Monument Mining LimitedTSXV: MMY

Monument Drill Results Identify Additional Gold Mineralization at Buffalo Reef, Malaysia

· Issued by Monument Mining Limited via CNW

Key figures

  • MBRDD048 intersected 33.0 meters assaying 1.23 g/t Au (includes 2.0m at 6.77 g/t) at Central Buffalo Reef
  • MBRDD063 intersected 7.3 meters assaying 2.37 g/t Au (includes 3.0m at 5.25 g/t) at Central Buffalo Reef
  • MBRRC210 intersected 4.0 meters assaying 5.51 g/t Au (includes 2.0 m at 10.25 g/t) at North Buffalo Reef
  • MBRRC246 intersected 10.0 meters assaying 1.62 g/t Au (includes 1.0 m at 3.91 g/t) at Central Buffalo Reef

On 6ix: 6ix.com/news/monument-drill-results-identify-additional-gold-mineralization-at-buffalo-reef-malaysia

- Intercepts 33.0 meters at 1.23 g/t Gold in Oxide and 13.5 meters at 3.83 g/t Gold in Sulfide -

VANCOUVER, Feb. 4, 2014 /CNW/ - Monument Mining Limited (TSX-V: MMY and FSE: D7Q1) "Monument" or the "Company" today disclosed recent drill results from its FY2013 Buffalo Reef gold exploration and delineation drilling program in Malaysia. The best intercepts were 33.0 meters at 1.23 g/t gold in Oxide and 13.5 meters at 3.83 g/t gold in Sulfide.

"These results, which are consistent with those that have been previously drilled, reported and modeled, show that we have successfully targeted and identified additional oxide and gold mineralization at Buffalo Reef," said Todd Johnson, VP Exploration for Monument Mining. "We expect that our next NI 43-101 resource estimate, anticipated in the spring of 2014, will show improved reserves and resources in part because of the inclusion of these results."

Added Ian Bruce, Chief Managing Geologist for Monument Mining, "The local Geology and Drilling staff continues to work hard to identify additional near-mine mineralization at Buffalo Reef and Selinsing for potential development.  We continue to streamline the logging and sampling process at site to help achieve a faster assay turnaround time from the primary certified commercial labs."

Drilling continues to expand the mineralization at Buffalo Reef, Selinsing, and the adjacent FELDA lands with two diamond drills owned and operated by Monument. The drilling is focused within and adjacent to the operating Buffalo Reef South open pit and north of the operating Selinsing open pit gold mine.

ASSAY HIGHLIGHTS IN OXIDE

  • MBRDD048 intersected 33.0 meters assaying 1.23 g/t Au (includes 2.0m at 6.77 g/t) at Central Buffalo Reef
  • MBRDD063 intersected 7.3 meters assaying 2.37 g/t Au (includes 3.0m at 5.25 g/t) at Central Buffalo Reef
  • MBRRC209 intersected  20.0 meters assaying 1.01 g/t Au at North Buffalo Reef

ASSAY HIGHLIGHTS IN SULFIDE

  • MBRDD022 intersected 13.5 meters assaying 3.83 g/t Au under the South Buffalo Reef pit
  • MBRDD043 intersected  13.5 meters assaying 3.77 g/t Au under the South Buffalo Reef pit
  • MBRRC210 intersected 4.0 meters assaying 5.51 g/t Au (includes 2.0 m at 10.25 g/t)  at North Buffalo Reef
  • MBRRC253 intersected 4.0 meters  assaying 4.12 g/t Au at Central Buffalo Reef
  • MBRRC246 intersected  10.0 meters assaying 1.62 g/t Au (includes 1.0 m at 3.91 g/t) at Central Buffalo Reef

Background on the exploration program

From October 2007 to December 31, 2013, a total of 438 diamond (DDH) and reverse-circulation (RC) drill holes for 35,452 meters have been completed at the two Buffalo Reef tenements MC 1/107 and MC 1/111 (excluding FELDA lands). The campaign is more fully described in the table below:

Fiscal year# Drill
Holes
Meters
Drilled
Type
2008October 2007 to June 20081268,725RC
2009July 2008 to June 2009393,155RC
2010July 2009 to June 20102212DDH
2011July 2010 to June 20112217DDH
2012July 2011to June 2012203,689DDH
2013July 2012 to June 201321616,722DDH/RC
2014July to December 2013332,732DDH
Total43835,452DDH/RC

Table 1 and 2 below list recently compiled, significant Buffalo Reef drill hole assays received between April and December 31, 2013.  Complete tables of diamond and RC drilling results and drill hole details along with maps showing Monument's Buffalo Reef drill hole locations that are presented in this press release are posted on the Company's website at www.MonumentMining.com.

