24:35 Thank you, John. At this moment, we are essentially in a current maintenance and exploration phase. So The employees that we have working at Bunker Hill right now are a drilling company, a mining contracting company that is working on supporting and conducting care and maintenance activities, and the geology staff and the management staff. So at the moment, we don't have, that's the activity that's going on. And to answer your question directly, there's no union at the moment at Bunker Hill. Thanks Sam. Ron May asks, do you have plans for a dividend for common shareholders?
25:25 Thanks Ron. So I think the short answer is no. And the reason for that is the number that you see on the screen. So that 46% after tax IRR there is the level of return that we think this project at a minimum, we can provide to our investors. And we think that is a much better sort of use of the cash that we'll generate through Bunker Hill, at least for the interim, before we even think about dividends. So for those that are sort of not financial experts, what that 46% after a tax IRR is effectively a compound annual rate of return. What we're effectively saying in the PEA is that if you invest $42 million with us today, that's going to be compounded at 46% per year and you're going to get $240 million back at the end of 10 years, over the course of that 10 years. So we're pretty excited about that rate of return. And certainly as we grow the company, which we plan to do, and eventually as Richard outlined, you know, is to be a, you know, a multi-asset mining company, because we think we have the team to build that, we will think over the long term about dividends, but certainly not at the moment.
26:38 Thanks, David. Karim Usunmez asks if there are any issues with metallurgy in regards to penalties or milling problems. None that we see at this time, Karim, is the direct answer. And there's 2 things that are supporting that. We have done some MAT test work and the preliminary results indicate metallurgical performance much in line with the metallurgical performance over 100 years of operating life. And in that period of time, there were no metallurgical challenges that were not able to be addressed. The recoveries are high, the concentrate is relatively clean, and we don't see any problems in that area. Great. Michael Hebner asks, I see HECLA had a problem with a judge. How are we doing with community and legal?
27:33 I'll turn it over to Brad for a moment to answer this and give a little bit more flavor on what we're doing with the community. But what I would say is I just want to speak to the company that we're building and our approach to stakeholder engagement. And that's really one of radical transparency. What we espouse as a company is that we're going to perform at a very high level and we're going to share that performance openly. And then we'll have an open conversation and a dialogue about how we're doing. And, you know, with that context, Brad, is there anything else you want to add on our relationship and ongoing community discussions?
28:21 Yeah, I think, thanks Sam. Number 1, I think that Bunker Hill as a mine and as a business entity means a lot more to the Silver Valley community than just a mine that produces lead, silver, and zinc. And you couldn't ask for a more supportive community to try and restart a mine in. The amount of support and enthusiasm that we felt from the day that, you know, and Sam and I both live and work in Kellogg. We know that community, we interact with them every day. And there is not 1 doubt about whether the communities of Kellogg, Wardner and broader Shoshone County want this mine back in production. We know they do and we're doing everything we can to meet that objective.
29:20 Thanks, Brad. Thanks, Sam. Mark Lodak asks, what your plans are for capital raising to fund the $42 million? Thanks, Mark. So now that we've got the PEA behind us, we're squarely focused on exactly that question. And so we definitely have plans that we are kicking off here. You know, the good news is that we've got quite a bit of demand from different ends of the market. There's equity investors who are looking, you know, eager to invest, traditional debt providers, offtakers, royalties and streamers. Those guys certainly won't be our first part of call, but they need to be part of the conversation. And so the good news is we've got some pretty robust numbers here that's attracting, you know, that lender appetite. So we'll be embarking on that concurrent with progressing further technical studies to continue to de-risk the project.
30:13 And we think this thing is going to be very financeable. So stay tuned over the coming months. Great, thanks Dave. Tyler Hillegoss asks, could you discuss the processing component of the mine? How or better yet, where do you intend to process your ore? Yeah, thank you Tyler. So the processing of the ore, what we will be doing is we will be crushing, grinding, and then running that material through a differential flotation plant, where 2 concentrates will be generated, a zinc concentrate and a silver enriched lead concentrate which will then be moved to market and sold. Where we will do the processing is where we are going to have quite an innovative solution. We're going to build and operate the processing plant in the underground.
31:06 That's going to reduce the amount of effort required for material haulage of the ore. And in addition, we will be then well-placed to refill the mine with a paste fill, for geotechnical fill to support the mining, but also thickened paste tails deposition, which is going to be deposited in a lot of the old workings, which is the genesis point for acid mine drainage generation, which will then mitigate that in the long term over time. Awesome. Mark has another question. Mark Blodek. Any plans to try and combine the bunker with the nearby Crescent mine that is currently closed? Sam, I'll take this one. Thank you.
31:54 Thank you very much, Mark. It's an interesting question. If we look at the 2 mines, which are, as you know, very close to each other. In fact, they're joined underground at the 23rd level by an underground crosscut. They share 1 mine tool. The water that is treated for both mines comes out of the Bunker Hill Kellogg Tunnel and is treated in the water treatment plant. Crescent produced it's a different concentrate copper silver concentrate from what Bunker produced and as you said it's in care and maintenance at the moment and we obviously have a team that is very focused on the delivery of value at Bunker Hill right now but it's selected for their ability to grow the company through bunkers, the development of bunkers, resources and blue sky, but also to grow the company through inorganic growth acquisitions.
