Positive drill results from Julia prospect at Battery Hub
Filed with ASX · · 14 pages · English
Earlier from QPM Energy
- Phase 1 Drilling Completed
- Commencement of Drilling
- Additional high-grade rock-chip sampling results
- Second Battery Hub Tenement Granted
- Quarterly Activities and Cashflow Report
Later from QPM Energy
- Drilling Results at Pools Prospect
- Initial Drilling Results Steven Ridge Isles
- $700,000 Capital Raising Complete
- Metallurigal Testwork Results
- Metallurgical Testwork Results Revised Version
Follow QPM Energy into a list and get an email when it puts out news.
Follow QPM Energy