The recently reported Buffalo Reef drill results have been targeting and successfully identifying additional significant oxide and sulfide gold mineralization at the Buffalo Reef North and Central-South deposits, both laterally and below the location of the existing resource estimate made as of August 31, 2012 NI 43-101 , which Monument hopes will extend the project's life-of-mine.  Another objective of the fiscal year (FY) 2013 and FY2014 drilling was to maximize the conversion of Inferred Resources to Indicated or Measured classifications.  The reported sulfide drill hole intercepts in this press release occur down-dip of the oxide intercepts and locally contain higher grade intervals.

The gold mineralization is hosted in a series of north-south and en echelon northeast-southwest striking quartz veins which dip moderately to the east, within a north-south 4 km long structural-mineralized corridor. The host rocks consist of an interbedded sequence of variably graphitic phyllite, calcareous tuffaceous argillite, tuffaceous arenite, and felsic tuff with cataclasite and locally mylonitic deformation. The sulfide mineralization may contain quartz veins with pyrite, arsenopyrite plus/minus stibnite as disseminations and veinlets.

In FY2014, an additional drill program using the two Monument-owned diamond drilling rigs is currently underway in priority areas of all tenements and is following up drilling results from FY2013. Assays for another 66 drill holes drilled at Buffalo Reef in fiscal 2013 and fiscal 2014 are pending and will be reported in the near future, along with recently received assay results from Selinsing and the adjacent FELDA land, which is located to the east of and between the Buffalo Reef South and Central resource areas. For timing reasons the 66 drill holes whose assays are pending will not be incorporated into the spring 2014 resource update but will be incorporated into a subsequent resource update.

Quality Control
The scientific and technical information in this press release has been compiled by Ian Bruce, Chief Managing Geologist for Monument Mining Limited (M.Sc., AIG) who is a Qualified Person as defined by NI 43-101 guidelines and has been working in Malaysia for Monument since October 21, 2012. This press release has been reviewed by Todd Johnson (M.Sc., P.E.), Vice President of Exploration for Monument Mining Limited, who is also a Qualified Person as defined by National Instrument 43-101 guidelines and has verified and approves of the scientific and technical information in this press release.

Drill holes at Buffalo Reef are being sampled and logged at site in a secured and fenced area within the mine site and the core facility is locked during nonbusiness hours.  Most of the drill hole samples are shipped to SGS Malaysia at their Port Klang facilities for sample preparation and analysis.  SGS Malaysia is an accredited lab that complies with ISO 17025:2005 requirements.  The samples are dried, crushed to 90% passing 4.0 mm and pulverized to 90% passing -75 microns and analyzed for:   Au fire assay (2 assay ton) using the FAA505 analysis method and ICP analysis (ICP-OES method) for  Ag, As and Sb.  Some of the FY2013 Buffalo Reef drill holes were also prepared and analyzed at certified labs in Jakarta, Indonesia (PT. Intertek), and in Richmond, Canada (ACME) that follow similar sample preparation and analysis protocols as listed above for SGS Malaysia.

The Buffalo Reef and Selinsing exploration and delineation drilling programs includes a Quality Control and Quality Assurance (QAQC) program that meet the present NI 43-101 guidelines.  Certified Au standards and non-certified blank materials are inserted approximately every 20 drill samples into the sample sequence. In addition, every 1 in 20 RC drill hole sample intervals is prepared using a riffle splitter and is submitted into the sample stream to the primary assay lab as a secondary split duplicate "check".  Duplicate coarse reject (approximately every 1 in 40 samples) and pulp (approximately every 1 in 20 samples) drill hole samples are being dispatched from the primary laboratories (SGS Malaysia Sdn. Bhd. and PT. Intertek, Indonesia) under instruction by Monument to a secondary certified "umpire" assay lab (ALS, Malaga, Western Australasia).

Assay results reported in this press release are drill thicknesses but approximate true thickness as most drill holes are generally oriented at a magnetic azimuth of 270 degrees with an inclination of 50 to 70 degrees (near perpendicular to the strike and dip of the mineralized zones).  All reported drill hole assay results in this press release are generally associated with recoveries greater than 80 percent for diamond drilling or greater than 40% for RC drilling.

