Harvest Natural Resources — EnerCom's London Oil & Gas Conference 2010
30 slides from Harvest Natural Resources's conference presentation, Jun 17, 2010

Slide 1: Harvest Natural Resources, Inc. - EnerCom's London Oil & Gas Conference
1 1 Harvest Natural Resources, Inc. EnerCom's London Oil & Gas Conference June 17, 2010 Tested. Proven. Moving Forward

Slide 2: Cautionary Statements to Shareholders: Forward-Looking Statements
2 Cautionary Statements to Shareholders: Certain statements in this presentation are forward-looking and are based upon Harvest's current belief as to the outcome and timing of future events. All statements other than statements of historical facts including capital expenditures, increases in oil an

Slide 3: About Harvest
3 About Harvest Market Data Exchange/Ticker NYSE: HNR Market Capitalization * $ 254 MM Enterprise Value $ 242 MM Cash (03/31/2010) $ 44 MM Debt (03/31/2010) $ 32 MM Shares Outstanding 33.3 MM Institutional Ownership 58.90% * As of June 7th, 2010

Slide 4: Location of Assets
4 Location of Assets Houston Headquarters

Slide 5: International Portfolio
5 5 Harvest Natural Resources, Inc. International Portfolio Tested. Proven. Moving Forward

Slide 6: Venezuela - Petrodelta
6 Venezuela - Petrodelta 32% Equity interest in Petrodelta Six fields 7.7 billion barrels of oil-in- place Active Drilling Program Commenced in April 2008 Current production rate of 21,500 BOPD Successful Appraisal and Development Program ongoing in Temblador and El Salto Operations generating solid

Slide 7: 1/1/2004 2/1/2004 3/1/2004 4/1/2004 5/1/2004 6/1/2004 7/1/2004 8/1/2004 9/1/2004 10/1/2004 11/1/2004 12/1/2004 1/1/20…
7 1/1/2004 2/1/2004 3/1/2004 4/1/2004 5/1/2004 6/1/2004 7/1/2004 8/1/2004 9/1/2004 10/1/2004 11/1/2004 12/1/2004 1/1/2005 2/1/2005 3/1/2005 4/1/2005 5/1/2005 6/1/2005 7/1/2005 8/1/2005 9/1/2005 10/1/2005 11/1/2005 12/1/2005 1/1/2006 2/1/2006 3/1/2006 4/1/2006 5/1/2006 6/1/2006 7/1/2006 8/1/2006 9/1/

Slide 8: Petrodelta Margins
8 Petrodelta Margins WTI = $61.76

Slide 9: Petrodelta Resource Base
9 Petrodelta Resource Base At December 31, 2009 Six fields with 7.7 billion barrels OOIP 46.3 million BOE net Proven, 178 million BOE net Probable and Possible 2009 Drilling Program at El Salto and Temblador fields drive significant additions December 2009 Reserve Report increases 3P oil and gas res

Slide 10: After Tax NPV vs Discount Rate
10 After Tax NPV vs Discount Rate HNR Enterprise Value $242MM @ June 7, 2010

Slide 11: Indonesia Budong-Budong
11 Indonesia Budong-Budong 1.4 MM acre PSC, Onshore West Sulawesi, Indonesia 47% interest Proven hydrocarbon system Thrust fold belt Several oil and gas surface seeps present 2010 Work Program 2 Exploration wells Independent thrust folded anticlines Stacked targets - potential reservoirs in Miocene

Slide 12: First Budong Well: Lariang LG-1 Prospect
12 First Budong Well: Lariang LG-1 Prospect Eocene thrust play with stacked targets Primary Target Low Risk (COS 27%) Eocene - Mean Reserve Target: 83 MMBBL Secondary Targets Miocene (COS 21%) Pmean Reserve Target: 24 MMBBL Intra Eocene (COS 22%) Pmean Reserve Target: 22 MMBBL Good seismic response

Slide 13: Second Budong Well: Karama KD-1 Prospect
13 Second Budong Well: Karama KD-1 Prospect Eocene thrust play with stacked targets Eocene Primary Target Eocene - Pmean Reserve Target: 118 MMBBL Low Risk (COS 23%) Secondary Targets Intra Eocene 1 (COS: 19%) Pmean Reserve Target: 52 MMBBL Intra Eocene 2 (COS 13%) Pmean Reserve Target: 180 MMBBL Go

Slide 14: Gabon - Dussafu
14 Gabon - Dussafu 680,000 acre PSC, Offshore Gabon 66.667% operated interest Proven hydrocarbon system Existing discoveries on license area Prospectivity identified at multiple levels Post-Salt Pre-Salt Gamba Pre-Salt Syn-Rift 2010 Work Program Exploration drilling in 2010: Pre-Salt Exploration wel

Slide 15: Dussafu Well: Ruche Marine Prospect
15 Dussafu Well: Ruche Marine 1 Prospect Pre-salt play with stacked targets Primary Target Gamba Low Risk (COS 29%) Pmean Reserve Target: 26 MMBBL Secondary Target Dentale Stacked Dentale Reservoirs (COS 23%) 4-way dip closure, new improved imaging has helped unlock the potential of these proven pla

Slide 16: Ruche Marine-1 Dentale Targets
16 Ruche Marine-1 Dentale Targets Secondary Target Dentale (COS 23%) Mean MMBBL Upper 26 Middle 25 Lower 13 Gamba Upper Dentale Middle Dentale Lower Dentale

Slide 17: Oman - Qarn Alam
17 Oman - Qarn Alam 956,000 acre EPSA, Onshore Oman 100% operated interest (Oman Oil has up to 20% back in) Large Deep Paleozoic gas and condensate resource potential play in Ghaba Basin beneath shallow oil fields on production since 1975 Proximal to infrastructure for domestic and LNG markets with

