Validation of Flowsheet and Potential Additional Plant Feed
Filed with ASX · · 7 pages · English
Summary by 6ix AI
Sovereign Metals Limited has released an update on the Pre-feasibility Study for the Malingunde Project, highlighting successful metallurgical test-work that validates the processing flowsheet. The test-work indicates that both saprolite and saprock materials can be effectively processed, allowing for the inclusion of additional mineralized material previously not considered. The company anticipates delivering an updated JORC Mineral Resource in the near future, reflecting these findings. Overall, the results confirm the potential for a low-cost graphite processing operation at Malingunde.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Watch Sovereign Metals' latest callSovereign Metals (ASX:SVM) — Investor Presentation · Replay · Oct 21Read the transcript of Sovereign Metals (ASX:SVM) — Investor PresentationSovereign Metals Limited on 6ix
Story so far
Earlier from Sovereign Metals
- March 2018 Quarterly Report
- Wide High-Grade Graphite Intercepts Continue At Malingunde
- Significant New Zone of Saprolite-Hosted Graphite Discovered
- Very Wide Zones of High Grade Saprolite-Hosted Graphite
- Malingunde PFS and Marketing Update
Later from Sovereign Metals
- Resource Upgrade - Malingunde Flake Graphite Project
- 99.9995% Purity Confirms Battery and Downstream Suitability
- June 2018 Quarterly Report
- High Grade Rutile Recovered from Graphite Tailings
- Bulk Sample Drilling for Pilot Plant Commences at Malingunde
Follow Sovereign Metals into a list and get an email when it puts out news.
Follow Sovereign Metals