Harvest Natural Resources Inc

Harvest Natural Resources — EnerCom's The Oil & Gas Conference 18 (August 2013)

20 slides from Harvest Natural Resources's conference presentation, Aug 12, 2013

  1. Slide 1: EnerCom's The Oil & Gas Conference

    Exhibit 99.1 EnerCom's The Oil & Gas Conference® 18 August 12, 2013

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements Cautionary Statements: Certain statements in this presentation are forward-looking and are based upon Harvest’s current belief as to the outcome and timing of future events. All statements other than statements of historical facts including planned capital expenditures, in

  3. Slide 3: About Harvest

    About Harvest Market Data Exchange/Ticker NYSE: HNR Market Capitalization * $ 174 MM Enterprise Value $ 243 MM Cash (06/30/2013) $ 9.8 MM Debt (06/30/2013) $ 79 MM Shares Outstanding 39.5 MM Institutional Ownership 75% * As of August 7, 2013 NYSE: HNR www.harvestnr.com 3

  4. Slide 4: Highlights

    Highlights Venezuela continues strong production growth Up 16% in 2012 Current production 43,000 bopd, up 19% vs. 2012 average “2 for 2” Exploration in pre-salt offshore Gabon Ruche discovery in 2011 Tortue discovery in 2013 49 million bbl oil discovered on block Large scale outboard potential ident

  5. Slide 5: Venezuela - Petrodelta

    Venezuela - Petrodelta 32% Equity Interest in Petrodelta Six fields, 9.9 billion barrels of gross oil-in-place Growth underway Current production rate of 43,000 bopd Successful development program ongoing in Temblador, Isleño and El Salto El Salto producing 20,000 bopd Isleño producing 2,200 bopd fr

  6. Slide 6: Petrodelta Production

    Petrodelta Production 2013 Outlook 60 41,300 BOPD average full year 6 38,211 BOPD average Q2 2013 43,000 BOPD current 50 5 $210 million Capex for 2013 New fields Infrastructure 40 6 rigs at year-end for development wells 4 25 new oil wells 30 3 20 2 10 1 Conversion Process 0 0 2004 2005 2006 2007 20

  7. Slide 7: Petrodelta Reserves Valuation

    Petrodelta Reserves Valuation At December 31, 2012 Six fields with 9.9 billion barrels gross OOIP 38.4 million BOE net Proven, 166.2 million BOE net Probable and Possible 2013 Drilling Program at El Salto, Temblador and Isleño fields will continue to drive reserve additions and increase production R

  8. Slide 8: Gabon – Dussafu Block

    Gabon – Dussafu Block HNR PROPERTIES 680,000 acre PSC, Offshore Gabon Ebouri Lucina GAMBA PROSPECTS/LEADS OTHER PROSPECTS/LEADS 66.667% operated interest OIL FIELDS GAS DISCOVERY 49 MMBO mean contingent resources Etame discovered GABON North rd 3 Exploration Period Tchibala • Extends to May 27, 2016

  9. Slide 9: Dussafu – Tortue Discovery

    Dussafu – Tortue Discovery Tortue Exploration Well DTM-1 Tortue Marin-1 Oil discovery in pre-salt Gamba and Dentale reservoirs, 53m net pay Appraisal sidetrack DTM-1 ST1, 20m net pay in Dentale Well suspended pending future appraisal and development studies DTM-1 ST1 DTM-1 Gamba Structure Contingent

  10. Slide 10: Dussafu - Ready for Development

    Dussafu - Ready for Development Work-In-Progress Subsurface engineering Project and facilities engineering Logistics planning Well completion design Equipment selection Expect FEED complete 3Q 2013 First production by mid 2015 Project sanction by partners 2013 Long lead items to be ordered Declarati

  11. Slide 11: Dussafu Resource Potential

    Dussafu Resource Potential Exploration Prospects and Leads Resource Type Mean MMBO Unrisked Unrisked Recoverable Overall STOIIP Name Formation Reserves Lead/Prospect Oil/Condensate (MMBBl) COS Contingent Resource 49 P10 Mean P10 Mean 2 Tchibobo NE Gamba 43 25 14 8 40% 13 Prospects (unrisked) 201 2 T

