Right Resources LimitedASX: RRE

Pilot Gold Testwork Achieves 89.9% Gold Extraction at 24 Hrs

· Issued by Right Resources Limited via ASX

Filed with ASX · · 13 pages · English

Summary by 6ix AI

Right Resources Limited has announced positive preliminary metallurgical testwork results from its Pilot Gold Project, achieving significant gold extraction rates using conventional cyanide leaching methods. Additionally, the results showed promising gold upgrading through gravity concentration, suggesting the presence of a coarse-gold component that warrants further investigation. The company plans to conduct additional studies to better understand gold distribution and optimize recovery processes at the Pilot site.

Written by 6ix AI from the company’s filing. How 6ix writes summaries

Release

ASX Announcement 27 October 2026 Pilot Gold Testwork Achieves 89.9% Gold Extraction at 24 Hours Preliminary cyanide leach results support further metallurgical assessment at Pilot Highlights • Gold extraction of 89.9% achieved after 24 hours in a conventional cyanide bottle-roll test at P80 75...

Right Resources Limited on 6ix

Earlier from Right Resources

Later from Right Resources

All Right Resources news releases