Vote for Monument's incumbent board

Monument's incumbent eight-person board, which has been nominated for re-election, intends to continue to grow the Company's profitable mines in Malaysia and to advance its projects there and elsewhere, creating sustainable and growing value for all shareholders.

Monument urges shareholders to vote for the incumbent board members and allow them to continue to work for the benefit of all shareholders. Vote the Management proxy to keep the dissident team off of the Monument board. Don't let dissidents seize your company and take it in unknown directions.

YOUR VOTE IS IMPORTANT
PLEASE VOTE USING ONLY MANAGEMENT'S PROXY TODAY!

Your vote is important regardless of the number of shares you own. Monument encourages Shareholders to read the meeting materials in detail. A copy of the Management Information Circular is available on the Company's website at www.monumentmining.com or on SEDAR at www.sedar.com.

The board of directors of Monument recommends that Shareholders vote IN FAVOUR of all proposed items.

Vote today FOR Monument's board using only Management's proxy

As time is of the essence, Shareholders are encouraged to vote via the internet or by telephone by following the instructions found on the proxy or voting instruction form.

The deadline to vote is February 5, 2014 at 9 a.m. (Pacific Time). However, Shareholders are encouraged to vote 24 hours in advance of the deadline to ensure their votes are received in a timely manner.

If a Shareholder has voted on the Dissident's proxy and would like to change their vote to support Management, simply vote again using Management's proxy. It is the later dated proxy which will count at the Meeting. If Shareholders have already voted using Management's proxy, there is no need to take further action. Please discard any proxy from the Dissident group.

Shareholder Questions

Shareholders who have questions or have not received their proxy or voting instruction form may contact the Proxy Solicitation Agent below:

Laurel Hill Advisory Group
Toll free: 1-877-452-7184 (416-304-0211 collect outside Canada and the US)
Email: [email protected].

About Monument
Monument Mining Limited (TSX-V:MMY, FSE:D7Q1) is an established Canadian gold producer that owns and operates the Selinsing Gold Mine in Malaysia, with  production cash costs among the lowest in the world.  Its experienced management team is committed to growth and is advancing several exploration and development projects in Malaysia, including the development stage, Mengapur Polymetallic Project. The Company employs 330 people in Malaysia and is committed to the highest standards of environmental management, social responsibility, and health and safety for its employees and neighboring communities. In addition, the Company's recent acquisition announcement of the Murchison Gold Project located in Western Australia will add to its project pipeline and diversify its single project cash flow source, country risk and potential metal profile.

Robert F. Baldock, President and CEO
Monument Mining Limited
Suite 910- 688 West Hastings Street
Vancouver B.C. Canada V6B 1P1

Table 1.  Summary of Significant FY2013 and FY2014 Buffalo Reef Diamond Drill Hole Intercepts Received as of December 31, 2013.