  12. Slide 12: Dussafu Outboard Leads

    Dussafu Outboard Leads Dussafu outboard leads in relation to nearby Dentale exploration activity Total / Cobalt / Marathon drilling Diaman-1 targeting 250- Dussafu Outboard Leads 800 MMBO Based on 2D seismic Shell / CNOOC expected to drill 2 well in BC9/10 in 2013 Vaalco / Sasol / Sinopec drilling O

  13. Slide 13: South Gabon Pre-Salt Structures

    South Gabon Pre-Salt Structures Tortue Discovery (Harvest 2013) Dussafu Outboard Leads (Harvest) Gamba & Dentale structures formed by listric normal Defined by multiple 2D lines faults detaching on older Melania shale Stacked Gamba and Dentale potential Dentale consists of stacked lacustrine and flu

  14. Slide 14: Dussafu Potential Value, Net to Harvest

    Dussafu Potential Value, Net to Harvest $1,600 Total Mean Value: $1497 $1,400 $1,200 Exploration Program Mean $663 Risked Value: $947 $1,000 $800 $1,497 Contingent Resources $284 $600 Mean Value: $550 $35 $31 $400 $167 $200 $317 $0 Tortue Ruche Walt Whitman Moubenga Inboard Expl Outboard Expl Total

  15. Slide 15: Indonesia - Budong-Budong

    Indonesia - Budong-Budong 611,943 acre PSC HNR LICENSE 71.5% WI - Onshore West Sulawesi BACK THRUST PROSPECTS/LEADS FOLD BELT LEADS 4 year extension to Jan 2017 STRATIGRAPHIC PROSPECTS/LEADS Harvest became operator in April 2013 Proven Petroleum System Lariang and Karama sub-basins Madjene Source ki

  16. Slide 16: Budong-Budong Madjene Prospect

    Budong-Budong Madjene Prospect Unrisked Gross Mean P10 COS Madjene Prospect Reserves MMBO MMBO % Thrusted anticline Pliocene 490 Sand 44 74 30% Stacked reservoir targets Pliocene and Miocene sands Upper Miocene Sand 37 64 21% 96 MMBO total mean unrisked Middle Miocene Sand 15 27 20% reserves TOTAL 9

  17. Slide 17: Colombia Entry

    Colombia Entry HNR Farmin to VSM14 and VSM15 Blocks Upper Magdalena Basin Signed agreements with operators of blocks Subject to approval of the Colombia ANH HNR 75% operated interest in both blocks* Balcon Brisas VSM 14 – 137,061 gross acres Antares VSM 15 – 105,721 gross acres San Francisco Dina Te

  18. Slide 18: Cretaceous Shale Characteristics

    Cretaceous Shale Characteristics Cretaceous Shales Villeta on or near blocks VSM14-15 TOC 2% 3 50-70 feet net pay 1 2 10-16% porosity 2,040’ gross 1,750’ gross VSM 14 VSM 15 30-50 MMBO/sq mile 2 1 Villeta La Luna Villeta TOC 3% faulted out 100-220 feet net pay 3 8-14% porosity 1,160’ gross 50-70 MMB

  19. Slide 19: NuTech Log Analysis

    NuTech Log Analysis Unconventional Reservoirs – Comparison VSM 14/15 La Luna VSM 14/15 Tetuan Niobrara La Luna Eagleford 1 3 1 3 Feet Middle Mag 0 100 200 300 350 NYSE: HNR www.harvestnr.com 19

  20. Slide 20: Why Invest in Harvest?

    Why Invest in Harvest? Significant Valuation Gap Currently trading at 1/3 of the after-tax proceeds from failed Petrodelta sale Trading at a discount to valuation of contingent resources for existing discoveries in Dussafu Block in Gabon Near-term development with first oil by first half 2015 High-i

Harvest Natural Resources — EnerCom's The Oil & Gas Conference 18 (August 2013) on 6ix