMLair, but also importantly for Cigna shareholders. You know, it would be putting that asset into a company that has the wherewithal to develop the asset and then ultimately construct it without dipping into the market again and diluting them even further. So we think a really good win win situation for shareholders all around there. So finally, our outlook for 2026 is to take advantage of these continued higher prices for copper and zinc and that means keeping the assets on track to achieve our full year guidance for both copper lead for each of copper lead and zinc.
35:41 Key are the shareholder votes I spoke about on the September 2 and the September 18 with transaction expected to be complete in October 2026 if those votes go the right way. We do have a TSX listing underway. That's why we've updated the reporting of the resources and reserves of both assets to 40 three-one 101 standards. And assay results, really excited about those coming in from Kazakhstan over the next few weeks. So keep an eye out for those. In terms of capital allocation, I'm very pleased with that half one dividend of 8p. It's 40% of adjusted free cash flow, continuing with the dividend repayments to our shareholders as part of the capital allocation that we look to continue with going forward as well. We've got cash in the bank of $97,200,000 CapEx, we completed all of the capital projects at SASSA. So we're really looking at sustaining CapEx only moving forward on both SASA and Kunrad.
36:37 And we, as Louis said, sticking with our guidance there for 2026 as well. And the cash resources that we have now and will continue to build are sufficient to fund our exploration in Kazakhstan, you know, pay for the Aberdeen warrants, advance the Shibugumo project, plus also continue with good shareholder returns. So, you know, we think this set of results hopefully sets us up for the next six months and going forward. So I'll stop there and invite questions from all of you in the room. Thank you. So, Richard, do you want to read the questions out? And we'll... As they can do Okay. Well, we've got some questions in. First question from Jeffrey h. When is the overpaid tax actually going to be received?
37:25 The results narrative keeps repeating. It will be recovered by dialogue offset, but the amount owed is increasing. Yeah. I can answer that one, Jeffrey. No. It's a very good question. I think sort of part one of that answer is, I think the balance sheet date was a little bit unlucky because we have since received around 2,000,000 of that. It's actually VAT that's... That that were owed back. And yeah, we've received around about $2,000,000, since that balance sheet date. But your point is well made. And,
37:55 while the narrative does say the same, we have reenergized our efforts into getting that VAT back. We actually commissioned some work study as to the best ways to approach doing that, in the first half of this year, remains the best way being to try to make sales locally. So what we've been doing is we've gone out to various potential customers to sense their appetite. And then we're doing some analysis as to how much material we could and should sell per quarter in order to receive a reasonable amount back while still, exporting the majority. And obviously, there may be a trade off between, getting the VAT back and actually maybe achieving a slightly lower price in country. So there's a lot of analysis that we're doing.
38:42 And obviously I can't give you results as now, but just to give you comfort that the efforts have been reinforced to try to recover some of that VAT. Alright. Next question is from Mark a. And Mark asks, what pressures will bear on the business as both CAML and SASSA are due to expire in 2034? That's a good question, Mark. I think... Look. A lot of the growth that we're talking about here is effectively being put in place now to ultimately replace what our finite resources are at both Kunrad and SASA. So I think it's just natural for a mining company to do that. You know, all of these resources that we exploit from the ground are finite after all, so we need to work hard in order to replace those.
39:32 You know, however, what I would say is that the 2034 date, whilst, you know, that's where the reserves at Sassa take us to, and that's where the license at Kunrad takes us to. We are working hard at Sassa to drill out additional resources, and we're trying to see whether we can bring that into the mining inventory as well by converting it into a reserve. And that'll take a couple of years. Plus also at CONRAD, as I said earlier, with that outperformance, there will come a point where we'll be making an application to the state to extend that mining license out beyond 2034. But I think in terms of the horizon from here on in, we can certainly, you know, assuming the Shibugamo or the Cygnus asset sorry, the Cygnus transaction, the Shibugamo asset get brought to book Over the next few years, we'll be replacing a lot of the production with that asset, plus also the exploration upside from the Canadian assets and also in Kazakhstan.
40:28 We would look to replace any production that we lose from either Conrad or SASA with those. Alright. Thank you. Next question also probably for Gavin. Ben g asks, if current commodity prices and operational performance continue, should we expect continued higher payouts? Well, I think the the payout today is, like I said, right in the middle of the dividend policy range. And that range has been sort of devised in order to give us the flexibility to allocate capital appropriately. So if we see an opportunity to invest money that'll enhance our shareholder value via capital growth, for example, investing in a study at Shibugamo and investing in CapEx there, then we'll prioritize that if we think it's going to get you more than a dividend would.
41:19 But what we wouldn't necessarily do is move outside of the policy into higher payouts. We had that scenario develop over a few years, couple up until, I guess, probably March last year. And the conscious decision was made by the Board to bring the dividend payouts back in line with the policy so that we had that flexibility to allocate capital to our shareholders and then to future investments in the business.
41:48 Hi. Thanks. Steve Y asks, this is a question about Silverstream. Can you just clarify when we are expecting to clear the $14,000,000 in Silverstream via silver deliveries and if this reduction benefits from higher silver prices going forward? Yes, Steve. It's again another good question. We inherited the Silverstream when we purchased SASSA. It's not necessarily an instrument we would have been sort of racing to get ourselves into. Now I can understand your question. And from an accounting perspective, ultimately, that liability will reduce. But the unfortunate part of the way those streams are constructed, and it's not just ours, it's every stream in the world in royalty is that these things are perpetual. So it's there until the end of the life of the mine, I'm afraid.
42:34 Thank you. Well, that's actually all the questions we have, which hopefully means that the announcement and and presentation satisfied everyone's questions. Oh, well, Matthew's Matthew's popped in at the the bell here. Yeah. Matthew h. Well, yes. Okay. Would we consider moving to the main board once the Cygnus transaction is complete, given the combined market cap would be within striking distance of the FTSE two fifty index? Yeah. Another excellent question, Matthew. Look. We... We've currently focused on, closing the transaction over the next few weeks and then getting the TSX listing working for us, at which point we would certainly consider having a look at the main board. But I think for for our team who's been working, you know, pretty much flat out over the summer, giving them another work stream right now and making the most popular person in the world.
43:29 That's great, guys. If I may just jump back in there, I can see you have addressed all those questions for investors today. So thank you very much, Gavin and Louise, and thank you, Richard, for sharing the q and a. But Gavin, before we direct investors to provide you with their feedback, which I know is particularly important to yourself and the company, could I please just ask you for a few closing comments? Sure. Well, look, thanks again to everybody for attending today. We find it a really useful way of interacting with our shareholders. What I'd the message I'd like to for you to go away with today is that we've we've improved slightly the the operational performance at at SASA, and we continue to focus on making more improvements there. What we don't want is any kind of own own goals in this current commodity price environment. But also, the company is starting to offer our shareholders a lot of optionality in terms of the growth
44:19 aspects here, both in terms of the exploration at Kazakhstan and in Scotland, but also through the potential acquisition of Cygnus. So hopefully, next time we talk, the complexion of the business will be a little bit different and a lot more interesting in terms of news flow and exciting prospects going forward. But thanks again for attending. Fantastic. Thank you once again for updating investors today. Could I please ask investors not to close this session as you now be automatically redirected to provide your feedback which help the company better understand your views and expectations. On behalf of the management team, we would like to thank you for attending today's presentation, and good afternoon to you