Mobilisaton commences for Lorelle-3
Filed with ASX · · 2 pages · English
• Mobilisation of the H&P FlexRig 3 Rig 648 from Brisbane to the Lorelle-3 well site has commenced with spud expected to occur within 2-weeks. Elixir Energy Limited (ASX: EXR, Elixir, the Company) provides an update on the Lorelle-3 appraisal drilling campaign in ATP2056 within Queensland’s Taroom Trough. Elixir has completed all procurement and preparation to commence the Lorelle-3 drilling campa
Earlier from Elixir Energy
- Elixir granted PCA 356 in the Taroom Trough
- Elixir & QGC Execute Taroom Trough Data Sharing Agreement
- Elixir Company Update
- Omega takes 19.4% stake supporting $16.6m raise
- OMA: OMA acquires 19.43% Equity Interest in Elixir Energy
Later from Elixir Energy
- Drilling operations commence at Lorelle-3
- Q2FY26 Quarterly Report and Appendix 5B
- Lorelle-3 Update
- Lorelle-3 intersects multiple Permian reservoirs
- Outstanding results at Lorelle-3
Follow Elixir Energy into a list and get an email when it puts out news.
Follow Elixir Energy