Slide 1: Metallurgical Sales
Metallurgical Sales Mike Allen President, Massey Metallurgical Sales September 27, 2005

Slide 2: Massey Metallurgical Mines
Massey Metallurgical Mines [~\ Massey Energy,

Slide 3: Domestic Met Accounts
Domestic Met Accounts

Slide 4: Massey Coal Export Accounts
Massey Coal Export Accounts as

Slide 5: New Markets for Massey
abs Massey Energy. New Markets for Massey

Slide 6: Coke Oven Battery – Al Nasr
Coke Oven Battery – Al Nasr

Slide 7: Posco-Korea
Posco-Korea Pohang Steelworks Gwangyang Steelworks

Slide 8: China Steel
China Steel ¥ Massey Energy,

Slide 9: Steel Authority of India
Steel Authority of India GyzAe

Slide 10: Issues Driving Changes
Issues Driving Changes Strong Worldwide Steel Production Rapid Chinese & Indian Growth Weak U.S. Dollar

Slide 11: Strong Worldwide Steel Production
Strong Worldwide Steel Production World approaching 1 billion tonnes of production December 2004 up 23% year over prior year China is primary source of growth Others also serving Chinese market Capacity utilization will rise in Japan, U.S., other traditional producers Production is straining raw mat

Slide 12: Growth Rate in India & China
Growth Rate in India & China Economy running at a robust GDP rate >9% in China and >13% in India created vacuum-like demand for raw materials. Crude steel production in 2004 topped 273 MMt in China and 32 MMt in India. Source: HILL & ASSOCIATES, INC.

Slide 13: Future Growth led by BRICS
Future Growth led by BRICS The world is likely to see increased demand for BF-based ironmaking and hence coke in the short to medium term. China is a major factor in the strong demand growth for coke and hard coking coal. Vast iron ore reserves Extensive met coal Scrap/some DRI Low grade iron ore re

Slide 14: Key Massey Met Coal Operations
KEY MASSEY MET COAL OPERATIONS

Slide 15: Marfork Coal
MARFORK COAL 15

Slide 16: Marfork Coal Company
Marfork Coal Company Located in Raleigh County, West Virginia. Massey greenfield project began in 1994 on former Bethlehem properties. At 7 million annual tons, largest shipper of metallurgical coal in U. S. Recently expanded with acquisition of adjacent Rowland reserves. Eagle, Powellton and Cedar

Slide 17: Marfork Coal Company – Rail service
Marfork Coal Company Rail service: CSX Kanawha District 150-car, 4-hour batch weigh loadout Access to Pier IX and DTA Terminal

Slide 18: Performance Coal
PERFORMANCE COAL 18

Slide 19: Goals Plant
GOALS PLANT

Slide 20: Performance Coal & Goals Plant – Rail service
Performance Coal & Goals Plant Rail service at Goals plant: CSX Kanawha District 90-car, 24-hour loadout Access to Pier IX and DTA Terminal Rail service at Surveyor Loadout: NS Virginian District 80-car, 4 hour loadout Access to Lamberts Point Terminal

Slide 21: Performance Coal & Goals Plant
Performance Coal & Goals Plant Located in Raleigh County, West Virginia. Formerly Peabody’s Montcoal and Sundial operations. Primary production is UBB Eagle longwall-Most goes to Marfork. Annual production of 5.5 million tons. Shumate Powellton and Hazy Ridge Hernshaw Met coals also.

Slide 22: Elk Run Coal
ELK RUN COAL 22

Slide 23: Elk Run Coal Company
Elk Run Coal Company Located in Boone County, West Virginia. Began operations as a Massey greenfield development in 1981. White Knight Powellton Mine and Cedar Grove Mine are key met coal producers. Massey’s largest shipping point at +9 million annual tons — steam and met coals.

Slide 24: 24
24

Slide 25: Elk Run Coal Company – Rail service
Elk Run Coal Company Rail service: CSX Kanawha District 150-car, 4-hour batch weigh loadout Access to Pier IX and DTA Terminal

Slide 26: Independence Coal
f #0 INDEPENDENCE COAL 26

Slide 27: Independence Coal Company
Independence Coal Company Based in Boone County, West Virginia. Formerly Westmoreland’s Ferrell operation; acquired by Massey in 1992. Primary met production is Powellton seam from Justice Mine longwall. Annual production exceeds 5 million tons.

