Harvest Natural Resources — Global Hunter Energy Conference (June 2014)
18 slides from Harvest Natural Resources's conference presentation, Jun 25, 2014
Slide 1: Global Hunter Energy Conference
Exhibit 99.1 Global Hunter Energy Conference June 25, 2014
Slide 2: Forward Looking Statements
Forward Looking Statements Cautionary Statements: Certain statements in this presentation are forward-looking and are based upon Harvest’s current belief as to the outcome and timing of future events. All statements other than statements of historical facts including planned capital expenditures, in
Slide 3: About Harvest
About Harvest Market Data Exchange/Ticker Market Capitalization * $ 215 MM Enterprise Value * $ MM Cash (03/31/2014) $ 17.6 MM Debt (03/31/2014) $ 0 MM Shares Outstanding 42.1 MM Institutional Ownership 72.5% * As of June 20, 2014
Slide 4: Highlights
Highlights Venezuela continues strong production growth Up 11% in 2013 Current production 45,000 bopd, up 13% vs. 2013 average Venezuela sale pending government approval Estimated $220 million net proceeds after tax and other costs Gabon valuation improving based on success “2 for 2” exploration dis
Slide 5: Venezuela – Petrodelta
Venezuela – Petrodelta 20.4% Equity Interest in Petrodelta Six fields, 9.9 billion barrels of gross oil-in-place Growth underway Current production rate of 45,000 bopd Successful development program ongoing in Temblador, Isleño and El Salto El Salto producing 23,500 bopd Isleño producing 3,500 bopd
Slide 6: Gabon – Dussafu Block
Gabon – Dussafu Block 680,000 acre PSC, Offshore Gabon Harvest 66.667% operated interest 3 Exploration Period Extends to May 27, 2016 Work commitments fulfilled Key Harvest Activities Discovered Ruche (2011) and Tortue (2013) Contingent Resources Report (2014) Development of the four oil discoveries
Slide 7: Cluster Development of Oil Discoveries
Cluster Development of Oil Discoveries Contingent Resources Report 1C: 17.0 mmbo gross 2C: 36.3 mmbo gross 3C: 70.6 mmbo gross Work-In-Progress Subsurface engineering Project and facilities engineering Logistics planning Well completion design Equipment selection First production by mid 2016 Develop
Slide 8: CGGV Reprocessing of 1994 3D
CGGV Reprocessing of 1994 3D 2009 CGGV Reprocessing of 1994 3D – reveals Dentale stratigraphy - discoveries identified Tortue DTM-1/ST1 Ruche DRM-1/ST2 Hibiscus HIBM-1
Slide 9: Outboard 3D PSTM Preliminary
Outboard 3D PSTM Preliminary Improved image – Final data may show further extension of Ruche under salt Tortue DTM-1/ST1 Ruche DRM-1/ST2 Hibiscus HIBM-1
Slide 10: Slide 10
Slide 11: Dussafu Prospects – 2013 Seismic Reprocessing
Lead identified on new 3D Dussafu Prospects – 2013 Seismic Reprocessing Improved imaging and velocity model Further improved structural interpretation 2009 prospects refined and highgraded De-risking improves chance of success for numerous potential tie-ins
Slide 12: Potential Tie-In NE of Tortue
Potential Tie-In NE of Tortue Structure recognized on new 3D based on improved imaging Tortue B A Existing Prospects New Lead Gamba Dentale 5 km
Slide 13: Outboard Leads Based on 2D
Outboard Leads Based on 2D Dussafu Outboard Leads New 3D shot in 4Q 2013 Preliminary PSTM 3D data received Confirms presence of Dentale leads Syn-rift prospectivity revealed below Dentale Final 3D PSDM expected in August 2014
Slide 14: Syn-rift Fault Blocks
Syn-rift Fault Blocks New Plays Confirmed by New 2013 3D Structural cross-section across Dussafu
Slide 15: Outboard 3D – Dip Line PSTM
Outboard 3D – Dip Line PSTM Tortue/Ruche 1994 3D Coverage Limit Prospectivity in Dentale folds and Syn-rift blocks
Slide 16: Example Outboard Leads (3D PSTM)
Example Outboard Leads (3D PSTM) Lead 1 Lead 2 Strike Line View
Slide 17: Example Outboard Leads (3D PSTM)
Example Outboard Leads (3D PSTM) Example Outboard Leads (3D PSTM) Dip Line View
Slide 18: Why Invest in Harvest?
Why Invest in Harvest? Catalyst-Rich in Near Term and Beyond Debt-free Currently trading at less than the net proceeds expected from the sale of Venezuela business Gabon Dussafu block provides solid value and compelling upside Contingent resources confirmed Booked reserves only pending project appro
Harvest Natural Resources — Global Hunter Energy Conference (June 2014) on 6ix