Quarterly Activities/Appendix 5B Cash Flow Report
Filed with ASX · · 29 pages · English
• First Phase of RC drilling successfully completed at Top Camp prospect within the Croydon gold project in the Pilbara, with 22 RC holes for 3,885 metres drilled in the program • Top Camp was last drilled in 2019-20, when shallow gold mineralisation was discovered in the Mallina Basin sediments. Significant intersections included: • 27m at 3.2g/t Au from 135m in CRC007 o Including 8m at 10.0g/t A
Earlier from CZR Resources
- RC drilling underway at Croydon Gold Project
- RC Drilling set to start at Croydon Gold Project
- Drilling commences at Croydon gold project
- Resources Rising Stars Investor Conference Presentation
- Vesting of Options and Performance Rights
Later from CZR Resources
- Croydon Gold Project - Strong Initial Gold Assay Results
- Shallow Gold Mineralisation and High-Grade Shoots at Croydon
- CZR exploration commences at Croydon Gold Project
- Management and Board Changes
- CZR Resources acquisition of Zuleika Gold Presentation
Follow CZR Resources into a list and get an email when it puts out news.
Follow CZR Resources