Massey Energy Co

Massey Energy — Investor Day (September 2005)

51 slides from Massey Energy's investor day presentation, Sep 28, 2005

  1. Slide 1: Production Overview

    Slide 1: Production Overview

    Production Overview Chris Adkins Senior Vice President and Chief Operating Officer September 27, 2005

  2. Slide 2: History 101

    Slide 2: History 101

    History 101 Which United States President was a “Mining Engineer” Herbert Clark Hoover 31st President 1929-1933 Translated De Re Metallica From Latin Stock Market Crash

  3. Slide 3: Chaos Cannot Interfere with your Daily Production Routine

    Slide 3: Chaos Cannot Interfere with your Daily Production Routine

    “Chaos” Cannot Interfere with your Daily Production Routine

  4. Slide 4: Why Massey?

    Slide 4: Why Massey?

    Why Massey? Experienced Management Team 2.3 Billion Tons of Reserve New Properties with Higher CTPF Utilize a Broad Spectrum of Low Cost Mining Methods We Enjoy Being “Miners”

  5. Slide 5: Operations in Numbers

    Slide 5: Operations in Numbers

    Operations in Massey 21 Operating Resource Groups 49 Miner Sections 4 Longwalls 17 Preparation Plants 16 Surface Mines 7 Highwall Miners

  6. Slide 6: Who We Are: Chris Adkins

    Slide 6: Who We Are: Chris Adkins

    Who We Are Chris Adkins Chief Operations Officer 21 Years of Experience

  7. Slide 7: Drexel Short

    Slide 7: Drexel Short

    Drexel Short Sr. Vice President of Group Operations 27 Years of Experience

  8. Slide 8: Dwayne Francisco

    Slide 8: Dwayne Francisco

    Dwayne Francisco Vice President of Underground Mining 15 Years of Experience

  9. Slide 9: Mike Snelling

    Slide 9: Mike Snelling

    Mike Snelling VP of Surface Mining 24 Years of Experience

  10. Slide 10: Richard Zigmond

    Slide 10: Richard Zigmond

    Richard Zigmond Director of Preparation 33 Years of Experience

  11. Slide 11: Keith Hainer

    Slide 11: Keith Hainer

    Keith Hainer Director of Maintenance 16 Years of Experience

  12. Slide 12: Sid Young

    Slide 12: Sid Young

    Sid Young Underground Production Manager 35 Years of Experience

  13. Slide 13: Years of Mining Experience

    Slide 13: Years of Mining Experience

    171 Years of Mining Experience

  14. Slide 14: Operating Resource Groups

    Slide 14: Operating Resource Groups

    21 Operating Resource Groups

  15. Slide 15: Operating Resource Groups

    Slide 15: Operating Resource Groups

    21 Operating Resource Groups Consist of President and Man agement Group Many cases they share some G&A staff

  16. Slide 16: Miner Sections

    Slide 16: Miner Sections

    49 Miner Sections Massey Energy,

  17. Slide 17: Miner Sections

    Slide 17: Miner Sections

    49 Miner Sections Projected to produce 38% of Massey Production 19 million tons annually 27,000 feet per day 14,500 shuttle cars per day

  18. Slide 18: Longwalls

    Slide 18: Longwalls

    4 Longwalls

  19. Slide 19: Longwalls

    Slide 19: Longwalls

    Longwalls Projected to produce 11% of Massey Production 5.5 Million Tons Annually Equivalent to 2 million continuous miner feet One of the safest mining methods Would require 15-20 additional miner sections and approximately 500-700 additional people

  20. Slide 20: Highwall Miners

    Slide 20: Highwall Miners

    Highwall Miners

  21. Slide 21: Highwall Miners

    Slide 21: Highwall Miners

    Highwall Miners Projected to produce 5% of Massey Production 2.6 million tons annually Another safe mining method Set a world record on Superior Highwall Mining System Set a world record on the Addington Addcar System

  22. Slide 22: Surface Mines

    Slide 22: Surface Mines

    26 Surface Mines

  23. Slide 23: Surface Mines

    Slide 23: Surface Mines

    26 Surface Mines Projected to produce 46% of Massey Production 22 million tons annually Mike Snelling is to follow with more detail

  24. Slide 24: Preparation Plants

    Slide 24: Preparation Plants

    17 Preparation Plants

  25. Slide 25: Preparation Plants

    Slide 25: Preparation Plants

    17 Preparation Plants Will process 77 million raw tons in 2006 47 million clean tons to load in railroad cars Half a million railroad cars Railroad car is 52 feet long 4,924 miles of railroad cars

  26. Slide 26: Mickey Mouse's Hand? Law of Large Numbers

    Slide 26: Mickey Mouse's Hand? Law of Large Numbers

    Mickey Mouse’s Hand? Law of Large Numbers

  27. Slide 27: Law of Large Numbers

    Slide 27: Law of Large Numbers

    Law of Large Numbers Mine 27,000 feet per day. Would be a tunnel 20’ wide by 5’ tall that stretches 5.1 miles. Total number of shuttle cars 14,500 per day 3.6 Million per year If you do something this repetitive, you need to do it as efficiently as possible.

