Massey Energy Co

Massey Energy — Investor Presentation (September 2005)

44 slides from Massey Energy's investor presentation, Sep 29, 2005

  1. Slide 1: Metallurgical Sales

    Slide 1: Metallurgical Sales

    Metallurgical Sales Mike Allen President, Massey Metallurgical Sales September 27, 2005

  2. Slide 2: Massey Metallurgical Mines

    Slide 2: Massey Metallurgical Mines

    Massey Metallurgical Mines [~\ Massey Energy,

  3. Slide 3: Domestic Met Accounts

    Slide 3: Domestic Met Accounts

    Domestic Met Accounts

  4. Slide 4: Massey Coal Export Accounts

    Slide 4: Massey Coal Export Accounts

    Massey Coal Export Accounts as

  5. Slide 5: New Markets for Massey

    Slide 5: New Markets for Massey

    abs Massey Energy. New Markets for Massey

  6. Slide 6: Coke Oven Battery – Al Nasr

    Slide 6: Coke Oven Battery – Al Nasr

    Coke Oven Battery – Al Nasr

  7. Slide 7: Posco-Korea

    Slide 7: Posco-Korea

    Posco-Korea Pohang Steelworks Gwangyang Steelworks

  8. Slide 8: China Steel

    Slide 8: China Steel

    China Steel ¥ Massey Energy,

  9. Slide 9: Steel Authority of India

    Slide 9: Steel Authority of India

    Steel Authority of India GyzAe

  10. Slide 10: Issues Driving Changes

    Slide 10: Issues Driving Changes

    Issues Driving Changes Strong Worldwide Steel Production Rapid Chinese & Indian Growth Weak U.S. Dollar

  11. Slide 11: Strong Worldwide Steel Production

    Slide 11: Strong Worldwide Steel Production

    Strong Worldwide Steel Production World approaching 1 billion tonnes of production December 2004 up 23% year over prior year China is primary source of growth Others also serving Chinese market Capacity utilization will rise in Japan, U.S., other traditional producers Production is straining raw mat

  12. Slide 12: Growth Rate in India & China

    Slide 12: Growth Rate in India & China

    Growth Rate in India & China Economy running at a robust GDP rate >9% in China and >13% in India created vacuum-like demand for raw materials. Crude steel production in 2004 topped 273 MMt in China and 32 MMt in India. Source: HILL & ASSOCIATES, INC.

  13. Slide 13: Future Growth led by BRICS

    Slide 13: Future Growth led by BRICS

    Future Growth led by BRICS The world is likely to see increased demand for BF-based ironmaking and hence coke in the short to medium term. China is a major factor in the strong demand growth for coke and hard coking coal. Vast iron ore reserves Extensive met coal Scrap/some DRI Low grade iron ore re

  14. Slide 14: Key Massey Met Coal Operations

    Slide 14: Key Massey Met Coal Operations

    KEY MASSEY MET COAL OPERATIONS

  15. Slide 15: Marfork Coal

    Slide 15: Marfork Coal

    MARFORK COAL 15

  16. Slide 16: Marfork Coal Company

    Slide 16: Marfork Coal Company

    Marfork Coal Company Located in Raleigh County, West Virginia. Massey greenfield project began in 1994 on former Bethlehem properties. At 7 million annual tons, largest shipper of metallurgical coal in U. S. Recently expanded with acquisition of adjacent Rowland reserves. Eagle, Powellton and Cedar

  17. Slide 17: Marfork Coal Company – Rail service

    Slide 17: Marfork Coal Company – Rail service

    Marfork Coal Company Rail service: CSX Kanawha District 150-car, 4-hour batch weigh loadout Access to Pier IX and DTA Terminal

  18. Slide 18: Performance Coal

    Slide 18: Performance Coal

    PERFORMANCE COAL 18

  19. Slide 19: Goals Plant

    Slide 19: Goals Plant

    GOALS PLANT

  20. Slide 20: Performance Coal & Goals Plant – Rail service

    Slide 20: Performance Coal & Goals Plant – Rail service

    Performance Coal & Goals Plant Rail service at Goals plant: CSX Kanawha District 90-car, 24-hour loadout Access to Pier IX and DTA Terminal Rail service at Surveyor Loadout: NS Virginian District 80-car, 4 hour loadout Access to Lamberts Point Terminal

  21. Slide 21: Performance Coal & Goals Plant

    Slide 21: Performance Coal & Goals Plant

    Performance Coal & Goals Plant Located in Raleigh County, West Virginia. Formerly Peabody’s Montcoal and Sundial operations. Primary production is UBB Eagle longwall-Most goes to Marfork. Annual production of 5.5 million tons. Shumate Powellton and Hazy Ridge Hernshaw Met coals also.

  22. Slide 22: Elk Run Coal

    Slide 22: Elk Run Coal

    ELK RUN COAL 22

  23. Slide 23: Elk Run Coal Company

    Slide 23: Elk Run Coal Company

    Elk Run Coal Company Located in Boone County, West Virginia. Began operations as a Massey greenfield development in 1981. White Knight Powellton Mine and Cedar Grove Mine are key met coal producers. Massey’s largest shipping point at +9 million annual tons — steam and met coals.

