PTR: Exploration Success Continues at Muckanippie
Filed with ASX · · 25 pages · English
• Drill results continue to expand the footprint of the very high-grade titanium discovery at Muckanippie. • Drilling intercepted thick, high-grade Heavy Mineral (HM) from surface at both the Nardoo and Duke HM saprolite targets, less than 10km from PTR’s high-grade Rosewood Titanium Project including: Duke Prospect o 60m @ 39.3% HM from surface incl. 6m @ 61.6% HM from 25m (25DK005) o 24m @ 26.1%
In the deck
Story so far
Earlier from PTR Minerals
- PTR: Positive Metallurgical Result from Rosewood Bulk Samples
- PTR: Resource Drilling Underway at Rosewood
- PTR: Drill Program Extends Rosewood & Identifies New HMS Zone
- PTR: Muckanippie Project Update
- Muckanippie Project Joint Venture
Later from PTR Minerals
- Trading Halt
- $12m Placement provides funding to accelerate Rosewood
- PTR: Resource Drilling Confirms Consistent High-Grade Titan
- Application for quotation of securities - PTR
- PTR: Drilling Reinforces Quality &Scale Potential of Rosewood
Follow PTR Minerals into a list and get an email when it puts out news.
Follow PTR Minerals