  28. Slide 28: Mentoring in Massey

    Slide 28: Mentoring in Massey

    Mentoring in Massey

  29. Slide 29: Mentoring in Massey

    Slide 29: Mentoring in Massey

    Mentoring in Massey TRAINEES: MARK SIMPSON MARK BOLEN JOHN COOPER BOBBY DAVIS BRIAN FORTNER CHRISTOPHER DANIEL BRIAN PETERS KEITH SMITH 9 DARRELL K. STANLEY MENTORS: DAVE PETRY RICK FOSTER RICK FOSTER KENNY FARMER JASON GAUTIER MARVIN PERDUE WENDELL WILLS RALPH PLUMLEY DAVE PETRY

  30. Slide 30: Training new Electricians

    Slide 30: Training new Electricians

    Training new Electricians

  31. Slide 31: Training new Electricians

    Slide 31: Training new Electricians

    Training new Electricians 152 trainees have gone through the class Troop has graduated 100% of his class All have passed with 93% or higher

  32. Slide 32: Reactivation of Industrial Engineering

    Slide 32: Reactivation of Industrial Engineering

    Reactivation of Industrial Engineering

  33. Slide 33: Monthly Budget Meetings

    Slide 33: Monthly Budget Meetings

    Monthly Budget Meetings

  34. Slide 34: Massey Energy Expansion

    Slide 34: Massey Energy Expansion

    Massey Energy Expansion (tons in millions) New Property Clean Recoverable Tons Horse Creek 17 Kermit Mammoth Shonk Gas—Delbarton 65 Kepler TOTAL 260 Million Tons

  35. Slide 35: Massey Energy – Operating Regions

    Slide 35: Massey Energy – Operating Regions

    Massey Energy – Operating Regions

  36. Slide 36: Horse Creek

    Slide 36: Horse Creek

    Horse Creek r~

  37. Slide 37: Horse Creek

    Slide 37: Horse Creek

    Horse Creek

  38. Slide 38: Mammoth Coal — Stockton Seam

    Slide 38: Mammoth Coal — Stockton Seam

    Mammoth Coal — Stockton Seam ;~\ Massey Energy,

  39. Slide 39: Mammoth - #2 Gas Mine

    Slide 39: Mammoth - #2 Gas Mine

    Mammoth - #2 Gas Mine Massey Energy,

  40. Slide 40: Mammoth—#2 Gas Mine

    Slide 40: Mammoth—#2 Gas Mine

    Mammoth—#2 Gas Mine

  41. Slide 41: Mammoth—#2 Gas Mine

    Slide 41: Mammoth—#2 Gas Mine

    Mammoth—#2 Gas Mine

  42. Slide 42: Mammoth – Winifrede Mine

    Slide 42: Mammoth – Winifrede Mine

    Mammoth – Winifrede Mine

  43. Slide 43: Shonk Property – Peerless Seam

    Slide 43: Shonk Property – Peerless Seam

    Shonk Property – Peerless Seam

  44. Slide 44: #2 Gas - Delbarton

    Slide 44: #2 Gas - Delbarton

    #2 Gas - Delbarton Massey Energy,

  45. Slide 45: Kepler

    Slide 45: Kepler

    Kepler re P 1A

  46. Slide 46: Kermit Coal

    Slide 46: Kermit Coal

    \ Lyn, Massey Energy, Kermit Coal

  47. Slide 47: In Summary

    Slide 47: In Summary

    In Summary 2.3 billion tons of reserves Opening up 260 million tons of new underground reserves Largest operator of underground mines Diverse in our mining methods Ability to cross over between steam and met markets. Experienced management team

  48. Slide 48: Doing the Right Thing with Energy

    Slide 48: Doing the Right Thing with Energy

    Doing the Right Thing. with Energy

  49. Slide 49

    Slide 49

  50. Slide 50

    Slide 50

  51. Slide 51

    Slide 51

Source: SEC EDGAR · 8-K filed Sep 28, 2005

More decks from Massey Energy Co