Slide 28: Independence Coal Company – Rail service
Independence Coal Company Rail service: CSX Kanawha District 150-car, 4-hour loadout Access to Pier IX and DTA Terminal

Slide 29: Knox Creek
KNOX CREEK

Slide 30: Knox Creek Coal Corporation
Knox Creek Coal Corporation Knox Creek includes the Tiller No. 1 underground room and pillar mine and a preparation plant. Production from the mine is belted directly to the preparation plant. The plant has a feed capacity of 650 tons per hour. The preparation plant serves customers on the Norfolk S

Slide 31: Bandmill Preparation Plant
BANDMILL PREPARATION PLANT 3

Slide 32: Bandmill Preparation Plant
Bandmill Preparation Plant Located at Lyburn, West Virginia. Shipping Point - Hutchinson, WV. million tons per year production capacity. Rail Service at Bandmill CSX #82733 - Kanawha District 150-car, 4-1/2 hour batch weigh, 3700 tons per hour Raw Coal Storage - 200,000 tons - Silos + ground Clean C

Slide 33: Logan County Development
Logan County Development Logan Complex includes Aracoma Mine and Bandmill Preparation plant - both near Logan, WV. Aracoma reserves leased in 1987. Adjacent Bandmill plant acquired from Pittston in 1998. Aracoma Alma Mine – 3 Million tons per year production – 1 Longwall and 2 Miner Sections. Aracom

Slide 34: Green Valley
34 GREEN VALLEY

Slide 35: Green Valley Coal Company
Green Valley Coal Company Located in Nicholas County, WV. Former Lady H operation was acquired by Massey in 1996. Serves both premium industrial and metallurgical customers All production is Sewell seam. Annual shipments of 0.6 million tons.

Slide 36: Green Valley Coal Company – Rail service
Green Valley Coal Company Rail service: CSX NF&G District 75-car, 24-hour loadout Access to Pier IX and DTA Terminal

Slide 37: Nicholas Energy
we 8 Gio A FE 4 NICHOLAS ENERGY 7

Slide 38: Nicholas Energy Company
NICHOLAS ENERGY COMPANY Located in Nicholas County, West Virginia Purchased from Bethlehem’s HPM subsidiary in 1997 NS shipping point post Conrail split

Slide 39: Nicholas Energy Company – Annual production
NICHOLAS ENERGY COMPANY ANNUAL PRODUCTION - 3.7 million tpy 2.5 million tons compliance 1.0 million tons <1% sulfur

Slide 40: Nicholas Energy Company – Rail service
NICHOLAS ENERGY COMPANY Rail Service: Norfolk Southern Kenova Freight District 140 car, 4-hour batch weigh loadout

Slide 41: Rawl Sales & Processing
Rawl Sales & Processing

Slide 42: Rawl Sales & Processing Co.
Rawl Sales & Processing Co. Operations located in Mingo County, West Virginia and Pike County, Kentucky Developed as Massey greenfield project in 1977. New rail coal receiving system allows sourcing of production from plus 100 mile radius. Annual production of 3-4 million tons.

Slide 43: Rawl Sales & Processing Co. – Rail service
Rawl Sales & Processing Co. Rail service: NS Thacker District 150-car, 4-hour batch weigh loadout Access to Lamberts Point Terminal

Slide 44: Doing the Right Thing. with Energy
Doing the Right Thing. with Energy
Source: SEC EDGAR · 8-K/A filed Sep 29, 2005
More decks from Massey Energy Co
Merger or Acquisition (March 2011)18 slides · Mar 9, 2011
BMO Capital Markets 2011 Global Metals & Mining Conference27 slides · Mar 1, 2011
Credit Suisse Energy Summit 201126 slides · Feb 10, 2011
Merger or Acquisition (January 2011)19 slides · Jan 31, 2011
Proxy Contest (May 2010)32 slides · May 5, 2010
Proxy Contest (April 2010)26 slides · Apr 30, 2010