Peak Result at Toro`s Theseus Project of nearly 1% eU3O8
Filed with ASX · · 5 pages · English
• Toro Energy Limited (ASX: TOE - “Toro”) is very pleased to announce that drilling at the Theseus Project in WA, near the NT border, has continued to record strong uranium discovery results. In particular drill hole LM0052 recorded a peak result of nearly 9,000ppm (0.9% eU3O8) within an interval of 3.44m @ 1,137ppm eU3O8. • The tenor of the mineralisation in this hole provides further evidence of
Follow Toro Energy into a list and get an email when it puts out news.
Follow Toro Energy