Gold Mineralisation Extended at 309 Deposit
Filed with ASX · · 23 pages · English
GBM Resources Limited (ASX: GBM) (“GBM” or “the Company”) is pleased to advise that it has received assay results for six of thirteen drillholes from Stage 1 of drilling at the 309 deposit, within the Company’s Twin Hills Gold Project (~1.0Moz Mineral Resource Estimate (“MRE”)) in the Drummond Basin, Queensland. Highlights: ▪ Stage 1 drilling at 309 materially enhances the geological and mineralis
Earlier from GBM Resources
- First Drill Results Extend Lone Sister Gold Mineralisation
- September 2025 Quarterly Report
- $40m Institutional Placement to Drive Drummond Basin Growth
- Trading Halt
- GBM Regains 100% Ownership of Mt Coolon Gold Project
Later from GBM Resources
- December 2025 Quarterly Report
- Outstanding High Grade Intersection 100m Outside 309 Deposit
- More High Grade Gold Outside of Resource at Twin Hills
- March 2026 Quarterly Report
- High Grade Gold Extends East of 309 Resource at Twin Hills
Follow GBM Resources into a list and get an email when it puts out news.
Follow GBM Resources