33:01 And it makes a lot of sense to have bunker and crescent operating as a single entity So all I'd say in answer to your question is Do we think about it? I think anybody who looks at the Silver Valley and looks at these 2 properties, we'll be thinking about it in the same way. And we'll see whether that logic leads to a change in that direction. But at the moment, we're very focused, as you can see from the presentation and the team here, on generating value at bunker. But thank you very much for that very interesting question. Thank you, Richard. Richard Vigil asks, what percentage of mine production is or will be overhead cut and fill, and what percentage is or will be long hold and stopping over the life of the mine?
33:55 Now, thank you, Richard. So in the PEA, one of the things that, one of our approaches in the PEA was to make sure that we were relatively conservative in our technical assumptions and approaches. So what that means is that the ratio and the focus of mining method in the PEA for the PEA was more heavily weighted towards cut and fill. You know, that weighting is right around 75% cut and fill, 25% long hole stoping. Certainly as we move forward and advance the engineering, you know, we'll be looking to take opportunities to move to a more, a higher proportion of long-hole stoping. I think that we will be able to do that.
34:43 Certainly the ore body geometries and the resource geometries indicate that that is possible and we'll be moving that direction. Ideally you know I would like to get a majority of the mining taking place through the long hole stoping method. Obviously that comes with an increase in productivity and a reduction of cost, which is absolutely the way that we want to move the mine plan, but that will be on the back of technical work that supports that. Great, thank you. Tim Olson asks, where do you anticipate the cons would be processed, in US or foreign? That's a good question. The good news is that we've got multiple options on that.
35:29 So there's smelters, certainly in North America, one of them being the trail smelter that's owned by Tech Resources, that's not too far away from us. But certainly as part of the PEA, we examined and factored in the ability to ship the concentrate anywhere worldwide really, and that includes overseas, across the Pacific Ocean. Certainly, you know, one of our priorities, as Brad can speak to, is to try to achieve that sort of 0 footprint and carbon neutrality that we keep talking about in this quarter of our thesis. And certainly that will come into the equation in reality as we think about marketing the concentrates. The good news also on our concentrates is they're quite clean. We don't think that it will attract any substantial or any penalties really at all.
36:17 And there'll be a lot of demands from smelters. So that's certainly something that we'll be evaluating as we move forward here to factor in both the environmental footprint as well as obviously the economic one. Thanks Dave. Matthew Huff has submitted this question. Good morning, guys. You mentioned in a prior call plans to purchase the water processing plant and to be able to use that asset to generate revenue for other mines. Is that CapEx included with the $42 million? And what is the outstanding EPA past and future liability? That's an excellent question. And Brad, I think you're probably best placed to answer that. Well, the potential for the purchase of the water treatment plant is an ongoing discussion.
37:03 That'll be dynamic. What we are doing is conducting a range of different studies that determine the best way in which to treat that water, which may or may not include the central treatment plant. If we were to acquire the plant, of course the terms of that discussion have yet to be determined, but they are not included in the 42 million dollar capex that was published in the PEA. Thanks Brad. John LK Allen asks, metallurgical testing performed by what organization? General description of the processing operation would be informative. What about plant recoveries? Smelter acceptance of the anticipated processing products? Yeah, thank you. Thank you, John.
37:50 Our metallurgical work is being conducted by RDI and our QP on the metallurgy is Deepak Mahotra. The general description of the processing operation, It is really a pretty standard, you know, base metal flotation flow sheet, you know, so crush, grind, regrind and, you know, differential flotation for making a zinc concentrate and a silver enriched lead concentrate. Plant recoveries, 92% on zinc, 91% on silver, 91% on lead. Almost all of the lead reports or almost all of the silver reports to the lead concentrate, right around an ounce per ton of concentrate reports to the zinc concentrate.
38:49 And as Dave said, you know, we don't see any penalties or problems. All indications are we're going to have a very marketable product. Great, thanks Sam. We also have had some questions come in ahead of the summit, so I'll get into those now. The first question essentially goes along the lines of Should the audience be thinking about Bunker Hill as more of a base metals mine or a silver mine? I'll take that question. Thank you. So historically, over its 100 year operating life, there is no doubt that Bunker Hill was a base metal mine. It was fundamental and a key supplier to the Industrial Revolution, to World Wars. It was a cornerstone asset of America's rise to its place in the world today as a base metal producer.
39:48 Our resource at the moment would quite clearly be considered a base metal resource. What we are doing and what our strategy is, is with the understanding of the potential for silver to exist in much larger quantities at Bunker Hill than is reflected in our resource, we're focusing our exploration effort in that space to, over time, move the revenue stream to be a more balanced position between base metals and silver with the ultimate intent of having over 50% of our revenue generated from silver. Great, thanks Sam. Another question that's come in is what are you planning to do to improve your liquidity?