Slide 18: China - WAB
18 China - WAB - 21 6.2 million acres, Offshore South China Sea 100% operated interest (CNOOC has 51% back in) Oil and Gas discoveries being developed and produced in adjacent acreage All elements of proven petroleum system to the West are present in WAB-21 Subject to territorial dispute between Chi

Slide 19: US Portfolio
19 19 Harvest Natural Resources, Inc. US Portfolio Tested. Proven. Moving Forward

Slide 20: Central Area of the Uinta Basin, Utah
20 Central Area of the Uinta Basin, Utah Current Fee, Tribal and Allottee Lease Position ~ 66,000 acres; 40,000 net 2010 Work Program and Status: Mesaverde Deep Gas: Flowed Mesaverde gas in the Bar-F well Further testing to define commerciality anticipated in 2011 Green River/Wasatch Oil: Bar F well

Slide 21: USA-Antelope - Shallow Oil: Monument Butte Extension
21 320 acre AMI containing 8 drilling locations signed with NFX as operator. HNR WI: 43%. NRI: 34% 8 wells on production Proved reserves for 8 wells of 226 MBO and 1.1 BCF (net to Harvest) at Dec 31, 2009 assume only 87,000 BBL per well Individual wells are economic at 35,000-40,000 BBL primary EUR

Slide 22: USA-Antelope - Bar F Well: Deep Tight Mesaverde Gas Exploration
22 Exploration well spud June 15, 2009 and was drilled to 17,566 feet Frac'd and tested 8 individual Mesaverde intervals (14,000-17,400 feet) Individual intervals tested at flow rates of 1.5 to 2 mmcfd Tests prove presence of large gas resource, but do not conclusively determine commercial potential

Slide 23: USA-Antelope - Bar F Well Green River/Wasatch Oil
23 Frac'd 6 intervals between 8,200-9,700 feet in the Lower Green River and Upper Wasatch formations These formations currently produced in Altamont-Bluebell field 6 - 8 miles north of the Bar-F well Individual vertical wells are economic at EUR of 150,000-200,000 BBL ($70/BBL WTI). Possibility of h

Slide 24: Antelope Project Summary
24 Antelope Project Summary Monument Butte Extension Area 8 wells currently producing 930 BOPD (310 BOPD net to Harvest) 5 additional wells to be drilled in 2010, starting in late July 2010 Additional 10+ close-in offsets contingent upon results Long step-outs in 2011; potential for 20 to 100 locati

Slide 25: Schedule
Schedule Seomesrecrs [Venezuela |Pevodetta ( ESateytsero loman [Block 64 J _ lusa [Antelope - GRWasatch = Cera Bing Innesia_foceng > (con [ows = =~ onan foexss — 4 lusa [Antelope Mesaverde od Fowl ng [Venezuela |Petodeta —— Intresia [Beng con fous = lk [anmope teens —) sa |ansope cr wansen — 4 iabpm

Slide 26: Share Price Relative to Value
26 Share Price Relative to Value Share Price (06/07/2010) NPV10 Per-Share @ $40/BBL WTI NPV10 Per Share @ $50/BBL WTI NPV10 Per Share @ $60/BBL WTI NPV10 Per Share @ $70/BBL WTI Share Price (06/07/10) 7.63 Cash 0.3604 0.3604 0.3604 0.3604 Petrodelta 1P 5.67 8.73 11.64 14.52 Petrodelta 2P 3.03 5.33 7

Slide 27: HNR Stock Price, DJI and WTI Price
HA T HNR Stock Price \ be OH nSvES HNR Stock Price, DJ! and WTI price stsnare 3 a g sngex00 08 agngnanaraaae Heriities ii ‘Stock Pico, Sishare 1 xed Company MOU signed ong Commences wwwharvestnr.com 27

Slide 28: Capital Structure Aligned with Strategy
28 Capital Structure Aligned with Strategy 03/31/2010 12/31/2009 12/31/2008 ASSETS: Cash $44.1 $32.3 $97.2 Restricted cash 1.0 0.0 0.0 Other current assets 20.3 22.2 22.6 Investment in equity affiliate 272.4 234.0 218.9 PPE, net 71.7 60.3 23.6 Total assets 409.5 348.8 362.3 LIABILITIES & S/H EQUITY:

Slide 29: 2010 Plan Summary
29 2010 Plan Summary Venezuela Internally funded drilling program will grow production and reserves Average production plan for 2010 is 26,600 BOPD. Internal funds applied to facilities and infrastructure for Temblador and El Salto El Salto infrastructure will enable field early production rates of

Slide 30: Why Invest In Harvest?
30 Why Invest In Harvest? Significant Valuation Gap Current EV equates to PV20 for Petrodelta 1P Petrodelta CFO funding strong growth in production New fields potential demonstrated Significant weight towards oil relative to our peers Growing US oil production and near term exploration catalysts Ini
Source: SEC EDGAR · 8-K filed Jun 17, 2010
More decks from Harvest Natural Resources Inc
Enercom Oil and Gas Conference 201517 slides · Aug 17, 2015
Enercom Oil and Gas Conference 201417 slides · Aug 18, 2014
Global Hunter Energy Conference (June 2014)18 slides · Jun 25, 2014
EnerCom's The Oil & Gas Conference 18 (August 2013)20 slides · Aug 12, 2013
Global Hunter Securities 100 Energy Conference 201316 slides · Jun 25, 2013
EnerCom's The Oil and Gas Conference 201220 slides · Aug 13, 2012