DHIDTenement
No.
Hole Depth
(m)
Depth From
(m)
Depth To
(m)
Thickness
(m)
Au (g/t)Mineralization
Type
MBRDD019MC 1/107203.067.5068.300.801.18Oxide + Sulfide
119.60122.603.002.64Sulphide
MBRDD020MC 1/107300.3230.35231.571.221.16Sulphide
MBRDD022MC 1/111280.02.006.504.500.82Oxide
60.2061.201.002.85Sulphide
143.00147.004.001.29Sulphide
149.00162.5013.503.83Sulphide
189.50191.001.504.94Sulphide
MBRDD023MC 1/111200.0128.30129.301.000.99Sulphide
155.20158.303.101.03Sulphide
162.80165.302.502.46Sulphide
171.70172.600.900.82Sulphide
MBRDD024MC 1/111200.0112.10117.505.400.67Sulphide
134.50139.605.100.67Sulphide
148.70153.504.800.91Sulphide
MBRDD026MC 1/111150.523.9025.401.500.63Sulphide
104.00105.501.501.60Sulphide
108.40114.606.200.77Sulphide
MBRDD027MC 1/111150.578.6080.001.400.90Oxide + Sulfide
119.30129.5010.201.92Sulphide
MBRDD028MC 1/111250.3144.50145.501.001.56Sulphide
MBRDD029MC 1/111200.00.009.509.500.81Oxide
68.7069.600.901.25Sulphide
105.80107.001.201.08Sulphide
127.50128.501.002.21Sulphide
138.50149.0010.501.17Sulphide
including143.00144.501.503.59Sulphide
MBRDD030MC 1/111251.0122.00122.700.707.49Sulphide
133.20137.003.801.80Sulphide
193.60195.101.501.70Sulphide
MBRDD031MC 1/111192.5146.60153.506.901.53Sulphide
162.50173.8011.301.50Sulphide
MBRDD033MC 1/111100.056.0057.201.201.44Sulphide
MBRDD036MC 1/11150.00.0014.3014.304.91Oxide
including3.508.004.5011.27Oxide
MBRDD037MC 1/11170.00.0011.0011.001.13Oxide
MBRDD039MC 1/111111.180.7091.7011.001.40Sulphide
including88.8090.401.605.08Sulphide
MBRDD040MC 1/111100.565.0066.501.500.78Sulphide
MBRDD041MC 1/111101.024.0027.303.300.80Sulphide
87.0089.802.804.62Sulphide
MBRDD043MC 1/111121.557.5060.503.001.28Sulphide
94.7098.003.301.34Sulphide
101.00114.5013.503.77Sulphide
MBRDD045MC 1/111110.0107.90110.002.101.54Sulphide
MBRDD046MC 1/111160.585.6088.002.401.16Sulphide
110.00111.401.401.40Sulphide
117.40122.505.102.57Sulphide
128.00132.004.002.31Sulphide
DHIDAreaHole DepthDepth From
(m)
Depth To
(m)
Thickness
(m)
Au (g/t)Mineralization
Type
MBRDD047MC 1/10760.030.5033.503.002.94Oxide + Sulfide
38.7039.500.800.75Sulphide
51.3053.001.701.63Sulphide
MBRDD048MC 1/10760.08.0041.0033.001.23Oxide
17.0019.002.006.77Oxide
MBRDD052MC 1/10780.053.5057.103.602.12Sulphide
MBRDD053MC 1/10765.03.506.503.000.57Oxide
27.5030.503.001.21Sulphide
MBRDD054MC 1/10760.06.5012.506.002.67Oxide
MBRDD055MC 1/10780.030.6037.506.901.13Oxide + Sulfide
44.0045.201.200.35Oxide + Sulfide
48.5050.502.001.05Sulphide
52.9056.603.700.81Sulphide
MBRDD057MC 1/10750.027.5035.007.501.13Oxide
MBRDD058AMC 1/107101.032.0033.501.500.55Oxide
MBRDD059MC 1/10750.09.5016.006.502.22Oxide
MBRDD061MC 1/10750.00.005.005.003.55Oxide
MBRDD062MC 1/10765.03.5011.007.500.76Oxide
including8.009.501.501.78Oxide
18.5024.506.001.52Oxide
MBRDD063MC 1/10765.09.5016.807.302.37Oxide + Sulfide
including9.5012.503.005.25Oxide + Sulfide
MBRDD064MC 1/107189.00.002.502.500.71Oxide
MBRDD069MC 1/107120.045.4053.608.200.79Oxide + Sulfide
67.9069.501.601.33Oxide + Sulfide
MBRDD071MC 1/10771.033.5035.001.500.77Sulphide
54.9059.804.902.03Sulphide
including56.0059.003.003.04Sulphide
65.9069.803.901.98Sulphide
MBRDD083MC 1/107180.03.004.501.5011.30Oxide
MBRDD088MC 1/107101.075.5091.5016.001.11Sulphide
MBRDD092MC 1/10740.026.5035.008.501.12Oxide + Sulfide
MBRDD105MC 1/107100.064.5066.001.500.33Oxide
Notes:
(1) Drill hole samples were  assayed at certified labs:  SGS in Port Klang, Malaysia or PT. Intertek in Jakarta,  Indonesia;
(2) Buffalo Reef diamond drill holes with no significant assays (<0.31 g/t Au in oxide  and <0.62 g/t Au in sulfide mineralization):
MBRDD032, 038, 050, 056, 058, 060, 065-067, 070, 078, 081-082, 084-087, 089, 091, 093, 096-098, 100-104, 106, 109, and 110;
(3)  All reported drill hole assay intercepts are generally associated with >80% recovery except MBRDD037 (62%), MBRDD048
(68%), MBRDD057 (68%), MBRDD059 (63%), MBRDD062 (59%, 68%), MBRDD064 (64%), MBRDD083 (47%).
(4) Buffalo Reef diamond drill holes with assays in progress:  MBRDD068, 072, 073, 075-077, 079, 080, 090, 094, 095, 099, 107,
108, 111-115, 118,120,123, 125, 127-128, 130, 132, 135, 137-138, 140, 141, 143-146, 148, 150-151, 153, 155, 157, 160,
278-280, 282, 320, 324-340, and 349-350;
(5) Mineralisation is described as "Oxide + Sulfide" if geological logging indicates that the relevant interval contains alternating
zones of oxidised and fresh rock, or is oxidised rock containing some sulphide minerals below the base of pervasive oxidation.

