CSE: TN
OTCQB: TTSRF
FSE: 8TA
https://WWW.TARTISANNICKEL.COM
LEADERSHIPManagement, Directors & Advisors
D. Mark ApplebyPRESIDENT & CEO
Omar Gonzalez
CFO
Yves P. Clement
DIRECTOR
Carl J. McGill
DIRECTOR
Greg Edwards
PROJECT MANAGER
David Burga
ADVISOR
Dean MacEachern
ADVISOR
Jack Jacobs
ADVISOR
CSE: TN
OTCQB: TTSRF
FSE: 8TA
3
TARTISAN NICKEL CORP. PROJECTSGrid Metals Corp.
Winnipeg
Kenbridge DepositDryden
100% OWNED CLASS ONE NICKEL SULPHIDE-COPPER-COBALT PROJECT
Established Mineral Resource: 622-metre Shaft
M&I: 3.45 Mt @ 0.97% Ni, 0.52% Cu, 0.013% Co (74 Mlb Ni)
Inferred: 1.01 Mt @ 1.47% Ni, 0.67% Cu, 0.011% Co (32.7 Mlb Ni)
Kenora
Sioux Narrows
Heritage Mining Ltd
Turtle Pond ProjectEagle Plains Resources Ltd.
100% OWNED EARLY-STAGE NICKEL-COPPER PROJECT
Historic drilling (Double E): 4.2 m @ 0.81% Ni, 0.52% Cu, with Pt-Pd-Au credits
Historic surface sampling (Glatz): up to 1.28% Ni and 4.06% Cu
Timmis
Usha Resources Ltd.
GT Resources Inc.
Talon Metals & Rio Tinto (JV)
Mineral and Metal Occurrences
Antofagasta Plc. Teck & PolyMet (JV)
Talon Metals Corp.
Lundin Mining Corp.
Sill Lake ProjectEmpire Exploration
Sterling Metals Corp.
Sault Ste Marie
Vale Canada
Glencore
Sudbury
Nickel Copper Silver
100% OWNED Past Producing SILVER-LEAD PROJECT
Historic NI 43-101 Mineral Resource (SMX, 2021) on the Main Vein highlights strong silver grades with lead credits:
Measured + Indicated: ~458,000 oz Ag @ ~4.4 oz/t
Associated metals: ~1.47 Mlbs Pb, ~0.5 Mlbs Zn
eap
Minn olCisSE: TN OTCQB: TTSRF
FSE: 8TA 4
Minnesota
Nicobat Project
Superior Nickel Project
Kenbridge Project
Mayburn Project
Sioux Narrows
Contact Bay Project
Ontario Gold Project
Dryden
Kenora
Winnipeg
Armit Lake Project
Makwa Project
Bird River Project
Kenbridge Ni-Cu-Co Project - Scale, Access & Relationships
Massive Sulfides exposed at surface
Located in a mining friendly jurisdiction of Northwestern Ontario outside of Sioux Narrows
4,724 ha (47 Kmଶ) land position
All season road access
Close proximity (40 km) to grid power
Regional population of 35,000
Signed Exploration Agreement in place with the Region's Treaty #3 First Nations Communities
CSE: TN
OTCQB: TTSRF
FSE: 8TA
5
KENBRIDGE - ALL SEASON ACCESS ROADKENBRIDGE HISTORICAL WORK INCLUDES
118,540 m of drilling in 612 holes between 1952 and 2026
Development includes a 3-compartment timber lined shaft to a depth of approximately 623 m
Underground lateral development includes drifts to the mineralized zones and sill drifting on the 110 m and 150 m levels
Approximately 775 m of underground lateral development
Part of the North American supply chain, with the Kenbridge deposit the focus.
