Phase 6 Drilling Identifies New Gold Targets at Edjudina WA
Filed with ASX · · 25 pages · English
• Phase 6 aircore drilling at the Edjudina Gold Project has identified two new +300 metre strike length targets for follow-up drilling at the Ace of Hearts and Triumph prospects • Phase 6 drill intersection highlights include: Hole ID From (m) To (m) Interval (m) Plus numerous other mineralised intersections (Appendix A) • Infill drilling at Neta confirms the consistency of gold mineralisation to
Gibb River Diamonds Limited on 6ix
Story so far
Earlier from Gibb River Diamonds
- Completion of Phase 6 Drilling at Edjudina Gold Project
- AGM Presentation 2021
- Phase 6 Drilling Commences at Edjudina Gold Project
- Phase 5 Drilling Grows Neta Gold Prospect - 23m @ 1.61g/t
- STK: High Grade Zinc-Led Discovery in Earaheedy Basin
Later from Gibb River Diamonds
- Excellent Further Drill Results - Iroquois Zinc Prospect, WA
- Drilling to Commence 3 March at Edjudina Gold Project
- Iroquois Soil Sampling Highlights Zinc-Lead Feeder Zone
- STK: High Grade Zinc-Lead Intersections at Iroquois
- Phase 7 Drilling Commences at Edjudina Gold Project, WA
Follow Gibb River Diamonds into a list and get an email when it puts out news.
Follow Gibb River Diamonds