Red Dam drilling results - 2.6m @ 34.8 g/t gold
Filed with ASX · · 18 pages · English
Summary by 6ix AI
The report highlights that three diamond drill holes were completed, with the best assay result being a significant gold intersection from one of the holes. Additionally, five Reverse Circulation holes were drilled, and assay results from these are pending. The drilling aimed to validate historical results and gather samples for metallurgical testwork, confirming the presence of gold mineralisation at Red Dam.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Savannah Goldfields Limited on 6ix
Story so far
Earlier from Savannah Goldfields
- Georgetown Gold Project Exploration Update
- Gold Production Resumes
- Georgetown Project Update on Resumption of Gold Production
- Exploration Drilling Resumes at Georgetown Gold Project
- Highgrade Gold Drilling Results at Electric Light
Later from Savannah Goldfields
- Red Dam High Grade Gold Drill Results
- Further High Grade Gold Drill Intercepts at Electric Light
- Quarterly Activities Report
- Quarterly Cashflow Report
- Gold Production Update
Follow Savannah Goldfields into a list and get an email when it puts out news.
Follow Savannah Goldfields