A. Open pit and underground | B. Underground | |||||||
MRE, June 2021 | PEA, July 2022 | |||||||
Measured & Indicated | 7.40 Mt | 0.60 % Ni | 0.32 % Cu | Measured & Indicated | 3.45 Mt | 0.97 % Ni | 0.52 % Cu | |
Inferred | 0.99 Mt | 1.00 % Ni | 0.62 % Cu | Inferred | 1.01 Mt | 1.47 % Ni | 0.67 % Cu | |
117 M lb nickel · 66 M lb copper contained 107 M lb nickel · 54 M lb copper contained
FIRST NATIONS AGREEMENT - TREATY # 3Treaty # 3: 28 First Nations under one flag, 55,000 sq. miles, 142,000 sq. kms of traditional territory
Ongoing engagement and partnership with Treaty # 3 since May 2007
Tartisan upholds and continues to practice in the "Great Earth Law" authorization process
Received first ever Great Earth Law authorization for a resource company from Treaty #3 Grand Council for the Kenbridge access road construction
Recognized by Ogichidaa (Grand Chief) as a leader in Aboriginal relations
Commitment to forge FN relationships built on trust and respectful engagement on all projects
Treaty #3 Communities for Kenbridge
Naotkamegwanning (Whitefish)
Northwest Angle # 33
Animakee Wa Zhing #37
Onigaming
Manitou Rapids
Eagle Lake
n Pit
View looking down
0 10
Kenbridge Ni-Cu-Co Deposit - Historic Drill Holes- 400
View looking SW
0 100 200
553 m
- 100
Resource
Mineralization Shell Assays Ni (%)
< 0.01
0.01 - 0.05
0.05 - 0.1
0.1 - 0.5
> 0.5
835 m
+200
Shaft and Levels
Proposed Open Pit
Outline
Proposed Ope
Outline
10
Kenbridge Deposit - Phase 1 Drill Results+300
KB26-207 intersected:
A Zone: 10.7 m @ 1.58% Ni, 0.79% Cu and 0.04% Co, from 493.0 to 503.7 m
B Zone: 9.1 m @ 0.59% Ni, 0.20% Cu and 0.02% Co, from 532.4 to 541.5 m
+150
KB26-208 intersected:
A Zone: 3.0 m @ 0.62% Ni, 0.28% Cu and 0.02% Co, from 571.5 to 574.5 m
B Zone: 11.0 m @ 1.05% Ni, 0.33% Cu and 0.03% Co, from 580.5 to 591.5 m
0
-150
KB26-210 intersected:
A Zone: 0.71% Ni, 0.56% Cu and 0.02% Co from
762.4 to 787.0m
B Zone: 0.27% Ni, 0.24% Cu and 0.01% Co from
800.2 to 806.0m
-300
NE
KB26-209 intersected:
A Zone: 1.4m @ 0.31% Ni, 0.26% Cu
and0.01% Co, from 823.6 to 825 m
B Zone: 3m @ 2.17% Ni, 1.45% Cu and0.05% Co, from 862.5 to 865.5m
-450
0
View looking SE
100 200
Recent results confirm that the mineralized body remains open to the Northeast.
The deepest complete hole to date, KB26-209, intersected mineralized zones A and B, hosting strong nickel sulphide mineralization, including high-grade internal intervals, although narrow.
The intersection suggests we hit the edge of the orebody and Borehole EM surveys
will be performed in the spring to identify the potential mineralization nearby.
To date, a total of 3340 meters have been drilled as part of the Phase-1 winter drill program, completed in Spring 2026.
Extensional and Exploratory Drilling to expand Kenbridge Ni-Cu-Co Resource on strike to the north and down dip.
Test the new interpreted BHEM-209 conductor with Phase 2 drilling.
Upgrade 1Mt of Inferred Resource into Indicated.
Advance project permitting process, continue baseline studies.
Evaluate, assess and drill regional targets utilizing geophysical, geochemical and satellite imagery. Utilize & Evaluate MLAS historic and in-house information.
Outreach and communication to local communities in partnership - best practices.
for up to 5,000 m of drilling at $350/m
4 holes3 deep + 1 shallow, P1-P4
4 monthsstart to finish
A deposit with 118,540 m of drilling, a 623 m shaft and 775 m of lateral development already in the ground.
Phase One completed in Spring 2026: 3,340 m drilled, borehole EM through all of it, and 810 line-km flown over the property.
It produced three modelled conductors. One of the new interpreted conductors (BHEM-209), has never been drilled.
Road, camp and core shed are in place. Four drill pads are already built; two new pads to construct.
Three holes test the deposit down-dip from one pad (1,300-1,500 m each); one hole cuts the modelled BHEM-209 conductor perpendicular (750 m).