Table 2.  Summary of Significant FY2013 and FY2014 Buffalo Reef Reverse Circulation Drill Hole Intercepts Received as of December 31, 2013.

DHIDTenement
No.
Hole Depth
(m)
Depth From
(m)
Depth To
(m)
Thickness
(m)
Au (g/t)Mineralization
Type
MBRRC182MC 1/11160.00.003.003.000.61Oxide
MBRRC184MC 1/11160.019.0024.005.001.38Oxide
MBRRC186MC 1/11151.017.0019.002.003.21Oxide
including18.0019.001.005.98Oxide
20.0025.005.009.43Sulphide
36.0037.001.000.63Sulphide
MBRRC187MC 1/11160.00.009.009.001.94Oxide
17.0025.008.002.51Oxide + Sulfide
25.0027.002.003.63Sulphide
MBRRC191MC 1/11146.023.0024.001.000.88Sulphide
MBRRC195MC 1/11150.04.006.002.001.90Oxide
15.0017.002.000.65Oxide
MBRRC200MC 1/11160.04.009.005.001.66Oxide
MBRRC208MC 1/10730.00.003.003.000.88Oxide
MBRRC209MC 1/10780.07.0027.0020.001.01Oxide
including7.008.001.003.02Oxide
MBRRC210MC 1/10750.037.0041.004.005.51Sulphide
including37.0039.002.0010.25Sulphide
MBRRC211MC 1/10750.026.0027.001.000.66Oxide
39.0042.003.000.73Oxide
MBRRC212MC 1/10754.029.0043.0014.000.59Oxide
including32.0037.005.001.07Oxide
MBRRC214MC 1/10735.01.004.003.000.64Oxide
MBRRC216MC 1/10745.04.005.001.000.92Oxide
MBRRC219MC 1/10765.061.0062.001.001.29Sulphide
MBRRC220MC 1/10790.00.003.003.002.77Oxide
8.009.001.001.44Oxide
87.0089.002.000.65Sulphide
MBRRC222MC 1/10750.05.008.003.000.47Oxide
8.0015.007.001.10Oxide + Sulfide
MBRRC224MC 1/10760.044.0049.005.002.03Sulphide
including44.0045.001.006.02Sulphide
55.0057.002.001.58Sulphide
MBRRC225MC 1/10750.031.0032.001.000.43Oxide
MBRRC232MC 1/10725.014.0019.005.001.99Oxide
22.0023.001.003.20Oxide + Sulfide
MBRRC233MC 1/10770.02.008.006.000.75Oxide
including7.008.001.002.59Oxide
MBRRC236MC 1/10760.036.0043.007.001.25Oxide
including36.0038.002.003.06Oxide
47.0050.003.002.23Sulphide
MBRRC237MC 1/10740.020.0022.002.000.70Oxide
27.0030.003.001.56Sulphide
MBRRC238MC 1/10765.032.0033.001.001.22Oxide
MBRRC240MC 1/10760.01.004.003.003.63Oxide
MBRRC245MC 1/10760.035.0042.007.002.04Sulphide
including39.0040.001.005.38Sulphide
56.0057.001.000.75Sulphide
DHIDTenement
No.
Hole Depth
(m)
Depth From
(m)
Depth To
(m)
Thickness
(m)
Au (g/t)Mineralization
Type
MBRRC246MC 1/10760.045.0046.001.000.75Sulphide
50.0060.0010.001.62Sulphide
including53.0054.001.003.91Sulphide
MBRRC248MC 1/10760.040.0045.005.002.21Oxide + Sulfide
MBRRC249MC 1/10730.023.0024.001.000.70Oxide
MBRRC252MC 1/10750.015.0034.0019.000.62Oxide
31.0032.001.004.05Oxide
43.0045.002.002.43Oxide
48.0049.001.000.32Oxide
MBRRC253MC 1/10740.07.0010.003.002.05Oxide
13.0016.003.001.07Oxide + Sulfide
28.0032.004.004.12Sulphide
39.0040.001.003.40Sulphide
MBRRC269MC 1/10780.023.0025.002.001.95Oxide
Notes:
(1) Drilling samples were  assayed at:  the certified lab SGS in Port Klang, Malaysia, and some at the Selinsing internal lab;
(2)  All reported RC drill hole assay intercepts are generally associated with >40% recovery by weight relative to the theoretical
mass of the RC drilled interval
(3) Buffalo Reef RC drill holes with no significant assays (<0.31 g/t Au in oxide  and <0.62 g/t Au in sulfide ores): MBRRC181,
183, 189, 190, 193, 194, 196-198, 201-205, 207, 213, 215, 217, 218, 221, 223, 226-231, 234, 235, 239, 241-244, 247, 250, 251,
254-260, 264, 267, 270;
(4) Buffalo Reef RC/Diamond drill holes with no significant assays (<0.31 g/t Au in oxide  and <0.62 g/t Au in sulfide ores):
MBRRD261-263, 271, 272;
(5) Buffalo Reef RC drill holes which failed QAQC tests at the Selinsing in-house laboratory:  MBRRC185, 188, 192, 199, 250;
(6) Buffalo Reef RC drill holes with significant assay intervals but insufficient recovery to be reported:  MBRRC190, 217, 234, 239,
254, 257, and 259.
(7) Buffalo Reef RC or RC/Diamond holes with assays still in progress: MBRRD265, 266, and 268.
(8) Mineralisation is described as "Oxide + Sulfide" if geological logging indicates that the relevant interval contains either
alternating zones of oxidised and fresh rock, or is oxidised rock containing some sulphide minerals below the base of pervasive
oxidation .

"Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release."

Forward-Looking Statement

This news release includes statements containing forward-looking information about Monument, its business and future plans ("forward-looking statements"). Forward-looking statements are statements that involve expectations, plans, objectives or future events that are not historical facts and include  the effect the Company expects drill results to have on future resource estimates and the Company's plans with respect to its mineral projects and the timing and results of proposed programs and events referred to in this news release.  Generally, forward-looking information can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". The forward-looking statements in this news release are subject to various risks, uncertainties and other factors that could cause actual results or achievements to differ materially from those expressed or implied by the forward-looking statements.  These risks and certain other factors include, without limitation: risks related to general business, economic, competitive, geopolitical and social uncertainties; uncertainties regarding the results of current exploration activities and the interpretation of those results; uncertainties in the progress and timing of development activities; foreign operations risks; other risks inherent in the mining industry and other risks described in the management discussion and analysis of the Company and the technical reports on the Company's projects, all of which are available under the profile of the Company on SEDAR at www.sedar.com.  Material factors and assumptions used to develop forward-looking statements in this news release include:  the Company's expectation that drilling results will increase future resource estimates; expectations regarding the estimated cash cost per ounce of gold production and the estimated cash flows which may be generated from the operations, general economic factors and other factors that may be beyond the control of Monument; assumptions and expectations regarding the results of exploration on the Company's projects; assumptions regarding the future price of gold of other minerals; the expected timing and results of development and exploration activities; costs of future activities; capital and operating expenditures; success of exploration activities; mining or processing issues; exchange rates; and all of the factors and assumptions described in the management discussion and analysis of the Company and the technical reports on the Company's projects, all of which are available under the profile of the Company on SEDAR at www.sedar.com.  Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

SOURCE Monument Mining Limited

visit the company web site at www.monumentmining.com or contact:

Nick Kohlmann, MMY Toronto  
T: +1-647-478-3594  
[email protected]

Richard Cushing, MMY Vancouver 
T: +1-604-638-1661 x102 
[email protected]

Wolfgang Seybold, Axino GmbH  
T: +49 711-2535-92 40  
[email protected]

Copyright CNW Group 2014

View original source (CNW)Monument Mining Limited on 6ix

Story so far

Earlier from Monument Mining

Later from Monument Mining

All Monument Mining news releases