40:37 I'll take that one. So quite a bit. As our investors will know, one of the processes that we still have ongoing here and we think will be successful here in the coming weeks is the TSX Venture migration. So we're currently, our primary listing is on the Canadian Securities Exchange. We're still in the process with the TSX fee to move on to that exchange and you know we're quite optimistic that will be resolved over the coming weeks here and perhaps even more importantly on the US side as our US investors know much to their frustration and ours is that it's it's currently not the easiest to trade our stock in the US, given that we are on the grey market there. So we are in discussions with FINRA right now, we are working with a broker to remove that caveat emptor, so that our investors can actually properly trade our symbol in the US, which is going to be quite exciting and we think is going to have a very dramatic impact on our liquidity.
41:43 And that in turn will have all sorts of knock-on, positive knock-on effects to our valuation, to research coverage, etc. So certainly stay tuned for news items on both of those fronts. Thanks, Dave. Another question that's come in is what kind of restart financing options are you looking at? Yeah, thank you. So I think, you know, somewhat similar to the live question that came in earlier and I think we'll look across a range of products. We'll look at sort of straight debt options. We will look at, you know, offtake options, stream and royalties and obviously equity. So we've got a very supportive shareholder base, consisting of a number of longholders that would be very happy to help us move the project forward and we'll be certainly working with them as well as traditional lenders to come up with the best solution that's the least dilutive and the best cost of capital to get this mine back into production.
42:45 Thank you again. Another question that's come in ahead of time is when do you realistically think you can be in production? I'll take that. You know, to a certain extent, let's talk about the critical path to restart this mine. So we certainly have additional technical work that's required to advance, in particular, the processing to a construction-ready state. That's ongoing. Dave has spoken a couple of times about the need for financing. We will need to be able to finance this restart. And I think that what I would say is when I look at it, and we talk about this often, is that post-restart financing, the plan is indicating that in that 15-month time frame, you know, we will be up and in production. So, to a certain extent, it depends on the completion of the financing, the advancement of some aspects of the technical work beyond the PEA status.
43:54 And that's all work that we are currently engaged with and that we expect to have completed later this year. Great, thank you, Sam. That's all the questions we have for today at this point. I'd like to thank everyone who submitted questions as well as I'd like to thank... Oh, go ahead, Richard. That's okay, Cam. I just wanted to make a couple of other follow-on points, if I may. I know that with no questions, that's slightly shooting in the dark, and if everyone will bear with us. I just want to emphasize a couple of things. When you look at this restart, this is just taking hold of the resources that in so many respects were gifted to us by those that were mining in 1980.
44:43 It's like a bite-sized chunk into the mine so that we can generate with the lowest capital injection, leveraging the expertise of the team on all of the historical infrastructure, which includes those resources, in ways that maximizes short-term cashflow. This allows us to unlock all of that potential that our predecessors back in 1980 knew existed, as well as settle a number of commitments locally with the EPA and others. And it also absolutely affirms this team's status as an operator within the Silver Valley with the Silver Valley community.
45:30 And again, my point earlier in emphasizing Jeff, Steve, Josh, and Mike, and the questions that you brought up some of you about the workers in the Silver Valley is I just want to make this very important point. It's in my experience in life, as well as in mining, the best ideas come from those who are actually moving the rock and moving the earth. And that's exactly what we found here. So what we've got is we're building a team that extends beyond just the executive team that you sit in front here but incorporates all of that human talent so that all of us Can actually deliver upon the promise that's in front of you at the moment.
46:18 And then one other piece to this very fascinating and exciting puzzle is our partnership with the United States Environmental Protection Agency and their equivalent regionally the IDEQ and all parties involved there. We see ourselves partnering with those agencies in this Bunker Hill restart, because of course the work that they have done, contentious to some as it has been, has been so important in transforming the environment within which we operate to the remarkable standard that it is today. And we wish to work with those parties, and Brad's doing a wonderful job, along with the rest of the team, to unlock this remarkable potential for all of those that are involved here.
47:07 The financial investors, the workers, the community stakeholders, those who are interested in the downstream and the Coeur d'Alene Lake, the governor, et cetera, to really ensure that this team and this asset delivers on all that we know that it can. So, Cam, I just wanted to make those points at the end there and ensure that all those on the call realise that all of us who happen to be sitting here speaking for Bunker Hill, represent a far larger group of stakeholders, all of whom are now moving in the same direction, which will deliver these numbers that you see on the screen as a minimum. So thank you very much for your time, and I'll hand it back to you, Cam. Thanks, Richard. That was awesome.
47:53 Thank you, everyone. Amazing presentation, some amazing questions from the audience, very insightful answers. I'll remind the audience that if you didn't get a chance to get your questions answered, or if you think of 1 after the summit, we're gonna be sending out a short survey where you can leave your contact information and the Bunker Hill team can reach out to you directly. You can also find more information, of course, at bunkerhillmining.com. I'll hand it back to the team at this point for any final words that they want to say. But thank you again. Said it all. Thank you, Cam. Thank you, everybody. Awesome. Well, thank you, guys. Everyone stay safe. Have a great day. And That's a wrap then. Thank you. Cheers, Jeff. Bye.