Hole Pad Length Target
P1 | A | 1,300 m | Deposit down-dip from Pad A |
P2 | A | 1,300 m | Deposit down-plunge, same pad |
P3 | A | 1,500 m | Deepest hole on the property - orientation to be set from P1/P2 results |
P4 | B | 750 m | Perpendicular to the modelled BHEM-209 conductor - new Pad B |
Three holes down-dip of the deposit from one pad, one hole across the BHEM-209 conductor. Minimum 2,000 m, maximum 5,000 m in 4-5 holes; hole lengths 500-1,500 m, average about 1,000 m.
Phase 2 Drill Pads in Place Proposed Holes P1-P4 - Plan on Satellite ImageryKenbridge Budget | ||||
PHASE TWO - THIS FINANCING | PHASE THREE - NOT IN THIS RAISE | |||
Drilling - 5,000 m at $350/m, 3 deep holes + 1 shallow | 1.75 | Environmental, social, access road | 1.50 | |
Geologists, core handling, QA/QC | 0.36 | Pre-feasibility study | 1.00 | |
Camp, fuel, transport | 0.30 | Management and G&A | 0.50 | |
Borehole EM - 4 holes | 0.12 | Geological and geophysical exploration | 0.40 | |
Laboratory assays | 0.15 | Mineral processing and met testing | 0.30 | |
Project management and reporting | 0.20 | Apex greenfields work | 0.20 | |
Permits, environment, First Nations | 0.17 | Subtotal | 3.90 | |
Subtotal | 3.05 | Contingency | 0.59 | |
Contingency | 0.45 | PHASE THREE TOTAL ($M) | 4.49 | |
PHASE TWO TOTAL ($M) | 3.50 | |||
Phase Two is what is being raised now
Drilling is budgeted at a quoted $350 per metre all in, drill site construction included: three deep holes (1,300, 1,300 and 1,500 m) and one 750 m hole, 4,850 m planned and 5,000 m budgeted for $1.75 M - $3.5 million for the full program. Phase Three is funded by Phase Two results, not by this financing.
Sill Lake Silver-Lead-Zinc-Gold Project (Formerly Prace Mine)100 % owned silver-lead-zinc project, about 30 km north-east of Sault Ste. Marie, Ontario, in a proven mining district. An advanced brownfields opportunity on the Main Vein.
458,000 oz
silver, Measured and Indicated
660,000 oz
silver, Inferred
~US$60
silver today, per ounce
~US$21
silver when it was counted
The price has more than doubled since the estimate was made
The Sill Lake resource was last counted in 2021, when silver traded near US$21 an ounce. The ounces have not changed; what they are worth has. No Phase Two money is being spent here - it is simply an asset the company already owns.
Sill Lake - Site Visit with Batchewana and Garden River First Nations Signedagreement in place with Batchewana First Nation
On sitemeeting with Batchewana and Garden River
Samplingsurface grab samples collected
Galena in quartz - surface grab sample
Tartisan has a signed agreement with Batchewana First Nation for Sill Lake, and met Batchewana and Garden River First Nations on the ground at the property - walking the former Prace Mine workings together before any new exploration begins.
Signed agreement with Batchewana First Nation; site meeting held at the property with representatives of both communities.
Surface sampling of the historic workings and mineralized outcrop carried out during the visit; samples submitted for assay.
Walked the communities through how Tartisan explores: low-impact sampling, no new disturbance, and how a drill program would be laid out and reclaimed.
Open dialogue on community priorities, land use and employment - the same partnership approach that works for us in Treaty #3 at Kenbridge.
MARKET CAPITALIZATION
~C$16 M
fully diluted, at C$0.10 per share
OPTIONS OUTSTANDING
NIL
no options issued
WARRANTS OUTSTANDING
2,721,057
the only dilution on the books
Capitalization As at 4 November 2026
Shares outstanding 158,195,904
Options NIL
Fully diluted 160,916,961
Warrants 2,721,057
Capital structure as at 4 November 2026. Market capitalization shown on a fully diluted basis at an assumed C$0.10 per share.
A 623 m shaft, camp, core shed and all-season road are already built. New money goes into resource building.
| Attention: This is an excerpt of the original content. To continue reading it, access the original document here. |