  24. Slide 24: 24

    Slide 24: 24

    24

  25. Slide 25: Elk Run Coal Company – Rail service

    Slide 25: Elk Run Coal Company – Rail service

    Elk Run Coal Company Rail service: CSX Kanawha District 150-car, 4-hour batch weigh loadout Access to Pier IX and DTA Terminal

  26. Slide 26: Independence Coal

    Slide 26: Independence Coal

    f #0 INDEPENDENCE COAL 26

  27. Slide 27: Independence Coal Company

    Slide 27: Independence Coal Company

    Independence Coal Company Based in Boone County, West Virginia. Formerly Westmoreland’s Ferrell operation; acquired by Massey in 1992. Primary met production is Powellton seam from Justice Mine longwall. Annual production exceeds 5 million tons.

  28. Slide 28: Independence Coal Company – Rail service

    Slide 28: Independence Coal Company – Rail service

    Independence Coal Company Rail service: CSX Kanawha District 150-car, 4-hour loadout Access to Pier IX and DTA Terminal

  29. Slide 29: Knox Creek

    Slide 29: Knox Creek

    KNOX CREEK

  30. Slide 30: Knox Creek Coal Corporation

    Slide 30: Knox Creek Coal Corporation

    Knox Creek Coal Corporation Knox Creek includes the Tiller No. 1 underground room and pillar mine and a preparation plant. Production from the mine is belted directly to the preparation plant. The plant has a feed capacity of 650 tons per hour. The preparation plant serves customers on the Norfolk S

  31. Slide 31: Bandmill Preparation Plant

    Slide 31: Bandmill Preparation Plant

    BANDMILL PREPARATION PLANT 3

  32. Slide 32: Bandmill Preparation Plant

    Slide 32: Bandmill Preparation Plant

    Bandmill Preparation Plant Located at Lyburn, West Virginia. Shipping Point - Hutchinson, WV. million tons per year production capacity. Rail Service at Bandmill CSX #82733 - Kanawha District 150-car, 4-1/2 hour batch weigh, 3700 tons per hour Raw Coal Storage - 200,000 tons - Silos + ground Clean C

  33. Slide 33: Logan County Development

    Slide 33: Logan County Development

    Logan County Development Logan Complex includes Aracoma Mine and Bandmill Preparation plant - both near Logan, WV. Aracoma reserves leased in 1987. Adjacent Bandmill plant acquired from Pittston in 1998. Aracoma Alma Mine – 3 Million tons per year production – 1 Longwall and 2 Miner Sections. Aracom

  34. Slide 34: Green Valley

    Slide 34: Green Valley

    34 GREEN VALLEY

  35. Slide 35: Green Valley Coal Company

    Slide 35: Green Valley Coal Company

    Green Valley Coal Company Located in Nicholas County, WV. Former Lady H operation was acquired by Massey in 1996. Serves both premium industrial and metallurgical customers All production is Sewell seam. Annual shipments of 0.6 million tons.

  36. Slide 36: Green Valley Coal Company – Rail service

    Slide 36: Green Valley Coal Company – Rail service

    Green Valley Coal Company Rail service: CSX NF&G District 75-car, 24-hour loadout Access to Pier IX and DTA Terminal

  37. Slide 37: Nicholas Energy

    Slide 37: Nicholas Energy

    we 8 Gio A FE 4 NICHOLAS ENERGY 7

  38. Slide 38: Nicholas Energy Company

    Slide 38: Nicholas Energy Company

    NICHOLAS ENERGY COMPANY Located in Nicholas County, West Virginia Purchased from Bethlehem’s HPM subsidiary in 1997 NS shipping point post Conrail split

  39. Slide 39: Nicholas Energy Company – Annual production

    Slide 39: Nicholas Energy Company – Annual production

    NICHOLAS ENERGY COMPANY ANNUAL PRODUCTION - 3.7 million tpy 2.5 million tons compliance 1.0 million tons <1% sulfur

  40. Slide 40: Nicholas Energy Company – Rail service

    Slide 40: Nicholas Energy Company – Rail service

    NICHOLAS ENERGY COMPANY Rail Service: Norfolk Southern Kenova Freight District 140 car, 4-hour batch weigh loadout

  41. Slide 41: Rawl Sales & Processing

    Slide 41: Rawl Sales & Processing

    Rawl Sales & Processing

  42. Slide 42: Rawl Sales & Processing Co.

    Slide 42: Rawl Sales & Processing Co.

    Rawl Sales & Processing Co. Operations located in Mingo County, West Virginia and Pike County, Kentucky Developed as Massey greenfield project in 1977. New rail coal receiving system allows sourcing of production from plus 100 mile radius. Annual production of 3-4 million tons.

  43. Slide 43: Rawl Sales & Processing Co. – Rail service

    Slide 43: Rawl Sales & Processing Co. – Rail service

    Rawl Sales & Processing Co. Rail service: NS Thacker District 150-car, 4-hour batch weigh loadout Access to Lamberts Point Terminal

  44. Slide 44: Doing the Right Thing. with Energy

    Slide 44: Doing the Right Thing. with Energy

    Doing the Right Thing. with Energy

Source: SEC EDGAR · 8-K/A filed Sep 29, 2005

More decks from Massey Energy Co